Raci chart

From FerroxLabs/wayland · View interactive version

Raci chart is an AI agent skill from the GitHub repository FerroxLabs/wayland. Creates a RACI responsibility assignment matrix for defined processes with roles, decision rights, and escalation paths using RACI methodology. Use when the user asks about RACI charts, RACI matrices, responsibility assignment, role clarity, decision rights, or process ownership. Do NOT use for orga

How to use this skill

Skill file

RACI Chart

When to Use

Use this skill when:

Do NOT use this skill when:


Process

Step 1: Scope the Process and Gather Information

Before drawing a single cell, define the exact scope. A poorly scoped RACI is worse than no RACI -- it creates false clarity.

Step 2: Identify and Normalize the Activities (Rows)

The rows of the RACI are the atomic units of work, decision, or review within the process. Identifying them correctly is the hardest part of building a good RACI.

Step 3: Identify and Limit the Roles (Columns)

The columns of the RACI are organizational roles, not individuals.

Step 4: Assign RACI Designations -- The Core Work

For every intersection of activity (row) and role (column), assign exactly the right designation or leave it blank. This is where deep expertise matters.

R -- Responsible:

A -- Accountable:

C -- Consulted:

I -- Informed:

Blank:

Step 5: Validate the Matrix for Structural Errors

Before presenting the chart, run these validation checks. Every check should pass.

Step 6: Define Decision Rules and Escalation Paths

A RACI without escalation rules is a chart without teeth. Every RACI must include at minimum three types of rules.

Step 7: Document, Review, and Schedule Maintenance

A RACI that is not reviewed becomes a liability rather than an asset.


Output Format

## RACI Chart: [Process Name]

### Overview
- **Process:** [One-sentence description of what this RACI covers, from trigger to outcome]
- **Version:** [1.0, 1.1, 2.0, etc.]
- **Effective date:** [Date]
- **Next review date:** [Date -- 3-6 months for active processes, 6-12 for stable ones]
- **Process owner:** [Role title of the person responsible for maintaining this RACI]
- **Escalation authority:** [Role title who resolves cross-functional disputes]

---

### RACI Matrix

| Activity | [Role 1] | [Role 2] | [Role 3] | [Role 4] | [Role 5] |
|----------|----------|----------|----------|----------|----------|
| [Activity 1 -- verb phrase] | R/A | C | C | I | |
| [Activity 2 -- verb phrase] | C | R/A | I | | |
| [Activity 3 -- verb phrase] | A | R | C | I | |
| [Activity 4 -- verb phrase] | C | C | R/A | | I |
| [Activity 5 -- verb phrase] | | I | R | A | C |
| [Activity 6 -- verb phrase] | A | C | R | | I |
| [Activity 7 -- verb phrase] | I | | C | R | A |
| [Activity 8 -- verb phrase] | R/A | | | C | I |

**Legend:**
| Code | Meaning | Rules |
|------|---------|-------|
| R | Responsible -- performs the work | At least 1 per row; multiple allowed |
| A | Accountable -- owns the outcome, approves | Exactly 1 per row; no more, no less |
| C | Consulted -- provides input before completion | Limit to essential reviewers; two-way |
| I | Informed -- notified of outcome | One-way; use sparingly |
| R/A | Responsible and Accountable -- same person does and owns | Common; acceptable unless high-risk sign-off |
| (blank) | No involvement | Valid assignment; not an oversight |

---

### Role Summary

| Role | Person / Team | R Count | A Count | C Count | I Count | Notes |
|------|--------------|---------|---------|---------|---------|-------|
| [Role 1] | [Name or team] | [n] | [n] | [n] | [n] | [e.g., primary process driver] |
| [Role 2] | [Name or team] | [n] | [n] | [n] | [n] | [e.g., domain expert, QA gatekeeper] |
| [Role 3] | [Name or team] | [n] | [n] | [n] | [n] | [e.g., executive sponsor] |

---

### Decision Rules and Escalation Paths

| Scenario | Rule | Timeframe | Escalation if Unresolved |
|----------|------|-----------|--------------------------|
| R and A disagree on completion | A has final say | Resolve within [X] hours/days | [Escalation role] |
| Consulted input overridden | A documents rationale in [system/document] | At time of decision | [Compliance/audit record] |
| Activity deadline missed | [Defined action: hold, escalate, or skip] | After [X] hours/days past due | [Escalation role] |
| A is unavailable | [Alternate role] assumes A authority | After [X] hours of unavailability | [Backup role] |
| Disagreement between two As | Not applicable -- only one A per row | n/a | n/a |

---

### Exceptions and Threshold-Based Authority

| Condition | Modified Assignment | Notes |
|-----------|-------------------|-------|
| [e.g., Contract value under $25K] | [Modified A assignment] | [Reason] |
| [e.g., Contract value $25K-$100K] | [Modified A assignment] | [Reason] |
| [e.g., Temporary: until [Role] hired] | [Modified R/A assignment] | Expires [date or condition] |
| [e.g., Regulatory/audit-required process] | [Additional C or sign-off requirement] | [Reason and citation if applicable] |

---

### Validation Checklist

- [ ] Every row has exactly 1 A
- [ ] Every row has at least 1 R
- [ ] No single role holds A for more than 50% of rows
- [ ] No role appears only as I (moved to communication plan if so)
- [ ] No row has more than 3 C assignments
- [ ] All R/A combinations reviewed for independence requirements
- [ ] Escalation path defined for top 3 conflict scenarios
- [ ] Process owner assigned and confirmed
- [ ] Review date set
- [ ] All named roles have received a copy and confirmed understanding

Rules

  1. Exactly one A per row -- enforce this as a hard constraint, no exceptions. A row with zero As has no accountability. A row with two As creates the bystander effect -- each A assumes the other is handling it. If the user insists two people share accountability, it means the activity should be split into two separate rows with one A each.
  1. Every row must have at least one R. A row with only A, C, and I assignments means someone is approving, consulting, and notifying about work that no one is actually doing. Flag this immediately -- it indicates either a missing role on the chart or an activity that does not actually exist in the process.
  1. Resist defaulting all As to the most senior person. The most common and most damaging RACI mistake is assigning A for every activity to the VP, Director, or Executive Sponsor because they are "ultimately responsible." This creates an accountability concentration that makes them a bottleneck and strips domain leads of the ownership they need to function. Senior leaders should be A only for final approvals, strategic gates, and activities where their organizational authority is genuinely required.
  1. C is a commitment, not a courtesy. Marking a role as C means the process owner commits to actively soliciting that role's input before the activity is complete. If there is no mechanism to do so -- no meeting, no review stage, no feedback window -- change the C to an I. A C that is never actually consulted breeds resentment and false assurance.
  1. Never use personal names as column headers in the primary matrix. Names create a RACI that expires when people leave or change roles. Use role titles. If the user's organization is small enough that one person holds multiple roles, create a role-to-person mapping table separately (the Role Summary section), but keep the matrix itself role-based.
  1. Keep the chart to 4-7 roles and 8-15 activities. These are empirical bounds, not preferences. Charts wider than 7 roles cannot be printed on a standard page and become difficult to use in meetings. Charts taller than 15 activities mix process levels and obscure the key accountability relationships. Larger scope requires splitting into multiple linked RACI charts by phase or sub-process.
  1. Activities must be verb phrases that describe a discrete, completable action. "Requirements" is not an activity. "Define and document product requirements" is. The activity must have a clear done state so that the A can actually make a yes/no approval decision. Vague activities produce vague accountability.
  1. Combined R/A is acceptable for routine work but should be reviewed for high-stakes or high-risk activities. In finance, legal, compliance, and security processes, internal controls often require that the person doing the work (R) and the person approving it (A) be different individuals -- this is called segregation of duties. Before combining R/A in sensitive processes, ask the user whether their compliance or audit requirements demand separation.
  1. Document a review date and process owner on every RACI. A RACI without a review date will not be reviewed. Stale RACIs are actively harmful -- people follow outdated assignments, accountability gaps form as roles change, and the chart loses organizational credibility. Set the review date before the chart is distributed.
  1. When the user's process crosses organizational boundaries -- departments, legal entities, or external parties -- flag the seams explicitly. The rows where R belongs to one organization (or department) and A belongs to another are the highest-friction rows in the chart. These cross-functional seams should be accompanied by explicit communication mechanisms and escalation paths, because the default resolution mechanism (going to a shared manager) may not exist across org boundaries.

Edge Cases

1. Matrix Organization: Multiple Reporting Lines for the Same Role

In a matrix org, an "Engineering Lead" might report to both a Functional Engineering Director and a Project Manager. Both may want to be A for the same activity.

2. Regulated Industries with Mandatory Segregation of Duties

In finance (SOX compliance), healthcare (HIPAA), payment processing (PCI DSS), and pharmaceutical manufacturing (FDA 21 CFR Part 11), certain activities legally cannot have the same person as both R and A.

3. Process Owner Does Not Exist Yet

The user is building a RACI for a process that has never had a formal owner -- perhaps because the organization is new, the process was informal, or ownership was always assumed to belong to "everyone."

4. The Process Is Run Differently by Different Teams

A large organization may have three different regional teams all running what is nominally the same process (e.g., "vendor onboarding") but with different roles, different approval thresholds, and different escalation paths.

5. Mergers, Acquisitions, and Integrations

Post-merger processes often have two legacy RACIs (or no RACIs) representing two former organizations, with overlapping roles, duplicate titles, and unresolved accountability.

6. External Vendors or Partners as Primary Executors

Some processes are largely executed by an external vendor (outsourced IT support, contract manufacturing, third-party logistics). The vendor does most of the R work.

7. Small Teams Where One Person Holds Multiple Roles

In early-stage startups or very small organizations, one individual may hold three or four roles simultaneously (CTO who is also the Engineering Lead and the Security Officer, for example).

8. RACI for a Process That Has Never Been Mapped

Sometimes the user does not have a list of activities -- they just know the process is broken and wants a RACI.


Example

Input: "We need a RACI chart for our software security patch management process. We're a mid-sized SaaS company. The roles involved are IT Operations, Security Engineer, Engineering Lead, CISO, and Product Manager. We've had problems where patches get deployed without proper risk assessment and we're not sure who actually signs off on emergency patches."


RACI Chart: Software Security Patch Management Process

Overview


RACI Matrix

| Activity | IT Operations | Security Engineer | Engineering Lead | CISO | Product Manager |

|----------|--------------|-------------------|-----------------|------|-----------------|

| Identify and triage vulnerability (CVE scan, threat intel, vendor advisory) | C | R/A | C | I | I |

| Assess risk severity and assign criticality rating (Critical/High/Medium/Low) | C | R | C | A | I |

| Notify affected system owners and stakeholders | R | A | I | I | I |

| Develop patch deployment plan (scope, rollback procedure, maintenance window) | R | C | R | I | C |

| Approve patch deployment plan | C | C | A | I | I |

| Test patch in non-production environment | R | C | R/A | I | I |

| Approve promotion to production | C | C | A | I | I |

| Deploy patch to production environment | R/A | C | C | I | I |

| Verify successful deployment and system stability | R | R | A | I | I |

| Document patch record and update asset inventory | R/A | C | I | I | I |

| Report patch status to CISO and leadership (monthly) | C | R/A | I | I | I |

| Post-incident review (if patch caused degradation) | R | R | A | I | C |

Legend:

| Code | Meaning | Rules |

|------|---------|-------|

| R | Responsible -- performs the work | At least 1 per row; multiple allowed |

| A | Accountable -- owns the outcome, approves | Exactly 1 per row; no exceptions |

| C | Consulted -- provides input before completion | Limit to essential reviewers; two-way |

| I | Informed -- notified of outcome | One-way communication |

| R/A | Responsible and Accountable -- same person performs and owns | Reviewed for segregation concerns below |

| (blank) | No involvement | Valid; not an oversight |


Role Summary

| Role | Person / Team | R Count | A Count | C Count | I Count | Notes |

|------|--------------|---------|---------|---------|---------|-------|

| Security Engineer | InfoSec Team | 5 | 5 | 5 | 0 | Primary process driver; owns risk assessment and reporting |

| IT Operations | IT Ops Team | 5 | 2 | 2 | 0 | Primary executor for deployment activities |

| Engineering Lead | Platform Eng | 3 | 4 | 4 | 2 | Technical approval authority; owns deployment quality gate |

| CISO | [Name] | 0 | 1 | 0 | 9 | Executive accountability for risk severity rating; otherwise informed |

| Product Manager | Product Team | 0 | 0 | 2 | 8 | Informed of schedule impacts; consulted on deployment window |

Concentration check: No single role holds A for more than 42% of rows. No role is I-only (CISO has 1 A for the risk severity rating, which is the critical accountability assignment for this role). Passes validation.


Segregation of Duties Notes

The following R/A combinations have been reviewed for internal control requirements:

| Row | Combined R/A Role | Risk Level | Segregation Required? | Disposition |

|-----|------------------|-----------|----------------------|-------------|

| Identify and triage vulnerability | Security Engineer | Low | No -- discovery is a single-role function | Accepted |

| Deploy patch to production | IT Operations | Medium | Recommended separation in SOC 2 Type II environments | See exceptions: Engineering Lead approves; IT Ops executes |

| Document patch record | IT Operations | Low | No | Accepted |

| Report patch status | Security Engineer | Low | No | Accepted |

Note: Organizations pursuing SOC 2 Type II certification should ensure the "Deploy patch to production" activity explicitly has a separate R (IT Operations) and A (Engineering Lead), which this chart already reflects. Combined R/A is NOT used for that row.


Decision Rules and Escalation Paths

| Scenario | Rule | Timeframe | Escalation if Unresolved |

|----------|------|-----------|--------------------------|

| Engineering Lead and Security Engineer disagree on risk severity rating | CISO makes final determination | Within 4 business hours | CISO |

| Engineering Lead rejects patch deployment plan (step 5) | Security Engineer revises plan; if 3rd rejection, CISO arbitrates | 1 business day per revision cycle | CISO |

| IT Operations identifies unexpected system behavior during deployment | Halt deployment, initiate rollback procedure, notify Engineering Lead and Security Engineer immediately | Real-time; Engineering Lead has 30 minutes to assess | CISO informed within 2 hours |

| CISO is unavailable for emergency patch authorization | Deputy CISO or CTO assumes A for risk severity rating | After 2 hours of CISO unavailability | Board-level notification if no Deputy CTO available |

| Patch deployment deadline missed (e.g., Critical CVE requires 72-hour remediation) | Security Engineer escalates to CISO; CISO notifies executive leadership | At deadline breach | Incident response plan activated |

| Security Engineer overrides C input from Engineering Lead on deployment plan | Security Engineer documents rationale in ticket; Engineering Lead may escalate to CISO | At time of override | CISO reviews within 1 business day |


Exceptions and Threshold-Based Authority

| Condition | Modified Assignment | Notes |

|-----------|-------------------|-------|

| Emergency / Zero-Day patch (Critical CVE with active exploitation) | CISO moves from I to A for patch deployment plan approval; standard 72-hour SLA compressed to 4 hours | Overrides standard approval chain; CISO directly notifies executive team |

| Patch affects customer-facing production systems | Product Manager moves from I to C for deployment window approval (row 4 and row 7) | Customer impact notification may be required; PM owns customer comms |

| Third-party vendor patch (OS, database, cloud provider) | IT Operations adds Vendor as R for delivery; internal R/A assignments unchanged | Vendor SLA governs delivery; internal RACI governs acceptance and deployment |

| Patch causes production incident | Post-incident review (row 12) is mandatory and Engineering Lead moves to A | CISO receives written incident report within 24 hours |

| Security Engineer role vacant | CISO assumes all A assignments; IT Operations assumes R assignments temporarily | Temporary assignment expires when role is filled; RACI must be reviewed within 30 days of hire |


Validation Checklist


Why this RACI solves the stated problem:

The user reported two specific failures: (1) patches deployed without proper risk assessment, and (2) unclear sign-off authority for emergency patches. This RACI addresses both directly:

  1. "Assess risk severity" is a dedicated row with Security Engineer as R and CISO as A. The CISO cannot be bypassed on this step even in a rush -- their accountability for the severity rating is explicit. No deployment plan can be developed (row 4) until the severity assessment is complete (row 3 is a prerequisite, though ordering the rows chronologically communicates this dependency).
  1. Emergency patch authority is explicitly documented in the Exceptions section with a clear authority chain (CISO as A, compressed to 4-hour SLA) and a deputy authority rule when the CISO is unreachable. The ambiguity the user described is now resolved with a specific role and a specific timeframe.