Post-IC Property Setup
Workflow purpose
Between IC approval and deal close, pre-wire the operating and data-platform stack
so that the close-day handoff is a promotion rather than a cold start. The
workflow reserves identifiers, drafts placeholder rows, engages outside parties
(formation counsel, pre-close insurance carrier, tax-research provider), and
tracks readiness against the tolerance band. On close, it packages a
baton-pass payload for workflows/acquisition_handoff with every placeholder
id, crosswalk draft status, approval status, and known outstanding issue.
Trigger conditions
- Explicit: "open pre-close setup for {deal}", "post-IC setup status", "reserve property_id for {deal}", "pre-close readiness for {property}".
- Implicit: Dealpath
deal.stagetransitions toic_approvedfor an acquisition deal type (Handoff 1 inreference/connectors/_core/stack_wave4/lifecycle_handoffs.md).deal_close_date_actualmust be null (post-IC but pre-close); if already non-null the workflow refuses and routes toworkflows/acquisition_handoff. - Recurring: none. Strictly event-driven from the IC approval trigger.
Inputs (required / optional)
| Input | Type | Required | Notes |
|---|---|---|---|
| Dealpath deal record (IC-approved, pre-close) | record | required | must include deal_id, asset_id, ic_approval_date, ic_approved_amount, deal_team_lead, expected_close_date, target_property_count, market, submarket, segment, form_factor, lifecycle_stage_target, management_mode |
| Canonical deal, asset placeholders | records | required | seeded by Dealpath adapter at IC approval |
| IC approval record | record | required | the IC approval_request row, per source_of_truth_matrix.md |
| Proposed property_name, address | payload | required | may be subject to re-trade or assignment change pre-close; the workflow accepts updates |
| Proposed legal entity structure | record | required | entity type, formation state, governing docs status |
| Tax-lot research intent | record | required | parcel ids, assessor packets, known appeals status |
| Pre-acquisition insurance binder plan | record | required | carrier, policy type, effective/expiry dates, deposit status |
| Handoff-lag tolerance band | yaml | required | from reference/normalized/schemas/reconciliation_tolerance_band.yaml |
| Approver roster | yaml | required | resolved per org overlay |
Outputs
| Output | Type | Shape |
|---|---|---|
| Pre-close setup checklist | handoff_checklist | per-item status (complete, in_progress, blocked, waived_with_approval) with owner, due-date, tolerance-band check |
| Readiness scorecard | kpi_review | pre_close_setup_completeness_score (proposed) + per-workstream completion % + lag days |
| Placeholder crosswalk drafts | record | proposed property_master_crosswalk.yaml row (status: pre_acquisition), asset_crosswalk.yaml row |
| AppFolio placeholder property payload | record | lifecycle_stage=pre_acquisition, reserved property_id, address, market, submarket |
| Intacct placeholder entity payload | record | reserved legal_entity_id, project/property dim draft |
| Baton-pass payload | record | consumed by workflows/acquisition_handoff at close |
| ApprovalRequest: deal_team_lead sign-off | record | row 17 pre-close gate |
| Unresolved exception list | checklist | items routed to master_data/unresolved_exceptions_queue.md |
Required context
asset_class, segment, form_factor, lifecycle_stage (always pre_acquisition), management_mode, market, deal_id, org_id. jurisdiction required for legal-entity formation. expected_close_date required to compute lag bands.
Process
- Receive IC approval event. Consume the Dealpath IC-approved trigger (Handoff 1 in
lifecycle_handoffs.md). Confirmdeal.stage = ic_approvedanddeal_close_date_actualis null. Ifdeal_close_date_actualis already non-null, refuse and route toworkflows/acquisition_handoff. - Load baseline. Pull canonical placeholder
deal,asset, and the ICapproval_requestrecord. Persource_of_truth_matrix.md, Dealpath is primary fordealandassetin the pre-close window. - Reserve property_id. Allocate a canonical
property_idfrom the org's reservation scheme; record as reserved-pending-close. - AppFolio placeholder property. Draft the AppFolio payload with
lifecycle_stage=pre_acquisition,status=pre_setup, populated address, market, submarket, segment, form_factor. Unit-level records remain empty until close. Persource_of_truth_matrix.md, AppFolio is primary forpropertyonce it exists; at this stage it is a placeholder. - Intacct placeholder legal entity dim. Draft the Intacct entity dimension structure with reserved
legal_entity_id. Persource_of_truth_matrix.mdrowproperty: secondary = intacct forlegal_entity_id. - Legal-entity formation routing. Engage counsel for the entity formation in the target jurisdiction. Track
legal_entity_formation_lag_days(proposed) from IC approval. Formation delay risks breaking the close date; surface via row 17 if beyond band. - Tax-lot and assessment research. Open a tax-lot research packet per parcel id. Track
tax_lot_research_completion_rate(proposed). Known appeals or re-assessment activity flagged for asset_manager review. - Pre-acquisition insurance binder. Bind pre-close insurance with carrier per
reference/normalized/insurance_program__portfolio.csvminimum terms. Recordpre_close_insurance_binder_lead_days(proposed). Binder must be in force by close date minus overlay-defined lead. - Placeholder crosswalk drafts. Propose
property_master_crosswalk.yamlrow (status:pre_acquisition, canonical_id reserved) andasset_crosswalk.yamlrow permaster_data/crosswalk.schema.yaml. Proposed rows go to a staging area gated byworkflows/owner_approval_routingbefore merge; seesurvivorship_rules.md. - Readiness screen. Compute
placeholder_crosswalk_creation_lag_days(proposed),pre_close_setup_completeness_score(proposed), and per-workstream lag. Any workstream exceeding the tolerance band triggers row 7. - Baton-pass payload assembly. Compose the payload that
workflows/acquisition_handoffwill consume on close: reserved property_id, placeholder legal_entity_id, placeholder crosswalk ids, all approval statuses, all known issues. - Deal-team-lead sign-off. Route the pre-close packet via
workflows/owner_approval_routingrow 17 for deal_team_lead sign-off. Sign-off is a condition of the baton-pass being markedready. - Close-date watch. If
expected_close_dateis less than overlay-defined lead (typically T-10 business days) and readiness score is below threshold, escalate to asset_mgmt_director. - Confidence banner. Surface
as_of_dateandstatustags for every reference file and crosswalk referenced; cite thelifecycle_handoffs.mdhandoff id (h_dp_to_approved_...).
Metrics used
pre_close_setup_completeness_score(proposed: true) — weighted completion of the pre-close setup checklist;grain=deal,time_basis=as_of_date.placeholder_crosswalk_creation_lag_days(proposed: true) — days between IC approval and placeholder-crosswalk row approval;grain=deal,time_basis=event_stamped.pre_close_insurance_binder_lead_days(proposed: true) — days between binder-in-force date and expected close;grain=deal, unit=days.legal_entity_formation_lag_days(proposed: true) — days between IC approval and entity formation effective date;grain=deal.tax_lot_research_completion_rate(proposed: true) — share of tax-lot research packets closed pre-close;grain=deal, unit=percent.handoff_baton_readiness_score(proposed: true) — composite of sign-off status + crosswalk-draft status + insurance-binder status that governs handoff readiness at close;grain=deal, unit=percent.
Proposed metrics will be lifted into _core/metrics.md in a dedicated change-log entry before the workflow is promoted beyond draft.
Reference files used
reference/connectors/_core/stack_wave4/lifecycle_handoffs.md— handoff definitions (Handoff 1).reference/connectors/_core/stack_wave4/source_of_truth_matrix.md— primacy and effective-dating rules fordeal,asset,property.reference/connectors/adapters/dealpath_deal_pipeline/manifest.yamlanddq_rules.yaml— source shape; blocking ruledp_handoff_lagcited;dp_completeness_ic_recordcited.reference/connectors/adapters/appfolio_pms/manifest.yaml— PMS primary forpropertyonce operating.reference/connectors/adapters/sage_intacct_gl/manifest.yaml— GL primary forlegal_entity_id, entity dims.reference/connectors/master_data/property_master_crosswalk.yaml,asset_crosswalk.yaml— crosswalks the workflow proposes placeholder rows for.reference/connectors/master_data/identity_resolution_framework.mdandcrosswalk.schema.yaml— identity and schema policy.reference/normalized/schemas/reconciliation_tolerance_band.yaml— lag thresholds and readiness bands.reference/normalized/approval_threshold_defaults.csv— approval thresholds (rows 7, 17, 19 per approval matrix).reference/normalized/insurance_program__portfolio.csv— minimum binder terms and carrier panel.
Escalation points
- Handoff lag. Any workstream exceeding the pre-close lag band routes to
data_platform_team -> regional_ops_director -> approval_requestrow 7. - Missing required approver. If the deal_team_lead sign-off cannot be routed, escalates per row 17.
- Legal-entity formation delay. Formation lag beyond overlay band routes to deal_team_lead + legal counsel per row 17.
- Insurance binder gap. Binder lead below overlay band routes to deal_team_lead + asset_mgmt_director per row 17.
- Doc package incomplete. Pre-close docs (formation package, tax-lot research, binder) below completeness threshold routes to
reporting_finance_ops_lead.
Required approvals
deal_team_lead_pre_close_signoff— row 17 (policy-overlay-marked action). Terminal pre-close gate; required to mark the baton-pass payloadready.legal_entity_formation_engagement— row 19 (contract binding the owner, counsel engagement).pre_acquisition_insurance_binder— row 17 (policy-overlay-marked action for binder binding pre-close).- Crosswalk row additions (placeholder rows) to master_data: routed via
workflows/owner_approval_routingpersurvivorship_rules.md.
Failure modes
- Premature promotion. Placeholder flipped to operating
lifecycle_stagebefore close. Fix: workflow refuses promotion; that isacquisition_handoff's job. - Missing IC record. IC approval record not present. Fix:
dp_completeness_ic_recorddq rule gates the workflow; refuse without it. - property_id collision. Reserved
property_idalready in use. Fix: reservation via org scheme; workflow refuses on collision. - Legal-entity formation silently delayed. Counsel engagement opened but not tracked. Fix:
legal_entity_formation_lag_daysis a mandatory checklist item. - Binder gap at close. Binder expires before owner permanent policy binds. Fix: lead-day band enforced; row 17 escalation.
- Baton-pass marked ready without sign-off. Fix: sign-off gate is structural; baton is not
readywithout the approval record. - Placeholder crosswalk merged to canonical before close. Fix: staging-area + survivorship enforcement; canonical merge is a close-time handoff, not a pre-close event.
- Close date moves and nobody re-checks the lag bands. Fix: close-date watch step fires on any
expected_close_datechange. - Multi-asset deal not split at placeholder stage. Fix:
dp_one_deal_multiple_projectscheck required; one placeholder instance per target property.
Edge cases
- Late deal close.
expected_close_dateslips. Lag bands recomputed; insurance binder term extended if required; tax-lot research re-validated if stale. - Multi-asset deal split. One deal spawns multiple properties. The workflow opens one pre-close setup instance per target property; parent deal carries union status.
- Dev TCO before punch list complete. Not applicable to acquisition; refer to
workflows/delivery_handofffor development path. - Partial delivery. Not applicable (delivery is a development concept).
- Vendor master not rationalized. Vendor rationalization is an
acquisition_handoffconcern; the pre-close workflow only stages reserved vendor relationships for later resolution. - Crosswalk row not created on time.
placeholder_crosswalk_creation_lag_daysbreach triggers data-platform escalation; the baton is notreadyuntil approved. - Lender notification missed. Lender registration is an
acquisition_handoffstep; the pre-close workflow only confirms the lender relationship is queued for that hand-off. - Insurance gap during transition. Seller policy end vs. owner binder effective is checked pre-close; any gap is pre-routed to legal + asset_mgmt_director.
- PMA execution lag. PMA execution is not a pre-close gate (PMA binds at close). The workflow only verifies a draft PMA is on file if
management_mode=third_party_managed. - Deal termination pre-close. If the deal terminates pre-close, the workflow calls the unwinder: reserved
property_idreleased, placeholder crosswalk rows withdrawn, binder cancellation routed, engagement letters closed. - Re-trade at IC. Re-trade triggers a refresh of placeholder address, unit count, and entity naming if relevant; lag clocks re-baseline at the amended IC approval.
Example invocations
- "Open pre-close setup for deal d_2026_acq_004 (Riverwood). IC approval was 2026-03-22; expected close 2026-04-10."
- "Status of the Riverwood pre-close setup — flag any items outside the lag band."
- "Build the pre-close sign-off packet for the deal team lead on d_2026_acq_007."
Example outputs
Output — Pre-close setup checklist (abridged, Riverwood d_2026_acq_004)
Handoff id. h_dp_to_approved_2026Q1_acq_004 (per lifecycle_handoffs.md).
property_id reservation. complete. Reserved prop_riverwood pending close.
AppFolio placeholder property. complete. lifecycle_stage=pre_acquisition, address + market + submarket populated; unit records intentionally empty.
Intacct placeholder entity dim. in_progress. legal_entity_id=ENT_RIVERWOOD_LLC reserved; project dim drafted; Intacct dim creation pending counsel formation certificate.
Legal-entity formation. in_progress. Counsel engaged 2026-03-25; target effective date 2026-04-03; legal_entity_formation_lag_days=12 (within band).
Tax-lot research. complete. Three parcels researched; one parcel has open appeal flagged for asset_manager review.
Pre-acquisition insurance binder. complete. Bound 2026-04-01, effective 2026-04-10; pre_close_insurance_binder_lead_days=9.
Placeholder crosswalk rows. in_progress. property_master_crosswalk row draft pending review; asset_crosswalk row draft pending review; placeholder_crosswalk_creation_lag_days=6.
Baton-pass payload. ready_pending_signoff.
Readiness scorecard. pre_close_setup_completeness_score=0.83 (proposed).
ApprovalRequest. Pre-close sign-off packet routed to deal_team_lead via workflows/owner_approval_routing row 17.
Confidence banner. property_master_crosswalk@2026-03-31 (sample); asset_crosswalk@2026-03-31 (sample); lifecycle_handoffs.md@wave_4_authoritative; source_of_truth_matrix@wave_4_authoritative; reconciliation_tolerance_band@2026-03-31 (starter); dealpath_deal_pipeline@wave_4 (stub). Blocking rules cited: dp_handoff_lag, dp_one_deal_multiple_projects (neither fired).