Scaling checklist

From FerroxLabs/wayland · View interactive version

Scaling checklist is an AI agent skill from the GitHub repository FerroxLabs/wayland. Produces an operations scaling checklist covering team, systems, processes, finance, and legal readiness for a business transitioning from startup to growth stage. Use when the user asks about scaling operations, growth readiness, scaling a startup, operations checklist, or preparing to scale. Do NO

How to use this skill

Skill file

Scaling Checklist

When to Use

Use this skill when:

Do NOT use this skill when:


Process

Step 1: Establish Current State Baselines with Precision

Before building any checklist, gather specific data across five baseline dimensions. Generic answers produce generic checklists. Specificity determines which items are "must have now" versus "build later."

Step 2: Define the Target Scale and What It Actually Requires

Scaling "from 50 to 200 customers" sounds simple but implies a specific set of structural requirements. Map the target state rigorously.

Step 3: Audit Dimension 1 -- Team, Hiring, and Organization

Team scaling is almost always the rate-limiting constraint. Most operational failures during scaling are people failures, not technology failures.

Step 4: Audit Dimension 2 -- Systems and Technical Infrastructure

Infrastructure failures during scaling are catastrophic because they damage trust with customers at exactly the moment when reputation is being built. Audit each layer specifically.

Step 5: Audit Dimension 3 -- Processes and Documentation

Process documentation is the mechanism by which the founder's knowledge becomes company knowledge. Without it, the company cannot grow beyond the founder's personal bandwidth.

Step 6: Audit Dimension 4 -- Finance, Unit Economics, and Cash Management

Scaling with poor unit economics is the most common cause of startup death at the growth stage. Capital amplifies both profitable and unprofitable growth with equal indifference.

Step 7: Audit Dimension 5 -- Legal, Compliance, and Risk

Legal infrastructure is not bureaucracy at the scaling stage -- it is the foundation that prevents catastrophic, company-ending events that become much more likely as the company grows.

Step 8: Audit Dimension 6 -- Customer Success, Retention, and Expansion

Retention is the foundation of the scaling math. A SaaS business with 5% monthly logo churn has a half-life of 14 months for its customer base -- meaning every cohort loses half its customers within 14 months. That is not a business that can scale; it is a bucket that must be filled faster than it drains.


Output Format

## Scaling Readiness Checklist: [Business Name / Description]

---

### Current State Snapshot

| Metric | Value | Notes |
|--------|-------|-------|
| Monthly Recurring Revenue | $[X]K MRR | $[Y]K ARR |
| MoM Revenue Growth Rate | [X]% (avg, last 6 mo) | Trend: [accelerating / stable / decelerating] |
| Active Customers | [X] | Logo count |
| Average Contract Value | $[X] | ACV |
| Net Revenue Retention | [X]% | [Above / Below 100%] |
| Monthly Logo Churn | [X]% | [Acceptable / Needs intervention] |
| Team Size | [X] people | [List functional areas] |
| Current Runway | [X] months | Based on current burn |
| Infrastructure Cost per Customer | $[X]/mo | [Gross margin implication] |

### Target State (12-18 Month Horizon)

| Metric | Target | Implied Change |
|--------|--------|----------------|
| Monthly Recurring Revenue | $[X]K MRR | [X]x current |
| Active Customers | [X] | [X]x current |
| Team Size | [X] people | [X] net new hires |
| Key Milestone | [e.g., Series A / Profitability / Enterprise motion launched] | |
| Infrastructure Load | [X] concurrent users | Load test target: [2x this number] |

---

### DIMENSION 1: Team, Hiring, and Organization

| # | Item | Current Status | Priority | Specific Action Required | Owner | Target Date |
|---|------|---------------|----------|--------------------------|-------|-------------|
| 1.1 | Single points of failure identified and mitigated | [Exists / Partial / Missing] | [Must Have Before / Build During / Build After] | [Action] | [Name] | [Date] |
| 1.2 | Org chart documented for target scale | | | | | |
| 1.3 | Critical hire pipeline active (roles defined) | | | | | |
| 1.4 | Structured interview process per role | | | | | |
| 1.5 | 30-day onboarding checklist for each role | | | | | |
| 1.6 | Management layer in place or planned | | | | | |
| 1.7 | Compensation bands and equity plan documented | | | | | |
| 1.8 | Culture values written and used in hiring | | | | | |
| 1.9 | Founder's time allocation mapped; delegation list created | | | | | |
| 1.10 | Employment agreements for all team members signed | | | | | |

**Dimension 1 Blocking Issues:**
[List any items scored "Must Have Before" that are currently Missing -- these must be resolved before scaling begins]

---

### DIMENSION 2: Systems and Technical Infrastructure

| # | Item | Current Status | Priority | Specific Action Required | Owner | Target Date |
|---|------|---------------|----------|--------------------------|-------|-------------|
| 2.1 | Load test completed at 2x 12-month target user count | | | | | |
| 2.2 | Uptime monitoring and alerting active (target: 99.9%) | | | | | |
| 2.3 | Automated backups with tested restore process | | | | | |
| 2.4 | Disaster recovery runbook documented | | | | | |
| 2.5 | CRM implemented with defined pipeline stages | | | | | |
| 2.6 | Support ticketing system with SLA enforcement | | | | | |
| 2.7 | Metrics dashboard (MRR, churn, CAC, NPS) -- daily update | | | | | |
| 2.8 | Role-based access controls and offboarding process | | | | | |
| 2.9 | External penetration test within last 12 months | | | | | |
| 2.10 | Vendor contracts reviewed for scale (cloud, payments, email) | | | | | |
| 2.11 | Data backup and encryption (in transit and at rest) confirmed | | | | | |
| 2.12 | Infrastructure cost projection at target scale calculated | | | | | |

**Dimension 2 Blocking Issues:**
[List blocking items]

---

### DIMENSION 3: Processes and Documentation

| # | Item | Current Status | Priority | Specific Action Required | Owner | Target Date |
|---|------|---------------|----------|--------------------------|-------|-------------|
| 3.1 | Customer onboarding process documented (target: TTV < 7 days) | | | | | |
| 3.2 | Support tiers and SLAs defined (P1/P2/P3 response times) | | | | | |
| 3.3 | Sales playbook documented (ICP, discovery, objections, demo) | | | | | |
| 3.4 | Product release process with defined quality gates | | | | | |
| 3.5 | Decision rights matrix (who approves what at what threshold) | | | | | |
| 3.6 | Incident response runbook (severity levels, escalation, comms) | | | | | |
| 3.7 | Internal knowledge base or wiki started | | | | | |
| 3.8 | Company-wide communication rhythm defined (standups, all-hands) | | | | | |
| 3.9 | Bus test completed -- all critical processes documented | | | | | |
| 3.10 | Post-mortem process for incidents and sales losses | | | | | |

**Dimension 3 Blocking Issues:**
[List blocking items]

---

### DIMENSION 4: Finance, Unit Economics, and Cash Management

| # | Item | Current Status | Priority | Specific Action Required | Owner | Target Date |
|---|------|---------------|----------|--------------------------|-------|-------------|
| 4.1 | Gross margin calculated and above threshold ([70%+ SaaS]) | | | | | |
| 4.2 | CAC calculated by channel (not blended total) | | | | | |
| 4.3 | LTV:CAC ratio above 3:1 | | | | | |
| 4.4 | CAC payback period under 18 months | | | | | |
| 4.5 | 18-month cash flow forecast (3 scenarios) | | | | | |
| 4.6 | Monthly close process under 5 business days | | | | | |
| 4.7 | Budget by department with budget-vs-actual reporting | | | | | |
| 4.8 | Deferred revenue accounting correct (ASC 606) | | | | | |
| 4.9 | Headcount plan with loaded cost and productivity ramp | | | | | |
| 4.10 | Tax filings current; entity structure reviewed | | | | | |
| 4.11 | Revenue concentration risk assessed (no customer >20% of ARR) | | | | | |

**Dimension 4 Blocking Issues:**
[List blocking items]

---

### DIMENSION 5: Legal and Compliance

| # | Item | Current Status | Priority | Specific Action Required | Owner | Target Date |
|---|------|---------------|----------|--------------------------|-------|-------------|
| 5.1 | Entity structure appropriate for target scale and investors | | | | | |
| 5.2 | IP assignment agreements (PIIA) signed by all founders, employees, contractors | | | | | |
| 5.3 | Trademarks filed for brand and product name | | | | | |
| 5.4 | Customer contracts reviewed -- liability caps, SLAs, MFN clauses | | | | | |
| 5.5 | Data processing agreements (DPA) executed with enterprise customers | | | | | |
| 5.6 | Privacy policy current and compliant (GDPR / CCPA as applicable) | | | | | |
| 5.7 | Employment law compliance plan for next headcount threshold | | | | | |
| 5.8 | Business insurance: GL, E&O, Cyber, D&O in place | | | | | |
| 5.9 | Vendor agreements for critical vendors reviewed by counsel | | | | | |
| 5.10 | Employee handbook updated to current team size and regulations | | | | | |

**Dimension 5 Blocking Issues:**
[List blocking items]

---

### DIMENSION 6: Customer Success, Retention, and Expansion

| # | Item | Current Status | Priority | Specific Action Required | Owner | Target Date |
|---|------|---------------|----------|--------------------------|-------|-------------|
| 6.1 | Monthly logo churn calculated and benchmarked | | | | | |
| 6.2 | Net revenue retention calculated (target: >110% for B2B SaaS) | | | | | |
| 6.3 | Customer health scoring model in place | | | | | |
| 6.4 | At-risk customer list current and assigned | | | | | |
| 6.5 | Customer feedback loop with closed-loop action process | | | | | |
| 6.6 | Expansion revenue motion defined (triggers, process, owner) | | | | | |
| 6.7 | Customer reference program (5+ reference-ready customers) | | | | | |
| 6.8 | Case studies or testimonials published | | | | | |
| 6.9 | QBR (quarterly business review) process for key accounts | | | | | |
| 6.10 | CS team capacity assessed against 12-month customer target | | | | | |

**Dimension 6 Blocking Issues:**
[List blocking items]

---

### Scaling Readiness Score

| Dimension | Must-Have Items | Must-Have Complete | Build-During Items | Build-After Items | Blocking Issues |
|-----------|----------------|-------------------|--------------------|--------------------|-----------------|
| 1. Team and Hiring | [X] | [Y] ([Z]%) | [X] | [X] | [Count] |
| 2. Systems / Infrastructure | [X] | [Y] ([Z]%) | [X] | [X] | [Count] |
| 3. Processes / Docs | [X] | [Y] ([Z]%) | [X] | [X] | [Count] |
| 4. Finance / Unit Economics | [X] | [Y] ([Z]%) | [X] | [X] | [Count] |
| 5. Legal / Compliance | [X] | [Y] ([Z]%) | [X] | [X] | [Count] |
| 6. Customer Success | [X] | [Y] ([Z]%) | [X] | [X] | [Count] |
| **OVERALL** | **[X]** | **[Y] ([Z]%)** | | | **[Total blockers]** |

**Scaling Readiness Verdict:**
- [Green]: 90%+ of Must-Have items complete, 0 blocking issues -- ready to scale
- [Yellow]: 70-89% of Must-Have items complete, or 1-3 blocking issues -- scale with caution, resolve blockers within 30 days
- [Red]: Below 70% of Must-Have items complete, or 4+ blocking issues -- do not accelerate scaling until blockers are resolved

---

### 90-Day Scaling Readiness Roadmap

| Phase | Days | Objective | Top 5 Actions | Success Criteria |
|-------|------|-----------|---------------|-----------------|
| Phase 1: Stabilize and Unblock | 1-30 | Resolve all blocking issues; start critical hires | [Action 1-5] | All blocking issues resolved; offers extended for critical hires |
| Phase 2: Build and Document | 31-60 | Complete process documentation; implement core systems | [Action 1-5] | Sales playbook complete; onboarding documented; CRM live |
| Phase 3: Test and Launch | 61-90 | Validate at target load; train team; launch scaled motion | [Action 1-5] | Infrastructure load tested; new hires onboarded; first scaled sales sprint complete |

**Go/No-Go Checkpoint (Day 90):**
Proceed with full scaled operations when: (1) all Must-Have items are complete, (2) no Blocking Issues remain open, and (3) the team has been trained on the new processes and systems. If any blocker remains open at Day 90, extend the readiness phase by 30 days and reassign ownership with daily tracking.

**Monthly Review:** Revisit this checklist on the first Monday of each month during the scaling phase. New gaps emerge as the business grows. Items that were "Build After" at the start may become "Must Have" as circumstances change.

Rules

  1. Never skip the current state baseline. A scaling checklist built without specific current-state data will misclassify priorities. A business with $5K MRR and 5 customers does not have the same scaling risks as a business with $50K MRR and 80 customers. Collect actual numbers before building the checklist.
  1. Always validate unit economics before any growth investment. Scaling with a LTV:CAC ratio below 3:1 or a CAC payback period above 18 months accelerates cash consumption without building a sustainable business. Flag unit economics problems as Priority 1 blockers, regardless of how eager the founder is to scale.
  1. Always separate "must have before scaling" from "build during scaling." Attempting to complete the entire checklist before beginning to scale causes paralysis and wastes the momentum window that follows fundraising or a PMF signal. The goal is to remove blocking risks, not to achieve operational perfection before the first growth hire is made.
  1. Never ignore retention when the user wants to talk about acquisition. A monthly logo churn rate above 3% (for SMB SaaS) or above 1% (for enterprise SaaS) is a customer success emergency that must be addressed before increasing sales spend. Present the math explicitly: a $50K MRR business with 5% monthly churn loses $2,500 of MRR every month from existing customers -- the sales team must first generate $2,500 just to stay flat.
  1. Always identify the single points of failure in the team before recommending scaling. A founder who personally handles any critical function that cannot be delegated (closing deals, managing a critical customer relationship, approving production deployments) is the bottleneck. Do not recommend scaling headcount on the go-to-market side until the operational single points of failure are addressed.
  1. Always include a headcount plan with loaded costs and productivity ramp assumptions. "We need to hire 5 people" is not a plan. A plan specifies: the role, the base salary, the loaded cost (typically 1.25-1.4x base salary including benefits, equipment, and recruiting cost), the quarter they will be hired, and the number of months before they reach full productivity. Without this model, cash burn projections will be wrong.
  1. Never allow IP assignment to be deferred. If any founder, co-founder, employee, or contractor has created intellectual property for the company without a signed PIIA or IP assignment agreement, this must be corrected immediately. This is the most common and most serious legal defect uncovered in Series A due diligence, and it can delay or kill a financing round.
  1. Always include a load test requirement with a specific target. "Our infrastructure can handle the load" is not acceptable. The load test must specify: the target number of concurrent users, the response time threshold (e.g., 95th percentile response time under 2 seconds at load), and the error rate threshold (e.g., below 0.1% error rate at target load). Untested infrastructure fails under real growth traffic.
  1. Always include the specific employment law headcount thresholds relevant to the user's jurisdiction. In the US, the 15-employee threshold (Title VII, ADA), the 20-employee threshold (ADEA), and the 50-employee threshold (FMLA, ACA) are hard legal deadlines, not suggestions. A company that passes these thresholds without compliant policies is exposed to litigation. Flag whichever threshold the company is approaching next.
  1. The checklist is a living document, not a one-time deliverable. Instruct the user to review and update the checklist monthly during the scaling phase. As the business grows, new gaps emerge, some planned items become irrelevant, and the priority classification of existing items shifts. A checklist built at 50 customers will need significant revision at 150 customers.

Edge Cases

Services or Agency Business Scaling

Services businesses (consulting, agencies, managed services) scale on people, not technology. The primary constraint is delivery capacity, and the primary risk is quality dilution as the team grows beyond the founder's direct supervision.

Marketplace Business Scaling (Two-Sided Network)

Marketplaces have two separate scaling problems -- supply side and demand side -- and scaling them out of balance destroys liquidity and user experience.

Hardware or Physical Product Business Scaling

Physical product businesses face irreversible scaling decisions: manufacturing commitments, inventory purchases, and supply chain investments must be made months before the product reaches customers.

Heavily Regulated Industry (Fintech, Healthtech, Legaltech, Edtech)

In regulated industries, compliance is not a parallel track -- it is the main track. Scaling without regulatory infrastructure creates existential risk that cannot be remediated retroactively.

Solo Founder Scaling Past Personal Bandwidth Limit

Solo founders often reach a moment where they are simultaneously the bottleneck for every function and unable to delegate because nothing is documented. This is a specific scaling failure mode that requires a specific intervention sequence.

Business with Revenue Concentration Risk

A business where one or two customers represent more than 30% of ARR has a structural risk that must be addressed before scaling.


Example

Input: "We're a B2B SaaS startup. We have 65 customers, $42K MRR growing about 12% per month, team of 6 (3 engineers, 1 founder/CEO who also runs sales, 1 customer success manager, 1 part-time marketing contractor). We just closed a $1.5M seed round. We want to get to 250 customers and $180K MRR in the next 14 months. What do we need in place?"


Output:

Scaling Readiness Checklist: B2B SaaS Startup -- Seed Stage to Growth Stage


Current State Snapshot

| Metric | Value | Notes |

|--------|-------|-------|

| Monthly Recurring Revenue | $42K MRR | $504K ARR |

| MoM Revenue Growth Rate | 12% | Strong -- but founder-dependent sales motion is the ceiling |

| Active Customers | 65 | Logo count |

| Average Contract Value | ~$646/customer/mo | Estimated; verify actual ACV distribution |

| Net Revenue Retention | Unknown -- must calculate immediately | This is Priority 1 data |

| Team Size | 6 (3 eng, 1 CEO/sales, 1 CS, 1 PT marketing) | Founder is only salesperson -- single point of failure |

| Runway (post-seed) | ~20 months at current burn | Assumes $75K/mo burn with planned hires |

| Infrastructure Cost per Customer | Unknown -- must calculate | Gross margin implication |

Target State (14-Month Horizon)

| Metric | Target | Implied Change |

|--------|--------|----------------|

| MRR | $180K MRR | 4.3x current |

| ARR | $2.16M ARR | Series A benchmark zone |

| Active Customers | 250 | 3.8x current |

| Team | 14-16 people | 8-10 net new hires |

| Implied Org | CEO, VP Sales, 2-3 AEs, CS Lead + 2 CSMs, 5 Engineers, Head of Ops/Finance | |

| Infrastructure Load | 250 customers at full usage | Load test target: 500 concurrent accounts |

Critical Math Check: Growing from $42K to $180K MRR in 14 months at 12% MoM growth actually gets you to approximately $200K MRR -- the organic growth trajectory is on track, but only if the sales bottleneck (founder as only salesperson) is resolved immediately. If growth decelerates to 8% per month because the founder's sales capacity is exhausted, the business reaches only $120K MRR -- $60K short of target. Hiring a second salesperson is the highest-leverage action in the entire checklist.


TOP PRIORITY ITEMS -- Blocking Issues to Resolve in 30 Days

| # | Dimension | Item | Why It Blocks Scaling | Immediate Action |

|---|-----------|------|----------------------|-----------------|

| B1 | Team | Founder is sole salesperson | Sales capacity is capped at founder's personal bandwidth; already limiting 12% growth rate | Post VP Sales or AE job description this week; target hire in 45 days |

| B2 | Finance | NRR not calculated | Cannot validate scaling economics without knowing if you are retaining and expanding revenue | Pull data from billing system; calculate cohort retention by month; do this before anything else |

| B3 | Process | Sales process not documented | A second salesperson cannot be effective without a written ICP, discovery framework, demo script, and objection handling guide | 2-week project to document the current founder sales motion end to end |

| B4 | Systems | No metrics dashboard | At 4x customers, decisions cannot be made on intuition; MRR, churn, CAC, and NPS must be visible in a dashboard updated daily | Implement Metabase or Looker Studio pulling from billing system within 30 days |

| B5 | Legal | IP assignment status unknown | If any engineer or contractor created product code without a signed PIIA, the company may not own its own IP -- a fatal Series A diligence defect | Audit all employment agreements and contractor agreements this week; have counsel cure any gaps immediately |


DIMENSION 1: Team, Hiring, and Organization

| # | Item | Current Status | Priority | Specific Action Required | Target Date |

|---|------|---------------|----------|--------------------------|-------------|

| 1.1 | Founder's sales role delegated to a dedicated salesperson | Missing -- BLOCKING | Must Have Before | Hire AE or VP Sales within 45 days; document current sales process first | Day 45 |

| 1.2 | Customer Success capacity assessed for 250-customer load | Partial -- 1 CSM for 65 customers; ratio will break at 150+ | Must Have Before | Plan CS hire #2 by Month 3; current CSM can support up to ~120 customers | Month 3 |

| 1.3 | Engineering capacity for product and infrastructure at 4x load | Partial -- 3 engineers; no dedicated infrastructure owner | Build During | Hire senior engineer or DevOps engineer by Month 2 to own infrastructure | Month 2 |

| 1.4 | Org chart documented for 12-month target state | Missing | Must Have Before | Draw the 14-month org chart this week; use it to sequence hires | Day 14 |

| 1.5 | Structured interview process per role | Missing | Must Have Before | Build interview scorecard for first 3 hires before sourcing begins | Day 7 |

| 1.6 | Onboarding checklist for each new hire role | Missing | Must Have Before | Build 30-60-90 day plan template; customize for first hire before they start | Day 30 |

| 1.7 | Compensation bands defined for all planned roles | Missing | Must Have Before | Benchmark market salaries using public SaaS comp data; define ranges for each role | Day 14 |

| 1.8 | Equity plan and remaining option pool documented | Unknown | Must Have Before | Confirm option pool size from cap table; document vesting schedule; have