EVE Lab Topology Validation
Use this skill for the final QA and delivery phase of topology work.
Workflow
- Run the decision gate in
{baseDir}/references/decision-gate.md. - Produce the required output sections from
{baseDir}/references/output-structure.md. - Run the topology checks in
{baseDir}/references/checklists.md. - If the design will be implemented, use the ordered build plan from
{baseDir}/references/build-and-config-rules.md.
Guardrails
- Do not approve build work while unresolved gate items remain.
- State PASS, WARN, or FAIL directly.
- Put unresolved items in the final risks/open-questions section; do not silently skip them.
Failure Behavior
- On a tool error (timeout, unreachable host, malformed response), report the failure and its error message directly to the user rather than fabricating or guessing at results.
- For a confirmed read-only call, check connectivity and retry once if appropriate. For any call that changes state or sends a message, a timeout does not prove the action failed: inspect current state or delivery status before retrying, preserve the required approval/change gates, and do not repeat an action whose outcome is unknown.