Run My Ops Review
Cross-cutting Monday ritual. Two sub-reviews behind one primitive - usually want weekly review Mondays, wire metrics rollup into it.
When to use
period=weekly- "Monday ops review" / "weekly readout" / "what happened across my ops this week".period=metrics-rollup- "weekly metrics readout" / "how's the business doing this week" / "give me the data for the Monday review".
Connections I need
I run external work through Composio. Before this skill runs I check the categories below are linked. Missing → I name the category, ask you to connect it from the Integrations tab, stop.
- Warehouse / data source - Required for
period=metrics-rollup. Pulls fresh metric snapshots if the daily ones are stale. - Goal tracker (Notion, Airtable, Google Sheets) - Optional. Lets the weekly review reflect current goal state without a manual refresh.
This skill works without any connection for the weekly review - it leans on your saved work. I only block on metrics-rollup if no warehouse is connected.
Information I need
I read your operations context first. For every required field that's missing I ask ONE plain-language question (best modality: connected app > file drop > URL > paste) and wait.
- Active priorities - Required. Why I need it: the gaps-vs-priorities section keys off these. If missing I ask: "What are the 2 to 3 things the company is pushing on this quarter?"
- Operating rhythm - Required. Why I need it: makes "Monday review" mean the right thing for your week. If missing I ask: "What does your week look like - review day, deep-work days, meeting days?"
- What you're tracking - Required for
period=metrics-rollup. Why I need it: the rollup walks every metric you watch. If missing I ask: "Which numbers do you watch most closely? Best is to connect the dashboard or warehouse where they live." - Investor cadence - Optional. Why I need it: lets the review flag upcoming investor or board deadlines. If you don't have it I keep going with TBD and skip the deadline section.
Parameter: `period`
weekly- founder's Monday review. Aggregates last 7 days ofoutputs.jsonacross every skill in agent, cross-references active priorities + renewal calendar, flags gaps, surfaces next moves. Output:reviews/{YYYY-MM-DD}.md.metrics-rollup- cross-metric weekly pulse. Reads every tracked metric, computes week-over-week change, classifies vs direction, flags open anomalies. Feedsweeklyreview. Output:rollups/{YYYY-MM-DD}.md.
Steps
<!-- houston-workflow:v1 -->
- Read
config/context-ledger.json. Fill gaps with ONE modality-ranked question. - Read
context/operations-context.md- active priorities, operating rhythm, key contacts, vendor posture, hard nos. - Branch on
period:
If period = metrics-rollup:
- Read
config/metrics.jsonfor metric registry. - Each metric, read last 14 snapshots from
metrics-daily.json. - Compute: this-week value, last-week value, WoW delta, WoW %, classification vs declared direction (improved / stable / degraded), note any open anomaly in
anomalies.json. - Rank by biggest movement (absolute WoW%) first, then by priority (metrics tied to active priorities first).
- Write rollup as scannable table + 2-3 sentence commentary on top 3 movers.
If period = weekly:
- Optionally read latest
rollups/{YYYY-MM-DD}.mdif present - if not, consider suggestingmetrics-rolluprun before review, don't block. - Scan
outputs.jsonfor every entry withupdatedAtin last 7 days. Group by skill / domain. - Read
renewals/calendar.md- flag anything renewing in next 30 days. - Read
bottlenecks.jsonanddecisions.json(last 30 days). - Produce review:
- What shipped - by domain (Planning / People / Finance / Vendors / Data), bulleted with paths.
- What moved - top 3 metric movers from rollup if available.
- What's stale - things started but not touched 3+ weeks.
- Gaps vs priorities - each active priority → what we did for it this week → honest verdict (on-track / at-risk / off-track).
- Upcoming deadlines - renewals next 30d, investor updates due, board meetings.
- The one move - single most useful thing to do this week.
- Write atomically (
.tmp→ rename) to appropriate path. - Append to
outputs.jsonwith{id, type, title, summary, path, status: "ready", createdAt, updatedAt, domain: "planning" or "data"}. Type ="weekly-review"or"metrics-rollup". - Summarize to you: one move (weekly) or top 3 movers (rollup).
Outputs
reviews/{YYYY-MM-DD}.md(weekly)rollups/{YYYY-MM-DD}.md(metrics-rollup)- Appends to
outputs.json.
What I never do
- Claim progress on priority I can't evidence in
outputs.json. - Invent metric movement - if data missing, I say so.
- Replace decision ledger - if review surfaces decision-shaped item, flag as
log-a-decisioncandidate; don't record as one.