Budget build

From mariourquia/cre-skills-plugin · View interactive version

Budget build is an AI agent skill from the GitHub repository mariourquia/cre-skills-plugin. Builds the annual operating budget from property-level bottoms-up plus portfolio-level assumptions. Revenue build from rent roll + market reference + renewal policy; expense build from assumption libraries + staffing ratios + benchmarks. Produces variance narrative against prior year and T12, stress

How to use this skill

Skill file

Annual Budget Build

Workflow purpose

Produce a defensible annual operating budget for a property, with every dollar traced to a reference. Revenue derives from rent roll roll-forward + overlay market assumptions + renewal policy. Expense derives from assumption libraries and staffing ratios. The output is a budget package plus a narrative that can withstand asset-management and lender review.

Trigger conditions

Inputs (required / optional)

| Input | Type | Required | Notes |

|---|---|---|---|

| Rent roll snapshot | table | required | for revenue roll-forward |

| T12 operating statement | table | required | base for expense build |

| Budget history (prior 2 years) | table | required | for trend analysis |

| Market rent reference | csv | required | |

| Concession benchmark | csv | required | |

| Collections benchmark | csv | required | |

| Payroll assumptions | csv | required | |

| Insurance/tax assumptions | csv | required | |

| Utility benchmarks | csv | required | |

| Turn cost library | csv | required | |

| Staffing ratios | csv | required | |

| Budget escalator assumptions | csv | required | per market |

| Renewal uplift bands | csv | required | |

| Debt schedule | record | required | for DSCR/DY view |

Outputs

| Output | Type | Shape |

|---|---|---|

| Revenue build | table | by line item, monthly |

| Expense build | table | by line item, monthly |

| Capex plan stub | list | referenced, produced by capital_project_intake_and_prioritization |

| NOI + NOI margin summary | kpi_review | prior, T12, budget; variance |

| Covenant view | kpi_review | dscr, debt_yield on budgeted NOI |

| Budget narrative | memo | drivers and assumptions, sensitivities |

| Owner package draft | operating_review | assembled budget package |

Required context

Asset_class, segment, form_factor, lifecycle_stage, management_mode, market, jurisdiction.

Process

  1. Revenue build.
  1. Expense build.
  1. Capex plan stub. Pull from workflows/capital_project_intake_and_prioritization; budget reflects cash flow timing, not P&L.
  2. NOI, NOI margin, DSCR, DY. Compute on budget numbers; compare prior and T12.
  3. Variance narrative. For each material line, explain driver (volume, price, mix, assumption change).
  4. Sensitivity cases. Run overlay stress cases: occupancy down X, trade-out down Y, insurance up Z; show NOI impact.
  5. Calibration check. Forecast accuracy on prior budget: where was the operator off; adjust current assumptions where pattern is explained.
  6. Owner package. Assemble per template; draft narrative; prepare sensitivity appendix.
  7. Approval. Final owner/lender submission opens approval_request row 14 (lender) or row 15 / 16 (investor).
  8. Confidence banner. Reference as_of_date and status tags for every assumption.

Metrics used

noi, noi_margin, economic_occupancy, physical_occupancy, leased_occupancy, collections_rate, bad_debt_rate, concession_rate, rent_growth_renewal, rent_growth_new_lease, blended_lease_trade_out, payroll_per_unit, rm_per_unit, utilities_per_unit, controllable_opex_per_unit, dscr, debt_yield.

Reference files used

Escalation points

Required approvals

Failure modes

  1. Rent growth without a market reference. Fix: market reference required.
  2. Payroll built from headcount without ratios. Fix: ratios overlay governs.
  3. No sensitivity. Fix: sensitivity pass is mandatory.
  4. Ignoring prior forecast accuracy. Fix: calibration check is a required step.
  5. Final submission without approval. Fix: row 14/15/16 gate.

Edge cases

Example invocations

  1. "Build the 2027 budget for Ashford Park. Use current assumptions and flag any outside band."
  2. "Run sensitivities on the draft 2027 budget for Willow Creek."
  3. "Produce the owner budget package for the South End portfolio."

Example outputs

Output — 2027 budget summary (abridged, Ashford Park)

Revenue. GPR from roll-forward; vacancy loss to target; concessions per overlay; other income per T12 + overlay; economic_occupancy within band.

Expense. Payroll from ratios; R&M per overlay escalator; utilities per benchmark with RUBS; insurance/tax per overlay.

NOI. Computed; noi_margin within overlay band.

Covenant view. dscr on budget NOI against loan requirement; debt_yield above floor.

Sensitivities. Overlay stress cases produce NOI impact table.

Calibration. Prior budget forecast accuracy noted; adjustments made to utilities assumption per pattern.

Submission. Owner package drafted; approval_request row 15 opened for owner final submission.

Confidence banner. All assumption references carry as_of_date and status. Sample / starter references surfaced with tag.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.