Lease up first period

From mariourquia/cre-skills-plugin · View interactive version

Lease up first period is an AI agent skill from the GitHub repository mariourquia/cre-skills-plugin. Operationalize the first 12-18 months post-delivery of a new-construction or gut-renovation asset: monthly tracker of lease-up velocity vs underwriting, concession depth vs market, approval-rate posture, traffic-source mix, broker-assist rate, model-unit performance, first-renewal retention readines

How to use this skill

Skill file

Lease-Up First Period

Workflow purpose

Give the leasing_director, regional_ops_director, asset_mgmt_director, and

investments_lead a single monthly view of a new-construction or gut-renovation asset

during its first 12-18 months post-delivery — so that drift from the underwriting

lease-up curve, concession escalation beyond the comp set, model-unit or marketing-

channel underperformance, and lender-reporting or equity-call timing risk surface in

the same month they occur.

This pack is ramp-aware. It is not the steady-state monthly review. It preserves

lease-up-specific metrics (lease_up_pace_vs_underwriting, concession_depth_vs_market,

noi_ramp_vs_underwriting, first_renewal_window_retention_readiness) and explicitly

annotates when a property crosses the stabilization threshold and the ownership-side

review cadence hands off to workflows/monthly_property_operating_review.

The workflow is read-heavy across two primary source systems — AppFolio for the

leasing funnel and lease execution, Excel for rent comp + concession benchmark — with

secondary pulls from Intacct (NOI actuals) and Procore (CCO timestamp) where the

property came from ground-up development. Cross-system posture is declared in

_core/stack_wave4/source_of_truth_matrix.md.

Trigger conditions

"how's the new asset performing", "South Fork lease-up tracker", "NOI ramp check".

within its overlay-defined lease-up window (typically 6-18 months post-delivery);

stabilization_pace_vs_plan breaches overlay band; concession_rate crosses lease-up

overlay ceiling; lender-reporting calendar event (quarterly or monthly per loan

overlay) approaches; fund equity-call milestone approaches; first-renewal window

(T60 days) opens for any lease-up-executed lease.

escalates to weekly cadence if lease_up_pace_vs_underwriting falls more than

overlay tolerance behind plan for two consecutive weeks.

Inputs (required / optional)

| Input | Type | Required | Notes |

|---|---|---|---|

| AppFolio rent roll snapshot | table | required | per appfolio_pms adapter |

| AppFolio lease register (all leases executed to date) | table | required | canonical lease |

| AppFolio lease-event log | table | required | canonical lease_event |

| AppFolio CRM funnel (leads, tours, applications, approvals) | table | required | lead, tour, application, approval_outcome |

| AppFolio charge + concession ledger | table | required | charge, concession_record |

| Excel market rent comp pack | table | required | per excel_market_surveys adapter |

| Excel concession benchmark pack | table | required | per excel_market_surveys adapter |

| Underwriting lease-up plan | table | required | weekly / monthly underwriting leased_occupancy curve; preserved per property on delivery |

| Underwriting NOI ramp | table | required | monthly underwriting NOI ramp |

| Loan covenant + lender-reporting calendar | yaml | required | per-loan overlay |

| Fund equity-call schedule | yaml | required | per-fund overlay (forward 90 days) |

| Marketing-channel mix reference | csv | required | segment-level; benchmark-only |

| Model-unit status + readiness log | log | optional | construction handoff artifact; used if ground-up |

| Broker assist identifier list | yaml | optional | Lead.source_channel values flagged broker-assist |

| Property_master_crosswalk | yaml | required | property_id resolution |

| Lease_crosswalk | yaml | required | lease_id resolution |

| Resident_account_crosswalk | yaml | required | resident_account_id resolution |

| Market_crosswalk | yaml | required | market scope resolution for rent comp + concession benchmark |

| Tolerance-band schema | yaml | required | reconciliation_tolerance_band.yaml |

Outputs

| Output | Type | Shape |

|---|---|---|

| Lease-up pace dashboard | dashboard | lease_up_pace_vs_underwriting (proposed), stabilization_pace_vs_plan, lease_up_pace_post_delivery, preleased_occupancy, leased_occupancy, economic_occupancy, cco_to_first_lease_days (proposed) |

| Concession posture | kpi_review | concession_rate, concession_depth_vs_market (proposed), policy ceiling check |

| Funnel posture | kpi_review | lead_response_time, tour_conversion, application_conversion, approval_rate, move_in_conversion, broker_assist_rate (proposed), model_unit_tour_conversion (proposed) |

| Traffic source mix | kpi_review | source-by-source lead volume, tour conv, application conv, executed-lease share |

| Model unit performance | memo | readiness status + model_unit_tour_conversion (proposed) contribution |

| First-renewal readiness | kpi_review | first_renewal_window_retention_readiness (proposed) for leases T60 days to first end_date |

| NOI ramp posture | kpi_review | noi_ramp_vs_underwriting (proposed), noi_margin, revenue_variance_to_budget, expense_variance_to_budget |

| Rent comp & market gap | kpi_review | rent_growth_new_lease, market_to_lease_gap |

| Lender-reporting compliance | kpi_review | lender_reporting_compliance_status (proposed) — per required submission |

| Equity-call schedule | kpi_review | equity_call_schedule_coverage (proposed) forward 90 days |

| Stabilization crossover check | memo | binary handoff indicator; cites overlay threshold |

| Narrative memo | memo | 3-5 paragraphs, cited metrics, top-3 watch items, handoff posture |

| Confidence banner | banner | reference as_of_date + status + sample-tag surfacing |

Required context

Asset_class, segment, form_factor, lifecycle_stage (must be lease_up), management_mode,

market, property_id, org_id. Delivery date (TCO and, where distinct, CCO) must be known

— the workflow computes all ramp metrics against weeks-post-delivery. Loan_id is

required if the property carries construction-to-permanent or permanent debt with a

lease-up-stage covenant or reporting obligation. Fund_id is required if the pack

reports equity-call posture.

Process

Step 1. Delivery anchor and ramp-week computation

Establish the anchor date. Pull property.acquired_date where applicable; for ground-up

projects pull CCO (certificate_of_occupancy_issued) from the Procore side per the

handoff posture declared in source_of_truth_matrix.md (Procore primary for

construction_project and schedule_milestone). If CCO differs from TCO, use CCO as

the first-lease anchor per loan overlay convention and annotate the gap via

cco_to_first_lease_days (proposed). Every pace metric in subsequent steps is

computed as "week N post-delivery" so the underwriting curve and actuals align at the

same x-axis.

Step 2. Lease-up pace vs underwriting

Compute:

semantics (lease status in {executed, in_effect} with preleased window per overlay).

(lease_up overlay typically widens to 60 days — cite the overlay).

leased occupancy at the same ramp-week.

underwriting-to-date at current ramp-week. The underwriting curve is frozen at

property delivery; any change in the underwriting curve is logged separately via

fund overlay and this pack annotates the change.

Flag any ramp-week where lease_up_pace_vs_underwriting (proposed) is more than the

overlay tolerance (cite reconciliation_tolerance_band.yaml::lease_up_pace_band)

behind plan. Two consecutive flags escalate cadence to weekly per trigger policy.

Step 3. Concession posture vs market

Compute:

new-lease average versus concession_benchmarks__{market}_mf.csv row matched on

segment + form_factor + lifecycle_stage=lease_up. Surface both the absolute gap and

the pct_comps_offering delta.

Flag:

governance; open or verify approval_request row 13 for policy-exceeding

concessions during lease-up.

(cite reconciliation_tolerance_band.yaml::concession_depth_band). This is the

concession-vs-rent tradeoff sentinel — escalate to leasing_director + asset_mgmt_director.

Every concession comparison cites the Excel comp source as_of_date and status

(sample / starter / live).

Step 4. Application approval rate + fair-housing guardrail

Compute:

band — the lease-up population is often demographically distinct from stabilized,

so the pack uses the lease-up-scoped band.

fair-housing flag — route to workflows/lead_to_lease_funnel_review's fair-housing

branch (row 3) rather than asserting here.

screening-drift finding; annotate but do not propose a screening change.

Fair-housing scanning is delegated to workflows/lead_to_lease_funnel_review; this

pack references the findings, not authors them.

Step 5. Traffic source mix and broker-assist posture

Group leads, tours, applications, and executed leases by Lead.source_channel.

Compute per-source:

reference plus property-level spend overlay; else annotate gap and skip).

Separately compute broker_assist_rate (proposed): share of executed leases whose

source_channel is in the broker-assist identifier list (optional overlay input). A

high broker-assist rate during lease-up is not a flag by itself — compare to

marketing_channel_mix__middle_market.csv benchmark to classify as within / above /

below expected for segment + market.

If there is a marketing rentup gap (i.e., total lead volume + conversion pace cannot

produce enough executed leases to track plan), route to leasing_manager + marketing_lead.

Step 6. Model unit performance

If ground-up with a model unit program:

whose record indicates a model-unit walk.

If the model unit is not ready (finishes incomplete, staging not complete, utilities

not live), flag as model_unit_readiness_gap — route to construction_manager +

leasing_manager. Do not propose a pricing change to compensate; surface the gap as a

non-pricing remediation.

Step 7. First-renewal window retention readiness

For any executed lease with end_date within T60 days of the run date:

(renewal_offer_issued, engaged, signed, declined, notice_given, unresponsive).

is structurally different from a stabilized renewal because the prior rent may have

been concession-burdened. Cite the overlay's first-renewal rent policy.

This is read-only for the steady-state renewal workflow: it surfaces the queue but

does not draft offers. Offer drafting lives in workflows/renewal_retention.

Step 8. NOI ramp posture

Pull monthly NOI from Intacct (per sage_intacct_gl adapter; Intacct is primary for

actual_line). Compute:

same month-post-delivery. Underwriting NOI ramp is frozen at delivery.

the lease-up-stage budget.

Flag any month where noi_ramp_vs_underwriting (proposed) is more than overlay

tolerance behind underwriting. Two consecutive flags escalate to investments_lead.

Step 9. Rent comp and market-to-lease gap

Surface the gap explicitly so the Excel comp as_of_date and status appear in the

confidence banner — market-to-lease-gap claims are among the most stale-data-sensitive

in the pack.

Step 10. Lender-reporting compliance

For each loan with a lease-up-stage reporting obligation (per loan overlay

reporting calendar):

the period: on_time, late, missed, waived.

asset_mgmt_director + reporting_finance_ops_lead. If a response requires a lender

submission, open approval_request row 14 (lender final submission gate).

This pack does not author lender submissions; it flags compliance posture. Submission

composition is in workflows/executive_operating_summary_generation when lender

output is needed.

Step 11. Equity-call schedule (unfunded reserves)

If the fund overlay declares equity-call schedule posture applies:

planned_amount, committed_amount, deployed_amount, due_date.

below planned_amount by more than overlay tolerance.

This pack does not initiate calls; it reports posture. Call initiation lives in

fund-level capital overlay.

Step 12. Stabilization crossover check

Compute whether the property has crossed the stabilization threshold (per overlay,

typically a sustained leased_occupancy above overlay-defined band for N consecutive

months). If crossed:

workflows/monthly_property_operating_review as the primary monthly cadence going

forward.

continues to be tracked here until the first-cohort renewals conclude.

The handoff is ownership-side signaled, not auto-executed. This pack surfaces the

signal; workflows/monthly_asset_management_review confirms and adjusts cadence.

Step 13. Top-3 watch items

Narrative synthesis. Name the three most consequential lease-up watch items this

month. Each watch item cites: property, metric slug, tolerance band reference, owning

workflow, proposed next action.

Step 14. Confidence banner

Every reference surfaced with as_of_date and status. Any sample-tagged reference

is explicit. Cross-system posture summary: AppFolio primary for leasing funnel + lease

execution; Excel primary for rent comp + concession benchmark; Intacct primary for

NOI actuals post-close; Procore primary for CCO timestamp where applicable.

Decision points and branches

escalates to weekly; hand off to leasing_director + asset_mgmt_director. Do not

propose pricing change here — route to workflows/market_rent_refresh for

re-pricing analysis.

sentinel — escalate to leasing_director + asset_mgmt_director. Do not propose a

policy exception here — overlay governs.

workflows/renewal_retention.

investments_lead.

lender response composition through workflows/executive_operating_summary_generation.

workflows/monthly_property_operating_review.

Metrics used

See frontmatter. Canonical metrics are inherited from the property-operations and

asset-management families. The proposed metrics (lease_up_pace_vs_underwriting,

concession_depth_vs_market, broker_assist_rate, model_unit_tour_conversion,

first_renewal_window_retention_readiness, noi_ramp_vs_underwriting,

lender_reporting_compliance_status, equity_call_schedule_coverage,

cco_to_first_lease_days) are lease-up-specific aggregations; formal promotion to

_core/metrics.md happens via a canonical change-control cycle. cco_to_first_lease_days

is shared with workflows/development_pipeline_tracking.

Reference files used

Escalation points

-> investments_lead. Route pricing question to workflows/market_rent_refresh.

leasing_director + asset_mgmt_director.

row 14 for any lender submission.

offer drafting to workflows/renewal_retention.

Required approvals

None for the tracker itself (informational / recommendation severity). Downstream

owning workflows carry their own gates:

workflows/executive_operating_summary_generation.

Failure modes

  1. Conflating TCO with CCO for the ramp anchor. Fix: anchor is CCO when both exist

and differ; annotate cco_to_first_lease_days (proposed) when CCO is the anchor.

  1. Comparing actual lease-up pace against a changing underwriting curve. Fix: the

underwriting curve is frozen at delivery; any change is logged via fund overlay

and annotated explicitly.

  1. Treating concession_rate and concession_depth_vs_market (proposed) as

equivalent. Fix: concession_rate is an internal ledger metric; concession_depth_vs_market

(proposed) is the comp-set-normalized tradeoff sentinel. Both are required.

  1. Drafting renewal offers from within this pack. Fix: offer drafting is delegated to

workflows/renewal_retention; this pack surfaces the queue only.

  1. Authoring lender submissions. Fix: lender output is composed in

workflows/executive_operating_summary_generation and gated at row 14.

  1. Initiating or adjusting equity calls. Fix: call initiation is fund overlay; this

pack reports posture only.

  1. Proposing concession-policy exceptions. Fix: overlay concession governance; row 13.
  2. Proposing screening-policy changes to close an approval_rate disparity. Fix:

screening policy is overlay; fair-housing findings route through

workflows/lead_to_lease_funnel_review at row 3.

  1. Reporting ramp pace without a frozen underwriting curve. Fix: if underwriting curve

is missing, refuse to compute lease_up_pace_vs_underwriting (proposed) and

noi_ramp_vs_underwriting (proposed); surface the gap.

  1. Sample overlay treated as authoritative rent comp or concession benchmark. Fix:

confidence banner surfaces sample-tag explicitly; Excel-sourced references are

the most stale-data-sensitive inputs in this pack.

Edge cases

but the model unit finishes or staging are incomplete. Flag as

model_unit_readiness_gap — route to construction_manager + leasing_manager.

Do not propose a pricing offset. Traffic is expected to underperform until the

model is usable; ramp-pace variance in this window is flagged with an explicit

cause attribution so it does not trigger spurious

lease_up_pace_vs_underwriting (proposed) alarms without context.

underwriting assumption; total lead volume cannot produce the required executed

leases at the planned conversion. Flag as marketing_rentup_gap — route to

leasing_manager + marketing_lead; escalate to regional_ops_director if unresolved

after one period. Do not infer the gap from pace alone; require cross-reference

against the marketing_channel_mix benchmark + available spend data, else annotate

as an attribution gap.

leased_occupancy in-line with underwriting but at concession depth exceeding the

comp-set benchmark — i.e., velocity is bought with concession dollars. Flag as

concession_rent_tradeoff_above_tolerance — escalate to leasing_director +

asset_mgmt_director -> investments_lead. The forward impact is on

noi_ramp_vs_underwriting (proposed) and on first-renewal retention; annotate the

linkage in the narrative.

stabilization before the first-cohort leases renew. Continue tracking first-renewal

retention here until the first-cohort renewals conclude, then hand off entirely.

Anchor is earliest CCO for aggregate pace; per-building anchors preserved in the

narrative for per-building variance. Overlay governs whether the underwriting curve

is phased or aggregate.

property is still ramping; equity-call posture becomes operational rather than

schedule-only. Escalate via equity_call_timing_drift path.

pointer; missing waiver documentation flips status to missed for the operator

view regardless of the lender-calendar marking.

back to segment benchmark (funnel_conversion_benchmarks__middle_market.csv) with

confidence: low annotation.

underwriting (e.g., combined unit, converted amenity space). Pace metrics rebase

to certified unit count; underwriting curve is marked for fund-overlay

reconciliation separately.

Example invocations

  1. "Run the monthly lease-up review for South Fork, month 4 post-delivery. Flag ramp pace vs underwriting."
  2. "Concession depth vs market check for Willow Creek lease-up this month."
  3. "Build the lease-up scorecard for South Fork; include NOI ramp, lender reporting status, and first-renewal readiness."
  4. "What's the traffic source mix at Atlantic Grove this month? Include broker-assist rate."
  5. "Is South Fork ready to hand off to steady-state monthly ops review?"

Example outputs

Output — Monthly lease-up review (abridged, South Fork, month 5 post-delivery, April 2026)

Delivery anchor. CCO 2025-11-18; month 5 post-delivery; cco_to_first_lease_days

(proposed) actual 14 days. Underwriting curve frozen at delivery.

Lease-up pace. leased_occupancy 48.3%; underwriting target at month 5 is 55.0%.

lease_up_pace_vs_underwriting (proposed) = 0.88. Below overlay tolerance band (0.90

floor per reconciliation_tolerance_band.yaml::lease_up_pace_band). Second

consecutive month below band; cadence escalates to weekly per trigger policy; hand off

to leasing_director + asset_mgmt_director.

Concession posture. concession_rate 62% of new leases carry a concession.

concession_depth_vs_market (proposed) +0.4 months offered vs market benchmark of

1.2 months (comp: concession_benchmarks__charlotte_mf.csv@2026-03-31 (starter)).

Within overlay tolerance this month but trending toward the concession-vs-rent

tradeoff ceiling.

Funnel. lead_response_time p50 within band. tour_conversion within band.

application_conversion within band. approval_rate within band; no fair-housing

disparity flag. move_in_conversion within band.

Traffic source mix. Paid search + broker-assist together carry 68% of executed

leases. broker_assist_rate (proposed) = 31%, above segment benchmark of ~18%.

Narrative: broker-assist overperforming; paid-search CPL rising. Marketing rentup

gap not yet flagged but watched.

Model unit performance. Ready since month 2. model_unit_tour_conversion

(proposed) = 46%, above overall tour_conversion of 38%. Model unit is an

above-average converter; no readiness gap.

First-renewal readiness. No leases yet in T60 first-renewal window (earliest

cohort first-renewal in month 12).

NOI ramp. Month 5 NOI at 61% of underwriting NOI ramp at month 5.

noi_ramp_vs_underwriting (proposed) = 0.61. Behind underwriting; concession depth

and operating expense ramp both contributing. Not yet escalated (requires two

consecutive months below); watched.

Rent comp & market gap. market_to_lease_gap within comp-set expected range;

headline rents in-line with comp set of stabilized product. Comp: market_rents__charlotte_mf.csv@2026-03-31 (starter).

Lender-reporting compliance. Quarterly lease-up report due 2026-04-15.

lender_reporting_compliance_status (proposed) = on_time for the March report

submitted 2026-04-02. No misses.

Equity-call schedule. Forward 90-day: one call scheduled 2026-06-10 at

planned_amount $4.2M; committed_amount $4.2M. Coverage within band; no drift.

Stabilization crossover. Not reached. Overlay threshold is leased_occupancy >=

92% for 3 consecutive months. Handoff to workflows/monthly_property_operating_review

deferred.

Top-3 watch items.

  1. lease_up_pace_vs_underwriting (proposed) = 0.88 second month running — weekly

cadence begins; route pricing question to workflows/market_rent_refresh.

  1. concession_depth_vs_market (proposed) +0.4 months above market — within

tolerance but trending; narrative flags tradeoff risk.

  1. noi_ramp_vs_underwriting (proposed) = 0.61 — watched; second-month flag triggers

escalation to investments_lead.

Confidence banner.

References: source_of_truth_matrix@wave_4_authoritative,
appfolio_pms/normalized_contract@2026-04-08 (starter),
market_rents__charlotte_mf@2026-03-31 (starter),
concession_benchmarks__charlotte_mf@2026-03-31 (starter),
funnel_conversion_benchmarks__middle_market@2026-03-31 (sample),
marketing_channel_mix__middle_market@2026-03-31 (starter),
reconciliation_tolerance_band@2026-03-31 (sample),
role_kpi_targets@2026-03-31 (starter).
Proposed metrics (flagged): lease_up_pace_vs_underwriting,
concession_depth_vs_market, broker_assist_rate,
model_unit_tour_conversion, first_renewal_window_retention_readiness,
noi_ramp_vs_underwriting, lender_reporting_compliance_status,
equity_call_schedule_coverage, cco_to_first_lease_days.
Cross-system posture: AppFolio primary for funnel+lease execution;
Excel primary for rent comp+concession benchmark; Intacct primary
for NOI actuals post-close; Procore primary for CCO timestamp.
Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.