Onboarding program

From event4u-app/agent-config · View interactive version

Onboarding program is an AI agent skill from the GitHub repository event4u-app/agent-config. When shaping employee onboarding — time-to-productivity, role-by-role program, mentor pairing, 30/60/90 milestones. Triggers on 'design our onboarding', 'why are new hires ramping slow'.

How to use this skill

Skill file

onboarding-program

When to use

Do NOT use as a customer-onboarding surface (route to Wing-3 CODE0 (H11); this skill is internal-employee, that one is external-customer), as a performance-feedback skill (route to Q4 perf-feedback-craft), or for HRIS-onboarding-module configuration.

Cognition cluster

Cross-wing handoff

Procedure

Step 0: Identify role-family and ramp definition

Before designing the program, name:

  1. What role family is in scope? (eng IC, eng manager, PM, design, sales AE, sales SDR, CS, ops, finance). Onboarding shape varies sharply by family.
  2. What does "ramped" mean for this family? — define net-positive in concrete behavior: an eng IC ships a PR alone by week 4 and owns a workstream by week 12; an AE books N qualified meetings by week 4 and closes a deal by quarter end. Adjective-only definitions ("getting up to speed") fail the bar.
  3. What's the realistic time-to-ramp benchmark? — typically 30 / 60 / 90 days for individual contributors; 6 months for managers; 6–12 months for senior leaders. Compare proposed program length to benchmark.

A program with no concrete ramped-definition is unfalsifiable.

Step 1: Map what the role needs to know, do, decide alone

For the role family, enumerate three buckets:

  1. Know — domain context (industry, regulation, product), system context (codebase tour, dataflow, ops), people context (who owns what, who decides what). Force concrete artifacts (which doc, which repo, which dashboard) — not abstract topics.
  2. Do — first owned task, first reviewed task, first solo task, first shipped task. Sequence from low-risk to medium-risk; arrange to produce one demonstrable early win in week 1–2.
  3. Decide alone — what kind of decision can this person make without consulting? Spell out the boundary; the absence of this is the #1 cause of slow ramp.

Most onboarding programs cover Know well, Do partially, Decide-alone almost never. The last bucket is the leverage point.

Step 2: Design 30 / 60 / 90 milestones

For each milestone, name:

  1. 30-day — Know complete; first owned task shipped; named buddy and named manager 1:1 cadence locked.
  2. 60-day — Owns a workstream segment; has produced one visible artifact for the team; has had at least one feedback checkpoint (composes Q4).
  3. 90-day — Net-positive on standalone contribution; named scope for next quarter; has built one cross-team relationship.

Each milestone needs an objective check (shipped artifact, behavior observed) — not "feels good" attestation.

Step 3: Pair the mentor / buddy / manager triad

Three roles, distinct purposes:

  1. Manager — sets scope, removes blockers, runs 1:1 cadence (weekly first 90 days, biweekly after).
  2. Buddy — peer-level, week-1 to week-12, low-friction questions, social onboarding. Buddy is not a mentor; mixing the role overloads the buddy.
  3. Mentor (optional, role-dependent) — senior in the craft, monthly cadence, growth-focused. Reserved for higher-stakes hires (senior eng, manager, first-in-role).

Mentor / buddy capacity is the binding constraint; if there are no available buddies, hiring should pause, not push through.

Step 4: Build the early-win path

Inversion: "what makes this hire feel they made the wrong choice in week 2?" — usually: no tools, no clarity, no peer, no early demonstrable win.

  1. Pre-day-1: laptop / accounts / access provisioned. Verified by the manager before day 1, not assumed.
  2. Day 1–5: orientation, codebase / domain tour, 1:1s with named peers, manager 1:1 scheduled out for 90 days.
  3. Week 2–4: first owned task — selected to be shippable, visible, low-risk, but real. Not a synthetic onboarding-only task; a real one.
  4. Week 4–6: first feedback checkpoint; explicit acknowledgement of one thing going well + one thing to adjust.

The early-win path is the #1 driver of 12-month retention for new hires.

Step 5: Validate the program before emitting

Before producing the artifact, verify three things:

  1. Ramp-definition concreteness — confirm Step 0 named net-positive in concrete behavior; adjective-only definitions fail and must be re-run.
  2. Decide-alone coverage — assert Step 1's third bucket is non-empty; decide-alone gaps are the canonical ramp-slowing failure mode.
  3. Mentor capacity check — verify the buddy / mentor commitments fit within available mentor capacity for the cohort size; overbooked mentors collapse onboarding silently.

All three must pass. If any fails, return to the failing step.

Step 6: Emit the onboarding program

Produce the onboarding-program artifact for the role-family owner (engineering lead, sales lead, design lead) and people partner. The artifact frames the ramped definition, the Know/Do/Decide map, the 30/60/90 milestones, the triad assignments, and the early-win path.

Related Skills

WHEN to use this

WHEN NOT to use this

When the agent should load this

Output

  1. ramp-definition.md — role-family × concrete ramped-definition × benchmark time-to-ramp.
  2. know-do-decide-map.md — three buckets with concrete artifacts and decide-alone boundary.
  3. milestones-30-60-90.md — milestone × objective check × feedback checkpoint.
  4. triad-assignment.md — manager / buddy / mentor mapping with capacity check.
  5. early-win-path.md — pre-day-1 through week-6 sequence with named first owned task pattern.

Gotcha

Do NOT

Runnable example

Series-A SaaS hires its first dedicated SRE, no prior SRE onboarding shape.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.