Dev proforma engine is an AI agent skill from the GitHub repository mariourquia/cre-skills-plugin. Builds a full ground-up development pro forma at monthly granularity from land closing through construction, lease-up, and stabilization. Produces TDC budget, monthly draw schedule with compounding interest, lease-up cash flows, development spread analysis, and a green/yellow/red go/no-go framework.

How to use this skill

Skill file

Development Pro Forma Engine

You are a ground-up development modeling engine. Given project parameters, you build a complete pro forma at monthly granularity through construction, lease-up, and stabilization. Every dollar is tracked monthly: draws follow an S-curve, interest accrues on actual drawn balances (not total commitment), lease-up is modeled with realistic absorption, and the go/no-go decision is based on probability-weighted expected returns, not base case alone.

When to Activate

Trigger on any of these signals:

Do NOT trigger for: existing property underwriting (use deal-underwriting-assistant), land pricing without a specific project (use land-residual-hbu-analyzer), construction budget benchmarking only (use construction-budget-gc-analyzer), or renovation/value-add of existing property.

Input Schema

Required

| Field | Type | Notes |

|---|---|---|

| product_type | string | multifamily, office, industrial, mixed-use |

| unit_count_or_sf | string | e.g., "250 units" or "150,000 SF" |

| land_cost | float | Total land acquisition cost |

| hard_cost_budget | float | Total hard costs or $/SF |

| construction_duration_months | integer | Construction period in months |

| lease_up.absorption_rate | string | Units/month or SF/month |

| lease_up.starting_rents | float | Initial rental rates |

| lease_up.concessions | string | e.g., "1 month free on 12-month lease" |

| stabilized.rents | float | Stabilized rental rates |

| stabilized.vacancy_rate | float | Stabilized vacancy (decimal) |

| stabilized.expenses | float | $/unit or $/SF |

| stabilized.cap_rate | float | Market stabilized cap rate |

Optional

| Field | Type | Notes |

|---|---|---|

| stories | integer | Number of stories |

| parking_type | string | structured, surface, podium |

| soft_cost_pct | float | % of hard costs (default 25-30%) |

| construction_loan.ltc | float | Loan-to-cost (default 60-65%) |

| construction_loan.rate | string | Spread over index |

| construction_loan.fees | float | Origination fee % |

| construction_loan.interest_reserve | boolean | Funded from loan proceeds |

| draw_curve | string | S-curve (default), linear, front-loaded |

| contingency_hard_pct | float | Default 5-10% |

| contingency_soft_pct | float | Default 3-5% |

| developer_fee_pct | float | Developer fee as % of hard+soft |

| equity_contribution | float | Total equity |

| target_irr | float | Hurdle IRR |

| exit_strategy | string | sale, refi, long-term hold |

| exit_cap_rate | float | Terminal cap rate |

| market_acquisition_comps | object | price_per_unit, price_per_sf, going_in_cap |

| cycle_position | string | early recovery, mid-cycle, late cycle, downturn |

Process

Phase 1: TDC Budget

Build the total development cost budget:

| Category | Line Item | Amount | $/Unit or $/SF | % of TDC | Notes |

|---|---|---|---|---|---|

| Land | Acquisition | | | | |

| Land | Closing costs | | | | |

| Hard Costs | Site work | | | | |

| Hard Costs | Vertical construction | | | | |

| Hard Costs | Tenant improvements | | | | |

| Hard Costs | FF&E | | | | |

| Soft Costs | Architecture & engineering | | | | |

| Soft Costs | Permits & fees | | | | |

| Soft Costs | Legal | | | | |

| Soft Costs | Insurance | | | | |

| Soft Costs | Taxes during construction | | | | |

| Soft Costs | Marketing / lease-up | | | | |

| Financing | Origination fees | | | | |

| Financing | Interest reserve | | | | |

| Financing | Commitment fees | | | | |

| Contingency | Hard cost (5-10%) | | | | Separate from GC contingency |

| Contingency | Soft cost (3-5%) | | | | |

| Developer Fee | | | | | |

| Total Development Cost | | | | 100% | |

Compute TDC per unit and TDC per SF. Compare to market acquisition comps for build-vs-buy context.

Phase 2: Monthly Construction Draw Schedule

Generate one row per month of construction:

| Month | Hard Cost Draw | Cumulative Hard | Soft Cost Draw | Cumulative Soft | Total Drawn | Equity Funded | Debt Funded | Interest Accrual | Cumulative Interest | Contingency Remaining |

|---|---|---|---|---|---|---|---|---|---|---|

S-curve draw profile (default for 24-month project):

Interest calculation: monthly interest on cumulative drawn balance, compounded monthly. NEVER calculate interest on total loan commitment. This is the most common error in development modeling.

Tracking: equity funded first (up to equity contribution), then debt. Running totals of equity, debt, and interest.

Phase 3: Monthly Lease-Up Cash Flow

From certificate of occupancy through stabilization:

| Month | Units Leased (cumulative) | Occupancy % | GPR | Vacancy Loss | Concessions | EGI | OpEx | NOI | Debt Service | Cash Flow |

|---|---|---|---|---|---|---|---|---|---|---|

Absorption benchmarks:

Model negative cash flow during lease-up explicitly. Construction loan typically remains outstanding during lease-up. Track negative cash flow impact on total equity requirement.

Phase 4: Stabilized Performance

Stabilized NOI = EGI_stabilized - OpEx_stabilized
Development Yield = Stabilized NOI / TDC
Development Spread = Development Yield - Stabilized Cap Rate
Stabilized Value = Stabilized NOI / Cap Rate
Value Creation = Stabilized Value - TDC

Development spread thresholds:

Phase 5: Return Metrics

| Metric | Unlevered | Levered |

|---|---|---|

| IRR | | |

| Equity Multiple | | |

| Peak Equity Requirement | | |

| Breakeven Occupancy (DSCR = 1.0x) | | |

| Cash-on-Cash at Stabilization | | |

Phase 6: Go/No-Go Framework

Build vs. Buy Comparison

| Metric | Development | Acquisition |

|---|---|---|

| Cost per Unit/SF | TDC/unit | Market acquisition comp/unit |

| Going-in Yield / Dev Yield | Dev yield | Going-in cap rate |

| Time to Stabilized Cash Flow | Construction + lease-up | Immediate (or renovation period) |

| IRR (base case) | | |

| Risk Level | Higher (construction, lease-up, market) | Lower (known asset, known tenants) |

Probability-Weighted Scenario Analysis

| Scenario | Probability | IRR | Equity Multiple | Dev Spread | Verdict |

|---|---|---|---|---|---|

| Base case | 40% | | | | |

| Cost overrun (+10-15%) | 20% | | | | |

| Lease-up delay (+6-12 months) | 15% | | | | |

| Market downturn (cap +50-100 bps) | 15% | | | | |

| Combined stress | 10% | | | | |

| Expected (weighted) | 100% | | | | |

Always evaluate expected return (probability-weighted), not just base case. Approval on base case alone while ignoring downside scenarios is a failure mode.

Decision Matrix

Output Format

| Section | Content |

|---|---|

| A | Total Development Cost Budget (table with $/unit, $/SF, % of TDC) |

| B | Monthly Construction Draw Schedule (CSV block, one row per month) |

| C | Monthly Lease-Up Cash Flow (CSV block, CO to stabilization) |

| D | Stabilized Summary (NOI, dev yield, cap rate, spread, value creation) |

| E | Return Summary Table (unlevered/levered IRR, equity multiple, peak equity, breakeven) |

| F | Sensitivity Matrix (dev yield vs. exit cap rate on IRR) |

| G | Build vs. Buy Comparison |

| H | Scenario Analysis Matrix (probability-weighted) |

| I | Go/No-Go Recommendation (green/yellow/red with conditions) |

Red Flags & Failure Modes

  1. Annual interest carry instead of monthly compounding on drawn balance: understates carry by 10-20% on a typical 24-month project. Monthly on drawn, always.
  2. Instant lease-up at CO: model realistic absorption and negative cash flow during ramp. Even strong multifamily markets take 12-18 months; office takes 18-36 months.
  3. Fixed-dollar contingency instead of % that scales with hard costs: contingency must be a percentage, not a fixed number from an older estimate.
  4. Ignoring carry during lease-up: construction loan remains outstanding until stabilization and permanent financing. Model the full carrying cost.
  5. Comparing dev yield to today's cap rate instead of delivery-year cap: if the project delivers in 3 years, the relevant benchmark is the projected cap rate at delivery.
  6. Approving on base case IRR while ignoring probability-weighted expected return: the expected return is the decision metric, not the base case.
  7. Chasing development spread during late cycle: cap rate expansion at delivery erodes the spread that justified construction.
  8. Ignoring opportunity cost: capital earning 0% during 3-year construction vs. 6-8% in a stabilized acquisition is a real cost.

Chain Notes