perf-feedback-craft
When to use
- A specific feedback conversation is upcoming (1:1, 30 / 60 / 90 check, mid-cycle review, end-of-cycle review, corrective conversation) and the question is what shape this conversation should take.
- A team-wide feedback cadence is being designed or audited and the question is which signals get surfaced, when, and through what channel.
- A growth conversation is being confused with a corrective conversation (or vice versa) and someone needs to separate them before the next exchange.
Do NOT use as a comp-decision surface (route to Q2 comp-banding; feedback informs comp, doesn't substitute for it), as a hiring-loop / calibration-design skill (route to S2 hiring-loop-design), or for performance-review-software configuration.