Capital Project Intake and Prioritization
Workflow purpose
Convert raw capex ideas and deferred-maintenance flags into a ranked, costed, approvable backlog. Ensures life-safety items never lose priority; routes scope deferrals for approval.
Trigger conditions
- Explicit: "capex intake", "prioritize capex", "capex backlog", "year-end capex plan".
- Implicit:
workflows/monthly_property_operating_reviewsurfaces deferred maintenance;workflows/work_order_triagefinds a repeat pattern; insurance claim or inspection produces a scope. - Recurring: quarterly intake; annual plan build pre-budget.
Inputs (required / optional)
| Input | Type | Required | Notes |
|---|---|---|---|
| Intake items | list | required | description, source, unit, scope |
| Capex line-item library | csv | required | cost ranges |
| Labor and material references | csv | required | market-specific |
| Priority rubric overlay | yaml | required | life safety weight etc. |
| Existing capex plan | record | required | conflict detection |
| Renovation program tracker | record | optional | for yield context |
Outputs
| Output | Type | Shape |
|---|---|---|
| Prioritized backlog | kpi_review | per-item score, cost, priority, life-safety flag |
| Estimate per item | estimate | line items from library |
| Backlog memo | memo | narrative + recommended sequence |
| Approval request list | list | for items that require approval |
Required context
Asset_class, segment, form_factor, lifecycle_stage, management_mode, market.
Process
- Intake normalization. Each item normalized to (description, unit, scope tier, driver, source).
- Life-safety flag. Any item tagged life-safety cannot be deprioritized without
approval_requestrow 4. - Estimate. Apply library; adjust for market via labor/material references.
- Score. Per overlay rubric: life safety, deferred maintenance, renovation yield, risk mitigation, regulatory compliance, residual value.
- Sequence. Produce prioritized backlog with scheduling constraints (seasonality, tenant impact).
- Gated items. Any life-safety deferral, any program change above threshold: open approval rows 4 / 8-11.
- Feed budget / reforecast. Output feeds
workflows/budget_buildandworkflows/reforecast. - Confidence banner. References cited.
Metrics used
capex_spend_vs_plan, renovation_yield_on_cost, repeat_work_order_rate, controllable_opex_per_unit.
Reference files used
reference/normalized/capex_line_items__{scope}.csvreference/normalized/labor_rates__{market}.csvreference/normalized/material_costs__{region}_residential.csvreference/normalized/capex_priority_rubric__{org}.yamlreference/normalized/approval_threshold_defaults.csv
Escalation points
- Life-safety deferral: row 4.
- Program change above threshold: rows 8-11.
- Bid award associated with a project: row 9.
Required approvals
- Life-safety scope deferral (row 4).
- Capex program change above threshold.
Failure modes
- Silent life-safety deprioritization. Fix: row 4 gate automatic.
- Library not market-adjusted. Fix: labor/material references required.
- Estimate without scope tier. Fix: tier required.
- Prioritization without rubric. Fix: overlay rubric governs.
Edge cases
- Insurance claim scope: treat as capex intake if above reserve; flag insurance coordination.
- Regulatory deadline (e.g., code compliance): auto-priority boost.
- Tenant-impact scope: scheduling constraint; include tenant communication via
workflows/move_in_administrationor notice. - Renovation in progress with change order backlog: coordinate via
workflows/change_order_review.
Example invocations
- "Quarterly capex intake for Ashford Park; prioritize backlog."
- "What's the life-safety queue across the portfolio?"
- "Build the 2027 capex plan input for Willow Creek."
Example outputs
Output — Prioritized capex backlog (abridged, Ashford Park)
Backlog. Per-item score, cost range, priority, life-safety flag. Top items: roof repairs (life safety), parking lot resurfacing (deferred maintenance), unit renovation cohort (yield).
Sequence. Proposed order with seasonal constraints.
Approvals. Two items above overlay threshold: rows 8-11 opened for program decisions.
Confidence banner. capex_line_items__value_add@2026-03-31, status=starter. labor_rates__charlotte@2026-03-31, status=sample. capex_priority_rubric@2026-03-31, status=starter.