Pipeline Review
Workflow purpose
Deliver a weekly pipeline scorecard that the investments lead, asset-management director, and executive can read in one sitting to answer: which deals advanced, which stalled, where is the capital-need concentration, what is the IC load next session, and which blocking data-quality issues from Dealpath need resolution before the roll-up can be trusted. The workflow composes stage-by-stage counts, dollar-weighted exposure, and stalled-deal aging into a single dashboard; it recommends no deal-level action — every action remains with the deal team.
Trigger conditions
- Explicit: "weekly pipeline review", "pipeline scorecard", "pipeline dashboard for Monday", "where are we on IC load this cycle".
- Implicit: Dealpath adapter emits a pipeline-stage transition for 3+ deals in a week; week-close calendar event; IC calendar approaches within one cycle.
- Recurring: weekly, end-of-week close; also on-demand ahead of executive check-ins.
Inputs (required / optional)
| Input | Type | Required | Notes |
|---|---|---|---|
| Dealpath normalized deal records | table | required | via dealpath_deal_pipeline adapter; canonical shape per normalized_contract.yaml |
| Dealpath normalized deal_milestone records | table | required | primary source; covers stage transitions |
| Dealpath normalized deal_key_date records | table | required | LOI expiry, PSA expiry, expected close, close target |
| Canonical asset records | table | required | resolved via master_data/asset_crosswalk.yaml |
| Dealpath dq outcomes | table | required | dq_rules.yaml evaluation; blockers surface before roll-up |
| Stalled-deal aging policy | overlay | required | overlay-defined per stage; overlay_id + as_of_date |
| Debt term sheet policy bands | overlay | optional | market-level coupon and advance-rate bands; falls back to use_prior_period |
| IC calendar | reference | optional | next IC meeting date; falls back to overlay default cadence |
Outputs
| Output | Type | Shape |
|---|---|---|
| Stage-by-stage scorecard | kpi_review | count + dollar-weighted exposure per stage |
| Stalled-deal list | checklist | deal_id, stage, days in stage, owner, next step, policy band |
| IC-prep load summary | dashboard | deals on-docket, deals expected, capacity band |
| Debt term sheet variance table | kpi_review | deal_id, indicated terms vs. UW, variance, flag |
| Retrade-risk flag list | checklist | deal_id, reason, evidence, proposed follow-up |
| Pipeline narrative memo | memo | stage changes this week, capital-need concentration, DQ blockers, open items |
| Confidence banner | banner | adapter as_of_date, dq outcomes, overlay status tags |
Required context
asset_class=residential_multifamily, scope = portfolio (or a declared subset of assets / funds). Segment, form_factor, and lifecycle are not required at the deal grain but may be used to filter — the workflow defaults to all-segments roll-up if unspecified. market filter optional for market-scoped cuts. org_id required whenever approval-threshold bands or staffing bands are read.
Process
- Freshness + DQ gate. Load Dealpath adapter output; evaluate
dq_rules.yaml. Ifdp_completeness_ic_recordordp_freshness_dealsreturns a blocker, surface it at the top of the pack; refuse to claim any stage roll-up that the blocker affects. Warn ondp_handoff_lag. - Resolve canonical keys. Join Dealpath
deal.asset_idto canonicalasset_idviamaster_data/asset_crosswalk.yaml. Resolvemarketviamarket_crosswalk.yaml. Flag any unresolved rows; exclude from roll-up and list in DQ appendix. - Stage scorecard. Bucket active deals by canonical pipeline stage (
sourcing,loi_signed/under_loi,psa_signed/under_psa,under_dd,ic_review,ic_approved,debt_term_sheet/under_financing,pre_close,close/closed,funded). Compute count and dollar-weighted exposure (deal.total_costor equivalent from Dealpath contract). - Velocity. For each stage transition seen this week, compute
pipeline_velocity_daysper deal and roll up the stage median. Compare against overlay band; color within / below / above. - Stalled-deal scan. For each active deal, compute days-in-current-stage. Compare against overlay-defined stalled threshold per stage. Flag; include owner, last touch, next step note from Dealpath.
- IC-prep load. Count deals currently at
ic_revieworic_approvedpending final conditions; compare to overlay IC capacity band. Cross-link toworkflows/investment_committee_prep/if next IC is within one cycle. - Debt term sheet variance. For deals at
debt_term_sheet/under_financing, compare indicated terms (coupon, advance rate, DSCR test, covenant set) vs. last underwritten assumption. Computedebt_term_sheet_variance; flag deals outside overlay band. - Retrade-risk screen. Flag deals where any of the following hold: DD findings outside overlay tolerance, seller extension requested, market shift since LOI beyond overlay threshold, multi-party hesitation on recent key-date. List with evidence pointer. Cross-link to
workflows/pre_close_deal_tracking/for closing-week deals. - Capital-need concentration. Roll equity and debt capital requirements up by stage-weighted probability; call out any single deal exceeding overlay concentration band.
- Compose narrative memo. One paragraph per stage change category: advancing, stalled, debt-variance, retrade-risk, DQ-blocked. Cite every claim to a metric slug.
- Confidence banner. List adapter
as_of_date, DQ outcome status (pass / warn / blocker), overlaystatustags (starter,sample,approved), and any references that fell back to prior period.
Metrics used
See frontmatter metrics_used. All metric slugs for this workflow are proposed (proposed: true) — no deal-pipeline metric has landed in _core/metrics.md yet. The workflow surfaces computed values with the proposed flag on every output.
Reference files used
reference/connectors/adapters/dealpath_deal_pipeline/normalized_contract.yamlreference/connectors/adapters/dealpath_deal_pipeline/dq_rules.yamlreference/connectors/deal_pipeline/schema.yamlreference/connectors/master_data/asset_crosswalk.yamlreference/connectors/master_data/market_crosswalk.yamlreference/derived/role_kpi_targets.csvreference/normalized/approval_threshold_defaults.csv
Escalation points
- Stalled-deal aging breaches overlay threshold: deal_team_lead -> investments_lead -> asset_management_director.
- Debt market shift material (coupon spread or advance rate outside overlay band across multiple deals): investments_lead -> executive.
- DQ blocker from Dealpath adapter: data_platform_team -> investments_lead; roll-up paused for affected stages.
- Pipeline velocity outside band two consecutive cycles: investments_lead -> executive.
Required approvals
None. The pack is informational / recommendation severity. Any deal-level action surfaced here is owned by the originating workflow (deal team, capital sourcing, IC prep), which carries its own approval gate.
Failure modes
- Rolling up deals without checking
dp_completeness_ic_recordfirst. Fix: DQ gate is step 1; blocker halts the affected roll-up. - Reporting stalled-deal counts without overlay-defined thresholds. Fix: overlay
as_of_dateand band cited; no thresholds hardcoded in prose. - Merging deal counts across canonical stages after informal stage renaming in Dealpath. Fix:
map_dealpath_stageis the single mapping; unmapped stages flagged as DQ conformance blockers. - Double-counting deals in retrade-risk and stalled-deal lists. Fix: deals appearing on both lists are explicit; union reported with dedup.
- Reporting capital-need concentration without stage-weighted probability. Fix: probability applied; un-probabilitized figures not published.
- Missing adapter freshness check. Fix:
dp_freshness_dealsevaluated; stale feed surfaces banner and escalates.
Edge cases
- Stalled deal: days-in-stage exceeds overlay threshold — listed with owner, last activity, next-step note, and escalation path. If stalled > 2x threshold, escalates to investments_lead.
- Retrade in progress: deal shows PSA executed + DD findings + price renegotiation signal — flagged on retrade list with evidence pointer; counted separately from stalled.
- Declined-then-resurrected deal: deal previously
droppedor IC-declined that returns to active — surfaced with prior-decision pointer; treated as new stage entry for velocity purposes. - Deal renamed after IC: name change post-
ic_approvedtracked viadp_renamed_after_approval; roll-up uses stabledeal_id, surfaces prior name alias. - Multi-asset deal / portfolio acquisition: one Dealpath
deal_idmapping to multiple canonical assets viaproperty_master_crosswalk(manual_override) — listed with all target assets; capital-need counted once at deal level, exposure breakdown per asset. - Cross-fund allocation: deal tagged with multiple target funds — per-fund allocation carried through; concentration check applied per fund.
- Debt market shift: indicated coupon moves > overlay threshold week-over-week — flagged across affected deals; escalates to investments_lead.
- Partial closing (equity closes before debt or vice versa): shown as two stage positions; deal not claimed closed until both transitions recorded.
- Condition unresolved at close: ic_approved with open conditions whose deadline lapses — flagged, cross-linked to approval request, escalates per approval_matrix.
- Late legal entity setup: canonical
legal_entity_idnot populated post-close beyond overlay lag — surfaced as handoff warning (dp_handoff_lag); cross-linked toworkflows/acquisition_handoff/once it exists.
Example invocations
- "Produce the weekly pipeline review for Monday. Flag anything stalled past our 14-day LOI threshold."
- "Pipeline scorecard, portfolio-wide, as of Friday close. Highlight IC load for the next session and any debt variance."
- "What's retrade risk on this quarter's pipeline? Evidence list, not opinions."
- "Pipeline cut, Southeast markets only. Capital-need concentration by fund."
- "Run the pipeline review with focus on deals sourced in the last 30 days versus the rest."
Example outputs
See examples/example_pipeline_review_output.md for the full artifact shape.
Output — Stage scorecard (abridged)
Stages. sourcing (12 deals), under_loi (5), under_psa (3), under_dd (4), ic_review (2), ic_approved (3), under_financing (2), pre_close (1), closed (1 this week).
Velocity. pipeline_velocity_days (stage median) within band for sourcing, under_loi; above band for under_dd (flagged).
Stalled. 2 deals past overlay threshold — DP_DEAL_014 (under_loi, 21 days) and DP_DEAL_027 (under_dd, 34 days). Owners + next-step notes listed.
IC load. 2 on docket next cycle; overlay capacity band = 3; within capacity.
Debt variance. 1 deal outside band — DP_DEAL_009 coupon indicated at +55bps over UW assumption.
Retrade risk. 1 flag — DP_DEAL_027 (DD finding on roof scope; seller extension requested).
DQ banner. dp_freshness_deals: pass. dp_completeness_ic_record: pass. dp_handoff_lag: warn (1 closed deal, 4 days lag). Adapter as_of_date: sample / starter.
Confidence banner. References: dealpath_deal_pipeline@2026-04-14 (sample), asset_crosswalk@2026-04-15 (sample), role_kpi_targets@2026-03-31 (starter).