Executive pipeline summary is an AI agent skill from the GitHub repository mariourquia/cre-skills-plugin. Monthly executive rollup of pipeline state for the residential_multifamily subsystem. Aggregates Dealpath (deal pipeline), Procore (active development pipeline), and Intacct (capex commitment exposure) into a board-ready or IC-ready summary. Designed for the executive and IC audiences with per-metri

How to use this skill

Skill file

Executive Pipeline Summary

Workflow purpose

Produce the monthly executive-grade pipeline summary: the document that leaves

the investments and development teams and goes to the executive and to the IC.

The pack is a cross-system rollup, synthesizing deal-pipeline posture

(Dealpath), active development pipeline posture (Procore), and posted capex

commitment exposure (Intacct) into a narrative-first board-ready or IC-ready

document.

The pack composes the pipeline layer of the executive story. It sits alongside

workflows/executive_operating_summary_generation (operating posture) and

workflows/quarterly_portfolio_review (portfolio trend). Together these three

packs cover the three executive narrative arcs: operating, portfolio, pipeline.

This pack is gated. Any final-marked external submission (board packet, IC

advance read, capital-partner memo) requires row 16 (board) or row 17 (IC

advance read, if the overlay requires IC gating) before transmission. The

formal submission bundle composition lives in

workflows/executive_operating_summary_generation; this pack stops at the

narrative + dashboard and an opened approval request.

Trigger conditions

summary", "IC docket summary", "capital deployment pace update", "pipeline

concentration check", "declined deal hit rate report".

(forward 90-day docket becomes active); Dealpath stage transition volume

crosses overlay band; Procore commitment exposure crosses overlay band;

concentration threshold (market / segment / JV partner) crossed; capital

deployment pace ytd drifts below target band; material debt-market shift

flagged.

packet submission; IC-calendar-driven for IC advance-read composition.

Inputs (required / optional)

| Input | Type | Required | Notes |

|---|---|---|---|

| Dealpath deal register | table | required | stage in {sourced, loi_signed, psa_signed, ic_approved, debt_term_sheet, close, funded, declined, on_hold} |

| Dealpath deal-milestone log | table | required | per-deal milestone state; ic_scheduled_date, expected_close_date |

| Dealpath IC decision log | table | required | approved, declined, deferred |

| Procore project roster | table | required | all active construction_projects + development_projects |

| Procore commitment register | table | required | open commitments + remaining exposure + retention |

| Intacct capex actuals feed | table | required | posted spend by capex_project dimension |

| Fund capital-deployment plan | yaml | required | per-fund ytd target and forward plan |

| Debt market context overlay | yaml | required | categorical band; update cadence per overlay |

| JV partner register | yaml | required | per-partner pipeline + owned dollar exposure |

| Portfolio concentration targets | csv | required | market / segment / jv partner thresholds |

| Sourcing funnel log | table | required | top-of-funnel additions T30 + broker / repeat-broker / direct flags |

| Declined deal register + outcomes | table | required | declined deals with transacted-elsewhere flag T12m |

| Asset_crosswalk | yaml | required | asset resolution |

| Market_crosswalk | yaml | required | geographic concentration resolution |

| Dev_project_crosswalk | yaml | required | dealpath deal <-> procore project <-> intacct project |

| Capex_project_crosswalk | yaml | required | procore project <-> intacct project |

| Tolerance-band schema | yaml | required | reconciliation_tolerance_band.yaml |

| Board packet template | md | conditional | required if audience = board |

| IC advance-read template | md | conditional | required if audience = ic |

| Quarterly portfolio review | pack | optional | for cross-linkage in narrative |

| Executive operating summary | pack | optional | for cross-linkage in narrative |

Outputs

| Output | Type | Shape |

|---|---|---|

| Pipeline stage rollup | dashboard | pipeline_stage_committed_dollars (proposed) by stage; counts + dollars |

| Expected close schedule | kpi_review | expected_close_by_month (proposed) forward 12 months |

| IC docket forward 90 days | kpi_review | ic_docket_forward_90d (proposed); per-deal row |

| Capex commitment exposure | kpi_review | capex_commitment_forward_exposure_dollars (proposed) forward 12 months |

| Debt market context | memo | debt_market_context_band (proposed) + overlay citation |

| Capital deployment pace | kpi_review | capital_deployment_pace_vs_target (proposed) ytd |

| Declined deal hit rate | kpi_review | declined_deal_hit_rate (proposed) + cohort detail |

| Top-of-funnel sourcing health | kpi_review | top_of_funnel_sourcing_health (proposed) composite |

| JV partner concentration | kpi_review | jv_partner_concentration (proposed) per partner |

| Geographic concentration | kpi_review | geographic_concentration_pipeline (proposed) + owned context |

| Segment concentration | kpi_review | segment_concentration_pipeline (proposed) + owned context |

| Confidence bands | appendix | confidence_band_per_metric (proposed) — low/medium/high per metric |

| Narrative summary | memo | 1-2 pages, cited metrics, top-3 pipeline watch items |

| Draft board packet section | operating_review | if audience = board |

| Draft IC advance read | operating_review | if audience = ic |

| Approval request | object | row 16 (board) or row 17 (IC) opened on final |

| Confidence banner | banner | reference as_of_date + status + sample-tag surfacing |

Output contract

Final-marked output MUST follow _core/executive_output_contract.md:

verdict-first block (recommendation, 3-bullet rationale, confidence,

materiality, next action), source-class labels on every numeric cell

([operator] / [derived] / [benchmark] / [overlay] /

[placeholder]), and refusal-artifact shape when a required reference

is absent. Any [placeholder]-tagged cell blocks board / IC approval

request assembly (rows 16 / 17).

Required context

Asset_class, segment (one or many), audience (board, ic, internal_executive),

org_id, period (month). Audience governs template and approval row. Fund_id is

required if the pack reports capital-deployment pace at fund grain. Board

calendar date is required if audience is board. IC calendar date is required

if audience is ic.

Process

Step 1. Audience resolution and period anchor

Resolve audience (board, ic, internal_executive). Load the corresponding

template and approval row:

template.

Anchor the period (typically prior-month close). Every forward-looking metric

is computed relative to the anchor.

Step 2. Pipeline stage rollup

Pull the Dealpath deal register (per dealpath_deal_pipeline/normalized_contract.yaml

— Dealpath is primary for deal and asset through close per

source_of_truth_matrix.md). Bucket deals by stage:

Compute pipeline_stage_committed_dollars (proposed) per bucket: sum of

deal.deal_size (or whatever canonical field carries dollar commitment,

resolved via the Dealpath adapter contract). Counts + dollars.

If any deal fails the Dealpath DQ check (dp_completeness_ic_record,

dp_handoff_lag, other), surface as a blocker line in the reconciliation

posture section. Do not silently exclude.

Step 3. Expected close by month

For every deal with deal.expected_close_date populated, bucket by

forward month. Compute expected_close_by_month (proposed): forward 12

months, counts + dollars. Annotate any deal whose expected_close_date is in

the past and whose stage is not close / funded / declined —

stage-mapping inconsistency routes to development/investments data hygiene.

Step 4. IC docket forward 90 days

Pull deal_milestone.ic_scheduled_date across open deals within the next 90

days. Compute ic_docket_forward_90d (proposed): per-deal row with deal_size,

stage, jv_partner, market, segment, and ic_scheduled_date. Sort by

ic_scheduled_date.

For each deal on the docket, annotate readiness state (per overlay: diligence

complete, debt term sheet status, committee materials ready). Readiness drift

is advisory here; IC-prep orchestration lives in

workflows/pre_close_deal_tracking and related packs.

Step 5. Capex commitment exposure forward 12 months

Pull the Procore commitment register per the active development pipeline.

Compute capex_commitment_forward_exposure_dollars (proposed): sum of

open_commitment.remaining forward 12 months across all active projects. This

metric is inherited from workflows/development_pipeline_tracking; reuse the

computed value rather than recomputing unless the development pipeline tracker

has not run within the overlay-defined freshness window.

For each commitment, check pc_recon_commitment_overdrawn. Any overdrawn

commitment is surfaced here as a material blocker in the pipeline-to-posted-spend

reconciliation — route to Procore runbook commitment_overdrawn. Do not

propose capex reallocation here; that is

workflows/cost_to_complete_review + capex capital overlay.

Cross-system reconciliation posture cited: pc_recon_commitment_vs_posted_spend

(Procore vs Intacct), pc_recon_commitment_overdrawn, dp_handoff_dev_lag

(Dealpath-to-Procore handoff).

Step 6. Debt market context band

Read debt_market_context_band (proposed) from debt-market overlay. This is

a categorical band (tight, neutral, loose), cited not computed. The

overlay carries the update cadence and the reasoning for the current band;

the pack surfaces both.

Forward implications: any band shift changes the close-certainty commentary on

deals in debt_term_sheet stage. Annotate the linkage; do not re-underwrite

deals here.

Step 7. Capital deployment pace vs target

Read fund capital-deployment plan. Compute capital_deployment_pace_vs_target

(proposed): (capital_deployed_ytd / capital_deployment_target_ytd) per fund

overlay. capital_deployed_ytd is the sum of equity-call deployments ytd per

the fund's capital overlay; capital_deployment_target_ytd is the fund's ytd

deployment plan frozen at fund start or at the most recent approved plan

amendment.

Flag any fund where capital_deployment_pace_vs_target (proposed) is below

the overlay band (typically 0.85 floor) — escalate to cfo_finance_leader +

investments_lead. Do not propose a re-calibration here; that is fund-level

capital overlay.

Step 8. Declined deal hit rate

Pull declined-deal register for the trailing 12 months. For each declined

deal, check whether the same asset (via asset_crosswalk) or substantially

similar asset transacted elsewhere within 12 months. Compute

declined_deal_hit_rate (proposed): (declined_deals_that_transacted_elsewhere /

total_declined_deals_in_period).

Attribution categories: priced-out (competitor paid above our underwriting),

diligence-findings (we declined for a discoverable risk), market-timing

(declined pre-market-move), stale-pipeline (declined and not transacted).

Cohort the hit rate by attribution category.

This metric backtests IC decision discipline. Not a proxy for

"should we have bought it" in isolation — overlay commentary governs

interpretation.

Step 9. Top-of-funnel sourcing health

Compute top_of_funnel_sourcing_health (proposed): composite of

(new_deals_added_T30, broker_sourced_share, repeat_broker_share,

direct_sourced_share) from the sourcing funnel log. Compare to sourcing

overlay targets.

Low direct-sourced share or rising share from a small number of repeat

brokers is a concentration signal — route to development_lead for sourcing

coverage review.

Step 10. JV partner concentration

Compute jv_partner_concentration (proposed): per-partner dollar exposure

across pipeline + owned. Compare to portfolio_concentration_targets.csv

(partner thresholds) and to the owned-asset JV mix.

Flag any partner whose combined pipeline + owned exposure crosses overlay

threshold — escalate to portfolio_manager + investments_lead.

Step 11. Geographic and segment concentration

Compute:

pipeline_stage_committed_dollars (proposed).

pipeline_stage_committed_dollars (proposed).

Compare to portfolio_concentration_targets.csv and to owned-asset

concentration from portfolio_concentration_market (canonical). The narrative

covers both pipeline and owned, so concentration movement across the

pipeline-to-owned bridge surfaces.

Flag any crossing of overlay threshold — escalate to portfolio_manager +

investments_lead.

Step 12. Confidence bands per metric

For every metric surfaced, compute confidence_band_per_metric (proposed):

categorical (low, medium, high) derived from:

source_of_truth_matrix.md).

Confidence bands are prominent on the board-ready output. No metric is

surfaced without its band.

Step 13. Reconciliation posture summary

Cite and surface the following cross-system reconciliation findings:

(Dealpath dq + recon).

pc_recon_co_approved_vs_invoice_posted, pc_recon_draw_approved_vs_cash_funded

(Procore recon).

Any blocker reduces the affected metric to low confidence and surfaces in

the reconciliation memo with runbook pointer.

Step 14. Narrative synthesis

Compose narrative anchored to cited metrics. Structure per template

(typical: headline, pipeline state, capital deployment, concentration posture,

IC docket, declined-deal discipline, sourcing health, forward view).

signal as an explicit executive decision point — do not bury.

Step 15. Draft package assembly

The pack composes the draft and opens the approval request; it does not send.

Step 16. Approval routing

draft_for_review.

The workflow never releases a submission marked final without an approved

row. Transmission composition lives in

workflows/executive_operating_summary_generation.

Step 17. Confidence banner

Every reference surfaced with as_of_date and status. Proposed metrics

flagged. Cross-system posture summary: Dealpath primary for deal pipeline;

Procore primary for active development + commitments; Intacct primary for

posted capex spend + capital deployment (where applicable). Per-metric

confidence bands are surfaced prominently; the board-ready output carries a

dedicated confidence section.

Decision points and branches

portfolio_manager + investments_lead -> executive.

investments_lead.

trail required per overlay; narrative covers attribution cohort.

workflows/cost_to_complete_review + Procore runbook; capex commitment

exposure metric drops to low confidence until resolved.

transmission pathway.

approval_request row 17.

Metrics used

See frontmatter. The pack primarily introduces pipeline-specific proposed

metrics (pipeline_stage_committed_dollars, expected_close_by_month,

ic_docket_forward_90d, debt_market_context_band,

capital_deployment_pace_vs_target, declined_deal_hit_rate,

top_of_funnel_sourcing_health, jv_partner_concentration,

geographic_concentration_pipeline, segment_concentration_pipeline,

confidence_band_per_metric). capex_commitment_forward_exposure_dollars is

inherited from workflows/development_pipeline_tracking. Canonical metrics

(portfolio_concentration_market, asset_watchlist_score, budget_attainment,

forecast_accuracy, capex_spend_vs_plan) are inherited-context only; not

recomputed here.

Reference files used

Escalation points

workflows/executive_operating_summary_generation.

-> executive.

portfolio_manager + investments_lead -> executive.

construction_manager + asset_mgmt_director.

Required approvals

IC gating.

draft_for_review.

pathway composition lives in workflows/executive_operating_summary_generation.

Failure modes

  1. Reporting pipeline dollars without confidence bands. Fix: every metric

carries a confidence_band_per_metric (proposed); board-ready output

surfaces the band.

  1. Silently excluding deals failing Dealpath DQ. Fix: DQ blockers are cited

as a blocker line; affected metrics are not silently reduced.

  1. Recomputing capex commitment forward exposure. Fix: inherit from

workflows/development_pipeline_tracking; only recompute if the tracker

has not run within freshness window.

  1. Authoring pricing or re-underwriting language in the debt market context

section. Fix: debt market context is a cited categorical band; individual

deal re-underwriting lives in deal-level packs.

  1. Proposing capital deployment pace corrections. Fix: fund-level capital

overlay governs; this pack reports posture only.

  1. Proposing a JV partner / market / segment concentration cap change. Fix:

portfolio_concentration_targets.csv is overlay-driven; this pack reports

breach and escalates.

  1. Treating declined_deal_hit_rate as "should we have bought it". Fix:

overlay commentary governs interpretation; cohort attribution is required.

  1. Sending the board packet. Fix: transmission is gated at row 16.
  2. Missing IC docket readiness drift because IC-prep orchestration is

downstream. Fix: surface readiness drift as advisory; do not attempt to

orchestrate IC prep here.

  1. Sample overlay used as authoritative debt market context. Fix: debt

market context band carries its own as_of_date + status; sample is

surfaced explicitly.

  1. Letting a Procore commitment-overdrawn finding silently pass into the

capex commitment exposure metric. Fix: pc_recon_commitment_overdrawn

downgrades the metric to low confidence and appears in the

reconciliation memo.

Edge cases

pipeline (new sponsor group, re-offering, recapitalization). The pack

flags the resurrection with an audit trail citation to the original

decline and attribution category. Any re-engagement requires an explicit

executive decision — do not default to pipeline inclusion without

investments_lead confirmation.

same month; pipeline_stage_committed_dollars (proposed) swings

materially between close and funded. Narrative distinguishes between

scheduled close and actual funded to avoid double-counting. Forward

capex commitment exposure steps up once Procore projects execute —

dp_handoff_dev_lag watch begins immediately for each new closing.

changes to the pipeline narrative. Pack behavior: if invoked during

freeze, produce the narrative + dashboard but defer approval_request

row 16 opening until freeze lifts; annotate the freeze in the output.

within the 90-day window. Recompute ic_docket_forward_90d (proposed)

at each invocation — do not cache across invocations.

positions across multiple fund vehicles. Aggregate per-partner exposure

across vehicles for jv_partner_concentration (proposed); annotate the

cross-fund concentration per overlay.

shifts. Use the most recently approved plan as the denominator; annotate

the amendment date.

within overlay freshness window. Surface the stale as explicit; the

metric drops to low confidence; narrative does not assert market

direction.

share of declines attributed to a single category exceeds the

declined_pool_attribution_concentration_band from

reference/normalized/schemas/reconciliation_tolerance_band.yaml, the

narrative surfaces the concentration as a sourcing / underwriting signal

— escalate to investments_lead for discipline review.

deal.expected_close_date in Dealpath. Annotate as a Dealpath DQ gap;

do not impute. Affects expected_close_by_month (proposed) confidence.

resolve the pipeline asset to a single canonical asset_id (duplicate

match or no match). Flag; do not collapse. Declined-deal hit rate

computation excludes the ambiguous row until resolved.

Example invocations

  1. "Build the monthly executive pipeline summary for April 2026; audience board."
  2. "IC docket forward 90 days; include readiness drift annotations."
  3. "Capital deployment pace vs target for the core fund this month."
  4. "Concentration check — pipeline + owned — by market and JV partner."
  5. "Declined deal hit rate for Q1 2026 with attribution cohorts."
  6. "Top-of-funnel sourcing health check this month."

Example outputs

Output — Monthly executive pipeline summary (abridged, April 2026, audience: board)

Audience. Board. Row 16 approval will open on final.

Pipeline stage rollup.

| Stage | Count | Dollars | Confidence |

|---|---|---|---|

| sourced | 18 | $485M | medium |

| loi_signed | 6 | $210M | medium |

| psa_signed | 4 | $165M | high |

| ic_approved | 2 | $92M | high |

| debt_term_sheet | 3 | $118M | medium |

| close | 1 | $48M | high |

| funded | 2 (April) | $86M | high |

| declined (T30) | 7 | $305M | high |

| on_hold | 3 | $110M | medium |

pipeline_stage_committed_dollars (proposed) aggregated above. Two deals

funded April; three deals in debt_term_sheet stage are exposed to

debt_market_context_band (proposed) = neutral per overlay.

Expected close by month. expected_close_by_month (proposed):

| Month | Count | Dollars |

|---|---|---|

| May | 1 | $48M |

| June | 2 | $88M |

| July | 1 | $45M |

| Aug | 0 | $0 |

| Sep | 1 | $35M |

| Oct-Mar | 6 | $240M |

IC docket forward 90 days. ic_docket_forward_90d (proposed):

| IC date | Deal | Deal size | Stage | JV partner | Market | Readiness |

|---|---|---|---|---|---|---|

| 2026-05-12 | Highland Mill | $48M | psa_signed | None | Charlotte | ready |

| 2026-05-12 | Glenwood Flats | $52M | loi_signed | Partner_B | Nashville | diligence_gap |

| 2026-06-09 | Ridge Park | $40M | loi_signed | None | Dallas | ready |

| 2026-07-14 | Brookline | $38M | psa_signed | Partner_A | Atlanta | debt_term_sheet_pending |

Capex commitment forward 12 months.

capex_commitment_forward_exposure_dollars (proposed) = $312M across 11 active

construction projects. Inherited from workflows/development_pipeline_tracking

run 2026-04-10 (within freshness window). Two commitments overdrawn on

Riverbend (cite pc_recon_commitment_overdrawn); metric confidence band =

medium until resolved.

Debt market context. debt_market_context_band (proposed) = neutral

per debt_market overlay as-of 2026-03-31 (sample). Overlay staleness within

tolerance; confidence = medium.

Capital deployment pace. Core fund:

capital_deployment_pace_vs_target (proposed) = 0.94 ytd. Within band (0.85

floor). Confidence = high.

Declined deal hit rate. T12m declined_deal_hit_rate (proposed) = 24%.

Attribution cohorts: priced-out 62%, diligence-findings 14%, market-timing

8%, stale-pipeline 16%. Confidence = high. No single-category concentration

50%; investments discipline within overlay band.

Top-of-funnel sourcing health. top_of_funnel_sourcing_health (proposed):

T30 new deals = 9; broker-sourced share 72%; repeat-broker share 48%;

direct-sourced share 28%. Repeat-broker share above overlay target — route

to development_lead for broker-coverage review. Confidence = medium.

JV partner concentration. jv_partner_concentration (proposed):

Partner_A combined pipeline + owned 14.2%; Partner_B 9.6%; Partner_C 7.1%;

others <5% each. All within overlay threshold (15% cap). Partner_A approaching

cap — watch-item. Confidence = high.

Geographic concentration. geographic_concentration_pipeline (proposed):

Southeast 58% of pipeline dollars; pipeline + owned aggregate 56% (above

55% overlay target but within tolerance band). Confidence = high.

Segment concentration. segment_concentration_pipeline (proposed):

middle_market 92%; luxury 8%. Within overlay mandate. Confidence = high.

Confidence bands summary. Per-metric confidence ranges from medium

(pipeline stage dollars at sourced / loi_signed, debt market context,

commitment exposure due to Riverbend recon blocker) to high (closed /

funded dollars, declined hit rate, concentration rollups). No low

confidence metric surfaced without explicit narrative treatment.

Reconciliation posture. Two Procore commitments overdrawn on Riverbend

(pc_recon_commitment_overdrawn blocker) — runbook pointer surfaced;

capex commitment exposure confidence = medium until resolved. One Dealpath

DQ warning (dp_handoff_lag) on a Q1 closed deal — development_lead

notified. No Intacct posting-lag blockers.

Top-3 pipeline watch items.

  1. Riverbend commitment overdrawn — construction + asset_mgmt priority;

capex commitment exposure confidence = medium until resolved.

  1. Repeat-broker share above overlay — route to development_lead for

broker-coverage review; no sourcing blocker yet but trending.

  1. Partner_A JV concentration at 14.2% vs 15% cap — watch-item; next

month's board update if Partner_A's May deal closes.

Draft board packet section. Composed per overlay template; cited

metrics; confidence bands per metric surfaced prominently; reconciliation

memo included as appendix.

Approval request. approval_request row 16 opened; pending board final

submission. Transmission pathway through

workflows/executive_operating_summary_generation.

Confidence banner.

References: source_of_truth_matrix@wave_4_authoritative,
dealpath_deal_pipeline/normalized_contract@2026-04-08 (starter),
dealpath_deal_pipeline/dq_rules@2026-04-08 (starter),
procore_construction/reconciliation_checks@2026-04-08 (starter),
sage_intacct_gl/reconciliation_rules@2026-04-08 (starter),
asset_crosswalk@2026-04-08 (starter),
market_crosswalk@2026-04-08 (starter),
dev_project_crosswalk@2026-04-08 (starter),
capex_project_crosswalk@2026-04-08 (starter),
reconciliation_tolerance_band@2026-03-31 (sample),
approval_threshold_defaults@2026-03-31 (starter),
portfolio_concentration_targets@2026-03-31 (starter),
role_kpi_targets@2026-03-31 (starter).
Proposed metrics (flagged): pipeline_stage_committed_dollars,
expected_close_by_month, ic_docket_forward_90d,
capex_commitment_forward_exposure_dollars (inherited),
debt_market_context_band, capital_deployment_pace_vs_target,
declined_deal_hit_rate, top_of_funnel_sourcing_health,
jv_partner_concentration, geographic_concentration_pipeline,
segment_concentration_pipeline, confidence_band_per_metric.
Canonical extensions required: deal, deal_milestone, commitment
(tracked separately under canonical change-control).
Cross-system posture: Dealpath primary for deal pipeline;
Procore primary for active development + commitments; Intacct
primary for posted capex spend.