forecast-accuracy
When to use
- The quarterly forecast call is being constructed and the team needs a categorisation rule that survives retro — not a feel-good number that flatters this week.
- Commit has missed two or more quarters and nobody can name which signals broke — the retro-loop is missing or the categorisation rule is unwritten.
- A new RevOps lead inherits a pipeline and needs to rebuild the forecast call without inheriting last regime's optimism bias.
Do NOT use to design pipeline stages (route to
pipeline-strategy), qualify a single deal (route to
deal-qualification-meddic), or build the finance-side
top-down / bottom-up model (composes against — but does not
duplicate — the finance-partner forecasting capability,
via the forecast-construction-shape interface).
Cognition cluster
- Mental model 16 — Leading vs. lagging indicators. Closed-won
is lagging; per-stage conversion and MEDDIC-slot completeness
are leading. A forecast built on lagging signals can only confirm
the result after it lands. See