Capex estimate generation

From mariourquia/cre-skills-plugin · View interactive version

Capex estimate generation is an AI agent skill from the GitHub repository mariourquia/cre-skills-plugin. Produces line-item capex estimates for a defined scope using the capex library, labor rates, material costs, and overlay contingency and escalation. Output is a structured estimate suitable for bid leveling, prioritization, or budget inclusion.

How to use this skill

Skill file

Capex Estimate Generation

Workflow purpose

Turn a scope statement into a structured, line-item estimate tied to the capex library. Output feeds workflows/capital_project_intake_and_prioritization, workflows/bid_leveling_procurement_review, and workflows/budget_build.

Trigger conditions

Inputs (required / optional)

| Input | Type | Required | Notes |

|---|---|---|---|

| Scope statement | memo | required | assembly / line-item references |

| Capex library | csv | required | |

| Labor rates | csv | required | market-specific |

| Material costs | csv | required | region-specific |

| Duration assumptions | csv | required | for phasing |

| Contingency assumptions | csv | required | overlay |

Outputs

| Output | Type | Shape |

|---|---|---|

| Line-item estimate | estimate | qty, unit_cost, extended, source |

| Summary roll-up | table | by assembly and project |

| Escalation view | table | at estimated execution date |

| Estimate memo | memo | assumptions, confidence, risk |

Required context

Asset_class, segment, form_factor, lifecycle_stage, market.

Process

  1. Scope decomposition. Break scope into assemblies and line items; map to library.
  2. Quantity take-off. Compute quantities per scope; include allowances per overlay.
  3. Unit cost application. Apply library unit costs; adjust for labor and material references.
  4. Escalation. Apply overlay escalator to target execution date.
  5. Contingency. Apply overlay contingency by scope tier.
  6. Assembly roll-up. Aggregate to assembly, project, and per-unit / per-sf.
  7. Risk memo. Note assumption confidence, market sensitivities, schedule risks.
  8. Confidence banner. References surfaced with as_of_date and status.

Metrics used

dev_cost_per_unit, dev_cost_per_gsf, dev_cost_per_nrsf, renovation_yield_on_cost (if yield is asked), capex_spend_vs_plan (feeder).

Reference files used

Escalation points

Required approvals

None for the estimate itself (recommendation severity). Downstream approvals live in workflows/bid_leveling_procurement_review, workflows/change_order_review, etc.

Failure modes

  1. Library without market adjustment. Fix: labor/material references mandatory.
  2. No contingency. Fix: overlay contingency mandatory.
  3. No escalation. Fix: escalator applied to target execution date.
  4. Estimate without risk memo. Fix: risk memo mandatory.

Edge cases

Example invocations

  1. "Estimate the roof replacement scope for Ashford Park."
  2. "Build the estimate for the Willow Creek unit renovation tier 2."
  3. "Amenity refresh estimate for the South End portfolio common areas."

Example outputs

Output — Capex estimate (abridged, roof replacement Ashford Park)

Scope. Roof replacement per scope statement; decomposed to tear-off, underlayment, shingles, flashing, cleanup.

Line items. Quantities and unit costs from library; adjusted for labor market.

Roll-up. Per-assembly and per-unit totals.

Escalation. Applied to target execution date.

Contingency. Applied per overlay tier.

Risk memo. Material-cost volatility noted; labor availability confidence medium.

Confidence banner. capex_line_items__roofing@2026-03-31, status=starter. labor_rates__charlotte@2026-03-31, status=sample. contingency_assumptions@2026-03-31, status=starter.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.