Post ic property setup

From mariourquia/cre-skills-plugin · View interactive version

Post ic property setup is an AI agent skill from the GitHub repository mariourquia/cre-skills-plugin. Pre-close shadow setup. Fires at IC approval (Handoff 1 in reference/connectors/_core/stack_wave4/lifecycle_handoffs.md) before the deal actually closes. Creates placeholder property in AppFolio (status: pre_acquisition), placeholder entity dim in Intacct, placeholder property_master_crosswalk + ass

How to use this skill

Skill file

Post-IC Property Setup

Workflow purpose

Between IC approval and deal close, pre-wire the operating and data-platform stack

so that the close-day handoff is a promotion rather than a cold start. The

workflow reserves identifiers, drafts placeholder rows, engages outside parties

(formation counsel, pre-close insurance carrier, tax-research provider), and

tracks readiness against the tolerance band. On close, it packages a

baton-pass payload for workflows/acquisition_handoff with every placeholder

id, crosswalk draft status, approval status, and known outstanding issue.

Trigger conditions

Inputs (required / optional)

| Input | Type | Required | Notes |

|---|---|---|---|

| Dealpath deal record (IC-approved, pre-close) | record | required | must include deal_id, asset_id, ic_approval_date, ic_approved_amount, deal_team_lead, expected_close_date, target_property_count, market, submarket, segment, form_factor, lifecycle_stage_target, management_mode |

| Canonical deal, asset placeholders | records | required | seeded by Dealpath adapter at IC approval |

| IC approval record | record | required | the IC approval_request row, per source_of_truth_matrix.md |

| Proposed property_name, address | payload | required | may be subject to re-trade or assignment change pre-close; the workflow accepts updates |

| Proposed legal entity structure | record | required | entity type, formation state, governing docs status |

| Tax-lot research intent | record | required | parcel ids, assessor packets, known appeals status |

| Pre-acquisition insurance binder plan | record | required | carrier, policy type, effective/expiry dates, deposit status |

| Handoff-lag tolerance band | yaml | required | from reference/normalized/schemas/reconciliation_tolerance_band.yaml |

| Approver roster | yaml | required | resolved per org overlay |

Outputs

| Output | Type | Shape |

|---|---|---|

| Pre-close setup checklist | handoff_checklist | per-item status (complete, in_progress, blocked, waived_with_approval) with owner, due-date, tolerance-band check |

| Readiness scorecard | kpi_review | pre_close_setup_completeness_score (proposed) + per-workstream completion % + lag days |

| Placeholder crosswalk drafts | record | proposed property_master_crosswalk.yaml row (status: pre_acquisition), asset_crosswalk.yaml row |

| AppFolio placeholder property payload | record | lifecycle_stage=pre_acquisition, reserved property_id, address, market, submarket |

| Intacct placeholder entity payload | record | reserved legal_entity_id, project/property dim draft |

| Baton-pass payload | record | consumed by workflows/acquisition_handoff at close |

| ApprovalRequest: deal_team_lead sign-off | record | row 17 pre-close gate |

| Unresolved exception list | checklist | items routed to master_data/unresolved_exceptions_queue.md |

Required context

asset_class, segment, form_factor, lifecycle_stage (always pre_acquisition), management_mode, market, deal_id, org_id. jurisdiction required for legal-entity formation. expected_close_date required to compute lag bands.

Process

  1. Receive IC approval event. Consume the Dealpath IC-approved trigger (Handoff 1 in lifecycle_handoffs.md). Confirm deal.stage = ic_approved and deal_close_date_actual is null. If deal_close_date_actual is already non-null, refuse and route to workflows/acquisition_handoff.
  2. Load baseline. Pull canonical placeholder deal, asset, and the IC approval_request record. Per source_of_truth_matrix.md, Dealpath is primary for deal and asset in the pre-close window.
  3. Reserve property_id. Allocate a canonical property_id from the org's reservation scheme; record as reserved-pending-close.
  4. AppFolio placeholder property. Draft the AppFolio payload with lifecycle_stage=pre_acquisition, status=pre_setup, populated address, market, submarket, segment, form_factor. Unit-level records remain empty until close. Per source_of_truth_matrix.md, AppFolio is primary for property once it exists; at this stage it is a placeholder.
  5. Intacct placeholder legal entity dim. Draft the Intacct entity dimension structure with reserved legal_entity_id. Per source_of_truth_matrix.md row property: secondary = intacct for legal_entity_id.
  6. Legal-entity formation routing. Engage counsel for the entity formation in the target jurisdiction. Track legal_entity_formation_lag_days (proposed) from IC approval. Formation delay risks breaking the close date; surface via row 17 if beyond band.
  7. Tax-lot and assessment research. Open a tax-lot research packet per parcel id. Track tax_lot_research_completion_rate (proposed). Known appeals or re-assessment activity flagged for asset_manager review.
  8. Pre-acquisition insurance binder. Bind pre-close insurance with carrier per reference/normalized/insurance_program__portfolio.csv minimum terms. Record pre_close_insurance_binder_lead_days (proposed). Binder must be in force by close date minus overlay-defined lead.
  9. Placeholder crosswalk drafts. Propose property_master_crosswalk.yaml row (status: pre_acquisition, canonical_id reserved) and asset_crosswalk.yaml row per master_data/crosswalk.schema.yaml. Proposed rows go to a staging area gated by workflows/owner_approval_routing before merge; see survivorship_rules.md.
  10. Readiness screen. Compute placeholder_crosswalk_creation_lag_days (proposed), pre_close_setup_completeness_score (proposed), and per-workstream lag. Any workstream exceeding the tolerance band triggers row 7.
  11. Baton-pass payload assembly. Compose the payload that workflows/acquisition_handoff will consume on close: reserved property_id, placeholder legal_entity_id, placeholder crosswalk ids, all approval statuses, all known issues.
  12. Deal-team-lead sign-off. Route the pre-close packet via workflows/owner_approval_routing row 17 for deal_team_lead sign-off. Sign-off is a condition of the baton-pass being marked ready.
  13. Close-date watch. If expected_close_date is less than overlay-defined lead (typically T-10 business days) and readiness score is below threshold, escalate to asset_mgmt_director.
  14. Confidence banner. Surface as_of_date and status tags for every reference file and crosswalk referenced; cite the lifecycle_handoffs.md handoff id (h_dp_to_approved_...).

Metrics used

Proposed metrics will be lifted into _core/metrics.md in a dedicated change-log entry before the workflow is promoted beyond draft.

Reference files used

Escalation points

Required approvals

Failure modes

  1. Premature promotion. Placeholder flipped to operating lifecycle_stage before close. Fix: workflow refuses promotion; that is acquisition_handoff's job.
  2. Missing IC record. IC approval record not present. Fix: dp_completeness_ic_record dq rule gates the workflow; refuse without it.
  3. property_id collision. Reserved property_id already in use. Fix: reservation via org scheme; workflow refuses on collision.
  4. Legal-entity formation silently delayed. Counsel engagement opened but not tracked. Fix: legal_entity_formation_lag_days is a mandatory checklist item.
  5. Binder gap at close. Binder expires before owner permanent policy binds. Fix: lead-day band enforced; row 17 escalation.
  6. Baton-pass marked ready without sign-off. Fix: sign-off gate is structural; baton is not ready without the approval record.
  7. Placeholder crosswalk merged to canonical before close. Fix: staging-area + survivorship enforcement; canonical merge is a close-time handoff, not a pre-close event.
  8. Close date moves and nobody re-checks the lag bands. Fix: close-date watch step fires on any expected_close_date change.
  9. Multi-asset deal not split at placeholder stage. Fix: dp_one_deal_multiple_projects check required; one placeholder instance per target property.

Edge cases

Example invocations

  1. "Open pre-close setup for deal d_2026_acq_004 (Riverwood). IC approval was 2026-03-22; expected close 2026-04-10."
  2. "Status of the Riverwood pre-close setup — flag any items outside the lag band."
  3. "Build the pre-close sign-off packet for the deal team lead on d_2026_acq_007."

Example outputs

Output — Pre-close setup checklist (abridged, Riverwood d_2026_acq_004)

Handoff id. h_dp_to_approved_2026Q1_acq_004 (per lifecycle_handoffs.md).

property_id reservation. complete. Reserved prop_riverwood pending close.

AppFolio placeholder property. complete. lifecycle_stage=pre_acquisition, address + market + submarket populated; unit records intentionally empty.

Intacct placeholder entity dim. in_progress. legal_entity_id=ENT_RIVERWOOD_LLC reserved; project dim drafted; Intacct dim creation pending counsel formation certificate.

Legal-entity formation. in_progress. Counsel engaged 2026-03-25; target effective date 2026-04-03; legal_entity_formation_lag_days=12 (within band).

Tax-lot research. complete. Three parcels researched; one parcel has open appeal flagged for asset_manager review.

Pre-acquisition insurance binder. complete. Bound 2026-04-01, effective 2026-04-10; pre_close_insurance_binder_lead_days=9.

Placeholder crosswalk rows. in_progress. property_master_crosswalk row draft pending review; asset_crosswalk row draft pending review; placeholder_crosswalk_creation_lag_days=6.

Baton-pass payload. ready_pending_signoff.

Readiness scorecard. pre_close_setup_completeness_score=0.83 (proposed).

ApprovalRequest. Pre-close sign-off packet routed to deal_team_lead via workflows/owner_approval_routing row 17.

Confidence banner. property_master_crosswalk@2026-03-31 (sample); asset_crosswalk@2026-03-31 (sample); lifecycle_handoffs.md@wave_4_authoritative; source_of_truth_matrix@wave_4_authoritative; reconciliation_tolerance_band@2026-03-31 (starter); dealpath_deal_pipeline@wave_4 (stub). Blocking rules cited: dp_handoff_lag, dp_one_deal_multiple_projects (neither fired).

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.