Context
Use in Phase 3-4 once compliance clearance and trade documentation are in place. This skill turns
a cleared, documented shipment into an actual moving plan and closes out the engagement.
When to Use
- Incoterms term has not yet been selected for the deal
- Freight mode (sea/air/land) or forwarder needs to be compared
- Bonded-warehouse or transshipment logistics need planning
- Engagement is ready for final delivery handoff and closeout
Prerequisites
- Cleared export control status and any required export license
- Completed document package from trade-documentation-specialist
- Product characteristics (weight, volume, value density, perishability)
- Buyer/seller logistics capability assessment
Execution Steps
- Confirm Preconditions: Verify export license/control-status findings are cleared before
finalizing any logistics plan — a cleared shipment status is a precondition, not an afterthought.
- Incoterms Version Check: Before recommending a term, check whether the deal is governed by
an existing contract, PO, or LC that already cites an Incoterms version. Default to **Incoterms
2020 for new agreements. If the counterparty's paperwork cites 2000 or 2010**, do not
silently substitute the 2020 term — flag the version and any material difference (see table
below) so the parties can confirm whether to keep the legacy term or migrate to 2020.
- Incoterms Selection: Recommend the appropriate term given deal structure and each party's
risk appetite and logistics capability. For DDP specifically, confirm the seller has the
compliance/documentation capability to handle destination-country import clearance before
recommending it.
- Freight Mode Comparison: Compare sea/air/land freight on cost, transit time, and cargo
suitability (weight, value density, perishability, restricted-carrier concerns).
- Check Cargo Restrictions: Cross-check the recommended freight mode/route against any cargo
restriction identified by export-control-compliance-specialist (e.g. restricted carriers or
routes for controlled items).
- Forwarder Selection Criteria: Outline the criteria for forwarder selection relevant to this
shipment's specifics.
- Bonded Warehouse / Clearance Logistics: Plan any bonded-storage or transshipment steps,
coordinated with the customs clearance documentation already prepared.
- Final Delivery Handoff: Confirm all upstream deliverables (compliance findings, documents,
strategy) are consistent with the final logistics plan, then close out to PM.
Incoterms Version Reference (2000 → 2010 → 2020)
| Change | 2000 → 2010 | 2010 → 2020 |
|--------|-------------|-------------|
| Terms removed | DAF, DES, DEQ, DDU | — |
| Terms added | — | none (DAT renamed, not replaced) |
| Terms renamed | — | DAT → DPU (Delivered at Place Unloaded) |
| Term count | 13 → 11 | 11 → 11 |
| Classification | By mode of transport (unchanged) | Grouped by mode (unchanged) |
| Insurance (CIP) | Minimum cover (Institute Cargo Clause C) | CIP now requires higher cover (Clause A); CIF unchanged at Clause C |
| Security | Not addressed | Explicit security-related obligations/costs allocated |
| On-board notation | Not addressed | FCA now supports an on-board bill of lading option for letter-of-credit deals |
| Own-transport allowance | Not addressed | FCA/DAP/DPU/DDP allow the buyer/seller to arrange carriage with their own means of transport, not just a third-party carrier |
How to apply: If a cited term no longer exists in 2020 (DAF, DES, DEQ, DDU), do not assume a 1:1 mapping — confirm intent with both parties before recommending the nearest 2020 equivalent (e.g. DDU intent often maps to DAP, but risk/cost allocation must be re-verified, not copied over).
Output Format
- Logistics coordination plan: recommended Incoterms term with rationale, freight mode comparison,
forwarder selection criteria, bonded-warehouse/clearance logistics steps
- Final delivery handoff summary for PM closeout
Quality Criteria
- [ ] Recommended Incoterms term cites the correct version (2020 default) and rationale
- [ ] If counterparty paperwork cites a 2000/2010 term, the version was flagged (not silently mapped) and any material difference explained
- [ ] Freight mode comparison covers cost, transit time, and cargo suitability
- [ ] Bonded-warehouse/clearance logistics steps documented (if applicable)
- [ ] Export-control cargo restrictions (restricted carriers/routes) checked and incorporated
- [ ] Final delivery plan consolidated with all upstream engagement deliverables
Related Skills
- trade-documentation-checklist
- export-control-screening