Product roadmap

From FerroxLabs/wayland · View interactive version

Product roadmap is an AI agent skill from the GitHub repository FerroxLabs/wayland. Creates product roadmaps using the Now/Next/Later framework with themes, initiatives, rationale, and stakeholder communication structure. Use when the user asks about product roadmaps, feature prioritization timelines, product planning, roadmap presentations, or quarterly planning. Do NOT use for pr

How to use this skill

Skill file

Product Roadmap

When to Use

Use this skill when:

Do NOT use this skill when:


Process

1. Gather Roadmap Context Before Writing Anything

Do not produce a roadmap without enough context. Ask clarifying questions if any of the following are missing:

If the user cannot answer several of these, note the gaps explicitly in the roadmap output so stakeholders know what assumptions were made.


2. Define Strategic Themes

Themes are the skeleton of the roadmap. They prevent the roadmap from becoming a feature list masquerading as strategy.


3. Inventory and Classify Initiatives

For each candidate initiative, capture a consistent set of attributes before placing it on the roadmap:


4. Apply the Now/Next/Later Framework

The Now/Next/Later framework is intentionally asymmetric in specificity. Resist the pressure to make Later items as specific as Now items -- that specificity would be false precision.

Now (current quarter or active sprint cycle):

Next (1-2 quarters out):

Later (3+ quarters out):

Not Doing (explicit deprioritization list):


5. Validate the Roadmap for Internal Consistency

Before presenting any roadmap, run these checks:


6. Format for the Audience

The same roadmap content requires different presentation layers for different audiences. Produce the base roadmap first, then adapt the view:


7. Define Governance, Review Cadence, and Change Communication

A roadmap without a governance model degrades within 6-8 weeks. Establish the following before circulating:


8. Deliver the Roadmap with a Narrative

A roadmap without a narrative is just a table. Write a brief framing paragraph that answers three questions:

This narrative paragraph should be 4-6 sentences maximum and should appear at the top of any roadmap presentation. It is the first thing stakeholders read and the frame through which they interpret every subsequent item.


Output Format

## Product Roadmap: [Product Name]
**Version:** [e.g., Q2 2026 -- Last updated: April 3, 2026]
**Author:** [PM name or team]
**Distribution:** [Engineering | Leadership | Customers | Investors -- choose one]

---

### Roadmap Narrative
[4-6 sentences answering: What are we accomplishing and why now? What is the key trade-off?
What must be true for this roadmap to succeed?]

---

### Product Vision and North Star
**Vision:** [One-sentence statement of the product's purpose and future state]
**North star metric:** [The single metric most correlated with product success]
**Current baseline:** [Current value of the north star metric]
**Target by end of horizon:** [Target value and timeframe]
**Time horizon covered:** [e.g., Q2-Q4 2026]

---

### Strategic Themes

| # | Theme | Business Objective | Key Metric | Current Baseline | Target |
|---|-------|-------------------|------------|-----------------|--------|
| 1 | [Theme name -- outcome-oriented] | [Acquisition/Activation/Retention/Revenue/Efficiency/Platform] | [Specific metric] | [Current value] | [Target value] |
| 2 | [Theme name] | [Objective] | [Metric] | [Baseline] | [Target] |
| 3 | [Theme name] | [Objective] | [Metric] | [Baseline] | [Target] |
| 4 | [Theme name -- technical health] | [Platform/Efficiency] | [Metric] | [Baseline] | [Target] |

---

### Now: [Quarter and Year, e.g., Q2 2026]
*Committed work. Teams assigned, discovery complete, actively in progress or scheduled.*
*Capacity check: [X] of [Y] available team-weeks allocated ([Z]% utilization)*

| Initiative | Theme | One-Line Description | Impact | Effort | Team | Status | Confidence |
|-----------|-------|---------------------|--------|--------|------|--------|------------|
| [Initiative name] | [#] | [What it is and the problem it solves] | [Specific metric impact] | [S/M/L/XL] | [Team or person] | [In progress / In design / In QA] | High |
| [Initiative name] | [#] | [Description] | [Impact] | [S/M/L/XL] | [Team] | [In discovery] | High |

**Now -- Open Risks:**
- [Any dependency, blocker, or uncertainty that could affect Now delivery]

---

### Next: [e.g., Q3-Q4 2026]
*Planned and validated. Discovery underway. Flexible on scope and sequencing.*
*Note: No delivery dates committed. Sequence may change as Now items complete and we learn more.*

| Initiative | Theme | One-Line Description | Impact | Effort | Open Dependencies | Confidence |
|-----------|-------|---------------------|--------|--------|------------------|------------|
| [Initiative name] | [#] | [Description] | [Impact] | [S/M/L/XL] | [Dependency or "None"] | Medium |
| [Initiative name] | [#] | [Description] | [Impact] | [S/M/L/XL] | [Dependency] | Medium |

---

### Later: [e.g., 2027 and beyond]
*Directional and strategic. Theme-level intent. Details will be defined when items move to Next.*

| Theme | Strategic Direction | Why It Matters | What Would Accelerate It |
|-------|--------------------|-----------------|-----------------------------|
| [#] | [Capability or direction, not feature spec] | [Strategic rationale] | [Signal or trigger that would move this to Next] |
| [#] | [Direction] | [Rationale] | [Trigger] |

---

### Not Doing (and Why)

| Initiative | Reason for Deprioritization | Revisit Condition |
|-----------|---------------------------|-------------------|
| [Item requested or considered] | [Specific reason: data, capacity, strategy] | [What would change this decision] |
| [Item] | [Reason] | [Condition] |

---

### Capacity and Investment Allocation

**Team:** [X] engineers, [Y] designers, [Z] PMs
**Available capacity this quarter:** ~[N] team-weeks (after accounting for meetings, on-call, holidays)

| Investment Category | % of Capacity | Rationale |
|--------------------|--------------:|-----------|
| New feature development | [X]% | [Why this allocation] |
| Product improvements / UX debt | [Y]% | [Why] |
| Technical debt and infrastructure | [Z]% | [Why -- industry benchmark: 15-25%] |
| Discovery and research | [W]% | [Why] |
| **Total** | **100%** | |

---

### Assumptions and Dependencies

| Assumption / Dependency | Type | Risk Level | Owner | Mitigation |
|------------------------|------|-----------|-------|------------|
| [e.g., Platform team delivers Auth API by end of April] | External dependency | High | [Name] | [Contingency plan] |
| [e.g., Mid-market demand signal holds based on 12 sales interviews] | Assumption | Medium | PM | [Revalidate with 5 more interviews before Next quarter] |

---

### Roadmap Governance

**Review cadence:** [Monthly check-in on Now items | Quarterly replanning for full roadmap]
**Replanning authority:** [Who can move items between horizons and under what conditions]
**Change communication:** [How and when stakeholders are notified of changes]
**Source of truth location:** [Link or tool name where live roadmap is maintained]
**Last full replanning session:** [Date]
**Next scheduled replanning:** [Date]

Rules

  1. Never assign specific calendar dates to Next or Later items. Dates on unvalidated items create implicit delivery contracts with stakeholders. Use relative horizons (next quarter, H2, next fiscal year) and explicitly state that items will be scoped and dated only when they move into Now.
  1. Every initiative must map to exactly one theme, and every theme must map to a business objective. An initiative with no theme is a feature request wearing roadmap clothes. A theme with no business objective is internal vocabulary, not strategy. Remove or reclassify both.
  1. "Now" must pass a capacity sanity check. Sum effort estimates for all Now items. They should not exceed 70-80% of available team capacity. Reserve the remaining 20-30% explicitly for unplanned work, bug escalations, and overhead. If the math doesn't work, move items to Next -- do not inflate capacity assumptions.
  1. Confidence levels must be honest and evidence-based. High confidence requires user research data, analytics evidence, or a completed technical spike. Medium confidence requires at least qualitative signal from multiple sources (3+ customer interviews, sales call themes, NPS verbatims). Low confidence is a directional bet. Mislabeling Low as High is the most common source of roadmap credibility collapse.
  1. The "Not Doing" section is mandatory. A roadmap without explicit deprioritization will continuously accumulate items from stakeholders who never see their requests formally declined. Each "Not Doing" entry requires a specific reason and a revisit condition -- not a vague "low priority."
  1. Later items should be theme-level or capability-level, not initiative-level. The moment you write feature-level detail for items 9+ months away, you invite stakeholders to anchor on that detail and hold you accountable for it. Keep Later deliberately high-level to preserve strategic flexibility.
  1. Technical debt allocation must be explicit and percentage-bounded. It should appear as a named investment category with a percentage of capacity. Teams that hide technical debt inside feature initiatives lose visibility into true velocity and accumulate compounding risk. Industry reference: below 15% of capacity on technical health in a growth-stage product is unsustainably low.
  1. The roadmap must include a written narrative, not just tables. Tables answer "what." Narratives answer "why" and "why now." A roadmap presented without a framing narrative will be interpreted differently by different stakeholders, producing misalignment that the roadmap was supposed to prevent.
  1. Format must match audience. Engineering views include technical initiatives, infrastructure work, dependencies, and effort. Executive views suppress initiative-level detail in Next/Later and lead with themes and business metrics. Customer-facing views remove all internal work and use outcome language ("You will be able to..."). Presenting the engineering view to customers or the executive view to engineers both produce confusion and erode trust.
  1. Review and replan at a defined cadence -- quarterly at minimum. A roadmap that is not replanned after a quarter of new learning is not a living strategic document; it is a historical artifact. At each quarterly replan, explicitly assess: what shipped vs. slipped, what changed in the market or with customers, and whether the themes still reflect the right bets. Update the version date and changelog so stakeholders can see when and why the roadmap changed.
  1. Dependencies must be called out explicitly and owned. Every cross-team, external, or technical dependency in Now or Next must have a named owner and a mitigation plan. Untracked dependencies are the most common cause of Now items slipping to Next without warning.
  1. Balance themes across the acquisition-to-retention funnel. A growth-stage product that allocates 90% of roadmap effort to acquisition features while neglecting activation and retention is filling a leaky bucket. If a product has greater than 3% monthly churn, retention themes should receive at minimum 30-40% of roadmap effort until churn is below 2%.

Edge Cases

New Product With No User Data or Market Validation

When a product has no existing users, no analytics, and limited customer research, treat the roadmap as a validated learning plan rather than a delivery plan.

Platform or Infrastructure Team Serving Internal Customers

Platform teams have a roadmap structure problem: their "users" are internal engineering teams, not end customers. Standard user-benefit framing breaks down.

Roadmap for a Product Being Wound Down or Sunset

Sunset roadmaps require a complete inversion of the standard structure and extreme clarity in communication.

Multiple Products or Product Lines Sharing One Team

When a single engineering team serves multiple product lines or customer segments, resource contention must be made explicit in the roadmap.

Rapidly Evolving Market Requiring Frequent Replanning

In markets with fast competitive moves, regulatory changes, or high uncertainty (early-stage AI tooling, newly regulated categories, crisis-driven pivots), the standard quarterly cycle is too slow.

Stakeholder Conflict Over Roadmap Priorities

When multiple senior stakeholders (sales leader, engineering head, and marketing leader, for example) have competing views on what should be in Now, the roadmap becomes a political document rather than a strategic one.

Annual Planning With Incomplete Input Data

Many organizations do annual planning before the previous year's results are finalized, before customer research for the coming year is complete, and before budget is confirmed. This creates pressure to fake precision.


Example

Input: "I'm the PM for a B2B SaaS project management tool. We have a team of 5 engineers (mix of senior and mid-level), 1 product designer, and it's just me as PM. The product has been live for 18 months, has about 140 business customers, average contract size is $8,400/year, and our monthly churn is running at 3.8% -- way too high. We're also seeing a lot of interest from larger companies (50-200 person teams) but we're losing deals because we don't have SSO, audit logs, or role-based permissions. Sales is pushing hard for those features. Meanwhile, engineering is warning me we have serious performance issues -- our task search times out for any project with more than 500 tasks. I need to plan Q3 and Q4 2026. What should the roadmap look like?"


Output:

Product Roadmap: WorkStream (Project Management Platform)

Version: Q3-Q4 2026 -- Last updated: June 15, 2026

Author: Product Management

Distribution: Internal -- Leadership and Engineering


Roadmap Narrative

WorkStream's most urgent challenge entering H2 2026 is a 3.8% monthly churn rate that is quietly eroding our installed base while sales works to grow it -- at this rate, we are losing roughly 5 customers per month and fighting to stand still. The key trade-off this half is sequencing: we could chase mid-market expansion immediately with the enterprise features sales is requesting, but doing so before fixing the retention problem would mean selling larger contracts into a leaky product. Instead, we are sequencing churn-reduction interventions first in Q3, layering in enterprise readiness in parallel where it can be done without additional scope pressure, and delivering the full mid-market feature set in Q4 when the product is stable enough to sustain higher-value accounts. For this plan to succeed, three things must be true: engineering's search performance fix must ship in the first 6 weeks of Q3, churn interviews scheduled for June must surface actionable root causes, and the sales pipeline for mid-market accounts must hold so Q4 investment is justified.


Product Vision and North Star

Vision: Give every team -- from 5-person startups to 200-person departments -- a single place where projects don't fall through the cracks.

North star metric: Weekly active projects per account (WAP/account) -- a project is "active" if it has at least one task updated in the last 7 days

Current baseline: 4.2 active projects per account per week

Target by end of Q4 2026: 6.8 active projects per account per week

Time horizon covered: Q3 2026 (July-September) and Q4 2026 (October-December)


Strategic Themes

| # | Theme | Business Objective | Key Metric | Current Baseline | Target (EOY 2026) |

|---|-------|-------------------|------------|-----------------|-------------------|

| 1 | Stop the bleed: reduce churn | Retention | Monthly churn rate | 3.8% | <2.0% |

| 2 | Enterprise readiness | Revenue expansion / Acquisition | Win rate on 50-200 seat deals | ~18% (est. from sales data) | >40% |

| 3 | Performance and reliability | Platform / Retention | Task search P95 latency; Uptime | 12.4s P95 search; 99.6% uptime | <1.5s P95; 99.9% uptime |

| 4 | Onboarding and activation | Activation / Retention | % of new accounts reaching 5+ active projects in week 1 | 22% | 45% |

Theme rationale: Theme 1 and Theme 3 are directly linked -- exit interviews suggest performance issues are a top-3 churn reason. Themes 1 and 4 address the retention problem from two angles: keeping current users and getting new users to value faster. Theme 2 is the growth investment, sequenced after retention work because mid-market customers will scrutinize reliability more, not less.


Now: Q3 2026 (July -- September 2026)

Committed work. Teams assigned, discovery complete, actively scoped.

Capacity check: ~60 team-weeks available (5 engineers x 13 weeks x 85% productive time, after meetings and on-call). 47 team-weeks allocated = 78% utilization. 13 team-weeks reserved for unplanned work and bug escalations.

| Initiative | Theme | One-Line Description | Impact | Effort | Team | Status | Confidence |

|-----------|-------|---------------------|--------|--------|------|--------|------------|

| Task search re-architecture | 3 | Rebuild search index using Postgres full-text search with pagination; eliminate timeout for projects >500 tasks | Eliminate #1 reported performance complaint; estimated to recover 0.8% churn/month based on exit interviews | L (14 team-weeks) | Backend team (2 engineers) | Technical spike complete; implementation ready | High |

| Churn interview program (10 accounts) | 1 | Conduct structured 30-minute exit interviews with 10 churned accounts from last 60 days; synthesize into top 5 fixable root causes | Grounds Q4 retention initiatives in validated root causes rather than guesses | S (2 team-weeks -- PM time + 1 designer for concept testing) | PM + Designer | Recruiting underway; 6 of 10 confirmed | High |

| Role-based permissions (3-tier: Admin, Member, Viewer) | 2 | Implement three permission tiers; required by 100% of mid-market prospects in active pipeline | Unblocks 11 deals in pipeline estimated at $340K ARR | M (10 team-weeks) | Full-stack team (2 engineers) | Design complete; engineering scoped | High |

| In-app onboarding checklist with sample project | 4 | Replace blank-slate first experience with a guided checklist and pre-populated sample project matching user's stated use case | Benchmark: similar products report 35-50% improvement in week-1 activation after guided onboarding | S (5 team-weeks) | Designer (design complete) + 1 engineer | In development | High |

| Critical bug backlog clearance (Q3 sprint) | 3 | Resolve top 12 bugs by severity from support queue; 4 are customer-blocking, 8 are significant UX degraders | Estimated 0.3% churn reduction based on ticket-to-churn correlation analysis | S (4 team-weeks) | Rotating (1 engineer dedicated per 3-week sprint) | Ongoing | High |

Now -- Open Risks:


Next: Q4 2026 (October -- December 2026)

Planned and validated through sales pipeline data, support ticket analysis, and partial churn interview results. Scope flexible; will be finalized in September replanning.

Note: No delivery dates committed for these items. Sequencing will be confirmed based on Q3 outcomes.

| Initiative | Theme | One-Line Description | Impact | Effort | Open Dependencies | Confidence |

|-----------|-------|---------------------|--------|--------|------------------|------------|

| SSO / SAML integration | 2 | Integrate SAML 2.0 SSO; support Okta and Azure AD as the two most requested IdPs | Required by 9 of 11 pipeline deals; primary reason for mid-market loss per sales | M (8 team-weeks) | Role-based permissions must ship in Q3 (SSO requires permission tiers to enforce) | High |

| Proactive at-risk account intervention (health score + PM alert) | 1 | Build account health score (based on WAP/account, login frequency, task completion rate); alert PM when account drops below threshold for 2 consecutive weeks | Enables Customer Success to intervene before churn, not after. Estimated to reduce churn 0.5-1.0% if CS acts within 5 days | M (9 team-weeks) | Requires WAP/account metric instrumentation (already in Now as part of search work) | Medium |

| Audit log (read-only, 90-day retention) | 2 | Provide admin-accessible log of all permission changes, project deletions, and member additions/removals | Required by compliance-sensitive mid-market accounts; blocks 4 of 11 pipeline deals | S-M (6 team-weeks) | Role-based permissions (Q3) | High |

| Onboarding personalization by use case (3 tracks) | 4 | Extend Q3 onboarding checklist with 3 distinct tracks: software development, marketing campaigns, and professional services | Target: lift week-1 activation from 45% (Q3 target) to 60%; use cases cover 74% of current customer base | M (8 team-weeks) | Q3 onboarding checklist must ship and have 4+ weeks of data before building personalization on top | Medium |

| Guest / external collaborator access | 2 | Allow accounts to invite non-paying external collaborators (clients, contractors) with limited Viewer-only access | Requested by 34% of accounts in NPS survey (Q1 2026); also a viral growth mechanic -- guests see the product and may convert | M (10 team-weeks) | Role-based permissions (Q3) | Medium |


Later: 2027 and Beyond

Directional and strategic. Theme-level intent only. Details will be defined when items enter Next.

| Theme | Strategic Direction | Why It Matters | What Would Accelerate It |

|-------|--------------------|-----------------|-----------------------------|

| 2 | Enterprise admin console: centralized billing, user provisioning, and usage analytics for IT administrators | Mid-market at 200+ seats requires IT governance capabilities that go beyond team-level admin | 3+ closed mid-market deals at 150+ seats where IT buyer explicitly requires this; target Q1 2027 |

| 1 | Automated re-engagement sequences for dormant projects | Projects that go dormant are a leading indicator of account churn 60-90 days later; automated nudges could recapture engagement before CS intervention is needed | Churn interview data from Q3 confirms project abandonment (vs. feature gaps) as top-3 churn driver |

| 4 | Integrations marketplace: Slack, Jira, Google Workspace, and Zapier | Reduces switching cost and increases daily habit formation by embedding WorkStream into existing workflows | Top integration requests reach 30% of active accounts; currently at 19% for Slack, 14% for Google Workspace |

| 3 | Real-time collaboration (live cursor and simultaneous editing on task boards) | Table-stakes feature for next competitive tier; differentiates from async-only tools in enterprise evaluation shortlists | Real-time capability appears in competitive losses at rate >35%; currently at 22% |


Not Doing (and Why)

| Initiative | Reason for Deprioritization | Revisit Condition |

|-----------|---------------------------|-------------------|

| Mobile app (iOS/Android) | Usage analytics show 3.1% of sessions on mobile; insufficient demand to justify 3-4 months of engineering for a 5-person team. Not a table-stakes expectation in our B2B segment. | Mobile session share exceeds 12%, or 3+ enterprise churns cite mobile access as primary reason |

| Time tracking and billing module | Requested by 8 accounts; builds into a different product category (PSA software) requiring dedicated PM focus we don't have. Risk of over-complicating the core PM product. | 25+ accounts request it, or a dedicated PM role is added to the team |

| AI task suggestion / auto-assignment | Interesting directional bet but requires a data foundation (activity history, workload data) that doesn't exist yet. Building AI features on thin data produces poor models and erodes user trust. | 12+ months of normalized activity data per account available; model accuracy >70% in internal testing |

| White-label / OEM version for resellers | Two reseller inquiries in Q1 2026; not enough signal to justify the architectural complexity of multi-tenant branding customization | 5+ signed LOIs from reseller partners or a strategic partnership deal that justifies dedicated investment |


Capacity and Investment Allocation

Team: 5 engineers (2 senior, 3 mid-level), 1 designer, 1 PM

Available capacity Q3 2026: ~60 team-weeks

| Investment Category | % of Capacity | Team-Weeks | Rationale |

|--------------------|--------------:|------------|-----------|

| New feature development | 38% | 23 | Role-based permissions, onboarding checklist |

| Product improvements and UX debt | 13% | 8 | Bug backlog, onboarding UX |

| Technical debt and infrastructure | 23% | 14 | Search re-architecture (above 15-25% benchmark this quarter because the debt is actively causing churn) |

| Discovery and research | 3% | 2 | Churn interview program (PM + designer time) |

| Unplanned buffer | 22% | 13 | On-call, escalations, unscoped requests |

| Total | 100% | 60 | |

Note: Technical debt allocation is above the 15-25% benchmark this quarter due to the search performance issue actively contributing to churn. This is a one-quarter exception, not a baseline.


Assumptions and Dependencies

| Assumption / Dependency | Type | Risk Level | Owner | Mitigation |

|------------------------|------|-----------|-------|------------|

| Churn interviews (10 accounts) confirm performance and onboarding as top root causes | Assumption | Medium | PM | If interviews reveal a different root cause (e.g., pricing, integration gaps), August replanning session will adjust Q4 Next items |

| Role-based permissions ships by end of August to unblock SSO in Q4 | Internal dependency | High | Engineering Lead | Two-engineer allocation confirmed; scope locked; no new requirements accepted |

| Sales pipeline of 11 mid-market deals holds through Q3 | External assumption | Medium | Sales Lead | Monitor weekly; if pipeline drops below 5 deals, rebalance Theme 2 effort toward retention |

| Schema migration for search can be executed with a maintenance window acceptable to enterprise customers | Technical assumption | Medium | Backend Lead | Customer advisory communication plan ready by July 14; fallback is a phased migration approach with zero-downtime cutover |


Roadmap Governance

Monthly check-in (Now items): First Monday of each month, 30 minutes. PM + Engineering Lead review: what shipped, what is blocked, what has changed.

Quarterly replanning: Week of September 15. Full team. Inputs: churn interview synthesis, Q3 delivery retrospective, updated pipeline data from sales, any market or competitive changes. Output: confirmed Q4 Now plan.

Change authority: PM + Engineering Lead can resequence Next items. Moving an item into Now mid-quarter requires PM + Engineering Lead + notification to affected stakeholders within 48 hours, including what is being displaced.

Change communication: Customers are not on this distribution. Any changes affecting external-facing commitments (e.g., features promised to a specific account by sales) require Sales Lead notification before the change is made.

Source of truth: Notion workspace > Product > Roadmap > H2 2026 (live document). This presentation is a snapshot. Do not distribute the slide version as the authoritative source.

Last full replanning session: June 10, 2026

Next scheduled replanning: September 15, 2026