<purpose>
<item>Transform fast spec into a set of tasks executable without additional analysis</item>
<item>Preserve consistency: each task must trace back to AC and architecture decisions</item>
</purpose>
<when_to_use>
<item importance="critical">Immediately after proto-spec, within the same planning iteration</item>
<item importance="high">When a short, executable MVP backlog is needed</item>
</when_to_use>
<required_preload>
<item>decomposition-strategy</item>
<item>planning-change-inventory</item>
<item>planning-scope-minimization</item>
<item>planning-estimation</item>
</required_preload>
<inputs>
<required>Proto-spec (requirements, AC, architecture constraints, file map)</required>
<optional>Release priorities and available team capacity</optional>
<optional>Technical dependencies and implementation sequence</optional>
</inputs>
<method>
<step>Split requirements into vertical increments (value-first)</step>
<step>Map each task to AC and concrete codebase changes</step>
<step>Determine execution order by dependencies and risks</step>
<step>Add mandatory validation tasks (tests/observability/review)</step>
<step>Verify each task is independent, testable, and scope-bounded</step>
</method>
<output_format>
<section>Task list (ordered)</section>
<section>Task to AC mapping</section>
<section>Dependencies and sequence</section>
<section>Definition of done per task</section>
<section>Scope-cut options (if timebox pressure)</section>
</output_format>
<quality_rules>
<rule importance="critical">Each task has a verifiable outcome and DoD</rule>
<rule importance="critical">No tasks without AC linkage or explicit technical necessity</rule>
<rule importance="high">Execution order accounts for critical dependencies</rule>
</quality_rules>
<do_not>
<item importance="critical">Do not decompose by layers without user value</item>
<item importance="high">Do not leave large ambiguous tasks without completion criteria</item>
</do_not>