Product launch checklist

From FerroxLabs/wayland · View interactive version

Product launch checklist is an AI agent skill from the GitHub repository FerroxLabs/wayland. Creates a pre-launch checklist covering engineering readiness, marketing preparation, customer support, legal review, and communications for product or feature launches. Use when the user asks about product launch checklists, go-live preparation, launch readiness, pre-launch planning, or feature rel

How to use this skill

Skill file

Product Launch Checklist

When to Use

Use this skill when:

Do NOT use this skill when:


Process

Step 1: Gather Launch Context Before Building the Checklist

Do not generate a generic checklist before understanding the launch. Ask the user for the following inputs, and use their answers to customize every section:

Use these answers to mark sections as Required, Optional, or Not Applicable in the final checklist. A minor feature update for internal users does not need a PR section. A launch involving PII data collection requires the full legal and security section.


Step 2: Build the Engineering Readiness Checklist

Engineering readiness is the gating dependency for everything else. Build this section with the following specifics:


Step 3: Build the Marketing and Communications Checklist

Marketing readiness depends entirely on the launch type. A major external launch needs all items. An internal beta needs almost none. Apply judgment based on Step 1 answers.


Step 4: Build the Customer Support Checklist

Support is the most common under-resourced workstream in a launch. Deficiencies here directly cause public negative reviews, social media complaints, and churn.


Step 5: Build the Legal and Compliance Checklist

Legal review timelines are often the longest lead-time item in a launch. Identify legal dependencies in Step 1 and initiate legal review at least 2-3 weeks before the launch date.


Step 6: Build the Go/No-Go Decision Framework

The go/no-go meeting is not a status update -- it is a decision gate. Structure it properly.


Step 7: Create the Launch Day Run Sheet

The run sheet converts the checklist into a time-ordered sequence of actions with named owners.


Output Format

## Launch Checklist: [Product/Feature Name]
**Version:** [1.0] | **Created:** [Date] | **Owner:** [PM Name]

---

### Launch Overview

| Field | Detail |
|---|---|
| **Launch name** | [Descriptive name, not just a ticket number] |
| **Launch date and time** | [Date, time, timezone] |
| **Launch type** | [New product / Major feature / Minor feature / Beta / Internal] |
| **Target audience** | [All users / Segment description / Beta group / Internal only] |
| **Rollout strategy** | [Big-bang / Phased: 10%→25%→50%→100% / Feature-flag by segment / Canary] |
| **Go/no-go decision** | [Date, time, timezone -- Decision maker: Name] |
| **Post-launch review** | [Date, time -- Owner: Name] |
| **Estimated reach on day 1** | [Number of users or percentage of DAU] |

---

### Engineering Readiness

#### Code and Testing
- [ ] All features merged to release branch; no pending required PRs
- [ ] Unit tests passing (coverage: [X]% -- threshold: [Y]%)
- [ ] Integration tests passing in staging
- [ ] End-to-end tests passing in staging
- [ ] Regression suite passing -- no existing features broken
- [ ] [Feature-specific test]: [description and result]

#### Performance
- [ ] Load test completed at [X] concurrent users (representing [Y]% peak load)
  - P50 latency: [X]ms (target: <[Y]ms)
  - P95 latency: [X]ms (target: <[Y]ms)
  - P99 latency: [X]ms (target: <[Y]ms)
  - Error rate: [X]% (target: <[Y]%)
- [ ] Database query plan reviewed; no full table scans at projected volume
- [ ] Third-party API rate limits reviewed: [service name, limit, expected usage]

#### Security
- [ ] OWASP review completed for new input surfaces
- [ ] New data collection reviewed and documented: [what PII, where stored, retention period]
- [ ] Authorization rules tested: new feature respects existing access controls
- [ ] Dependency audit: no critical/high CVEs in new packages

#### Infrastructure and Deployment
- [ ] Database migration tested in staging with production-like data volume
  - Migration runtime: [X] seconds (reversible: Yes / No)
- [ ] Environment variables deployed to production (not manual steps at launch time)
- [ ] Feature flags configured:
  - Flag name: [flag_name] | Initial state: [OFF / ON for X% / ON for group Y]
- [ ] CDN cache invalidation plan: [assets affected, invalidation trigger]
- [ ] Artifact built and stored in registry (not built at deploy time): [version tag]

#### Observability
- [ ] Monitoring dashboard live: [link]
  - Watches: error rate, latency P50/P95/P99, throughput, [feature-specific metric]
- [ ] Custom metrics configured: [list feature-specific metrics]
- [ ] Alert rules configured:
  - Alert: error rate > [X]% → [channel and on-call]
  - Alert: P95 latency > [X]ms sustained [Y] min → [channel and on-call]
- [ ] Structured logs flowing to log aggregation platform
- [ ] On-call roster updated: Primary: [Name], Secondary: [Name], Escalation: [Name]

#### Rollback
- [ ] Rollback procedure documented: [link]
- [ ] Rollback tested in staging: confirmed working on [date]
- [ ] Rollback decision authority: [Name and contact]
- [ ] Data rollback strategy (if migration not reversible): [describe]

**Engineering readiness sign-off:** [Engineering Lead] -- [Date]

---

### Marketing and Communications

#### Messaging
- [ ] Core value proposition statement approved by: [Name, Date]
- [ ] Elevator pitch (2-3 sentences) finalized
- [ ] Product screenshots / demo video created and approved

#### Content Assets
- [ ] Blog post / changelog: [Status] | Publish date: [Date] | Author: [Name]
- [ ] User email: [Status] | Send date: [Date] | Segment: [Description] | List size: [N]
- [ ] In-app announcement / tooltip: [Status] | Trigger condition: [Description]
- [ ] Website product page update: [Status] | URL: [URL]
- [ ] Help center articles: [X] articles published | Links: [list]

#### Social and Paid
- [ ] Social posts prepared: [Platforms] | Scheduled for: [Date/Time]
- [ ] Social monitoring configured for launch day: [Tool / Keyword list]
- [ ] Paid campaigns updated / paused as needed: [Status]

#### Enablement
- [ ] Sales team briefed: [Date] | Talk track link: [link] | Objection handler: [link]
- [ ] Customer Success team briefed: [Date] | Account priority list for proactive outreach: [link]
- [ ] Partner / integration marketplace listings updated: [Status or N/A]

#### Internal
- [ ] Company-wide announcement: [Channel] | [Date/Time]
- [ ] Executive briefing sent: [Date] | Key metrics they are watching: [list]

**Marketing readiness sign-off:** [Marketing Lead] -- [Date]

---

### Customer Support Readiness

- [ ] Support team training completed: [Date] (≥48 hours before launch)
  - Training format: [Live session / Recording / Both]
  - Attendance confirmed: [X of Y agents trained]
- [ ] Agents have personally used the feature in staging: [Confirmed by: Name, Date]
- [ ] FAQ document published: [Link] | [X] questions covered
- [ ] Troubleshooting guide published: [Link] | Top errors covered: [list]
- [ ] Response templates created for:
  - [ ] "I cannot find the new feature"
  - [ ] "The feature is not working for me"
  - [ ] [Feature-specific expected question 1]
  - [ ] [Feature-specific expected question 2]
- [ ] Known issues register created: [Link] | Updated in real time by: [Name]
- [ ] Escalation path defined:
  - L1 → L2: [condition and contact]
  - L2 → Engineering on-call: [condition and contact: Name, channel]
- [ ] Launch window staffing plan: [number of agents], [hours of coverage], [queue owner]
- [ ] Support tagging convention: [tag name for launch-related contacts]
- [ ] Feedback collection configured: [mechanism, trigger timing, review owner]

**Support readiness sign-off:** [Support Lead] -- [Date]

---

### Legal and Compliance

| Item | Status | Required | Owner | Completed Date |
|---|---|---|---|---|
| Terms of service review | [ ] | [Yes / No / N/A] | [Name] | |
| Privacy policy review | [ ] | [Yes / No / N/A] | [Name] | |
| Cookie consent / CMP update | [ ] | [Yes / No / N/A] | [Name] | |
| GDPR compliance review | [ ] | [Yes / No / N/A] | [Name] | |
| CCPA compliance review | [ ] | [Yes / No / N/A] | [Name] | |
| [Regulation specific to industry] | [ ] | [Yes / No / N/A] | [Name] | |
| WCAG 2.1 AA accessibility audit | [ ] | [Yes / No / N/A] | [Name] | |
| Enterprise contract review | [ ] | [Yes / No / N/A] | [Name] | |
| Security review sign-off | [ ] | [Yes / No / N/A] | [Name] | |

**Legal readiness sign-off:** [Legal / Compliance Lead] -- [Date]

---

### Go/No-Go Decision

**Meeting:** [Date] at [Time] [Timezone]
**Facilitator:** [PM Name]
**Attendees:** [List]
**Pre-read sent by:** [Date/Time, at least 2 hours before]

#### Hard Blockers (Launch cannot proceed if any are unresolved)

| Criterion | Status | Owner |
|---|---|---|
| No unresolved critical or high security vulnerabilities | [ ] | Engineering Lead |
| Rollback procedure documented and tested | [ ] | Engineering Lead |
| Support team trained (≥48 hours prior) | [ ] | Support Lead |
| All required legal/compliance items resolved | [ ] | Legal Lead |
| Load test passed at projected peak load | [ ] | Engineering Lead |
| [Feature-specific hard blocker] | [ ] | [Owner] |

#### Soft Blockers (Documented risk; launch may proceed with mitigation)

| Criterion | Status | Mitigation Plan | Owner |
|---|---|---|---|
| All marketing assets complete | [ ] | [Mitigation if incomplete] | Marketing Lead |
| No P2 or lower open bugs | [ ] | [Workaround documented] | Engineering Lead |
| [Other soft blocker] | [ ] | | |

**Decision:** [ ] Go | [ ] Conditional Go -- Condition: [describe] | [ ] No-Go -- Reschedule to: [Date]
**Decision maker:** [Name]
**If no-go, notify:** [Names and channels, within 1 hour of decision]

---

### Launch Day Run Sheet

| Time | Action | Owner | Dependencies | Status |
|---|---|---|---|---|
| T-24h | Final staging verification and smoke test | Engineering | Staging env stable | [ ] |
| T-24h | Communications assets final review | Marketing | All assets queued | [ ] |
| T-24h | Go/no-go meeting (if not held earlier) | PM | Checklist complete | [ ] |
| T-2h | On-call engineers confirmed available | PM | On-call roster | [ ] |
| T-2h | Monitoring dashboards verified active | Engineering | Alerts configured | [ ] |
| T-1h | Internal notification: launch beginning | PM | Go decision confirmed | [ ] |
| T-0 | Deploy / activate feature flag | [Engineer Name] | All pre-checks done | [ ] |
| T+10m | Manual smoke test (PM or QA) | [Name] | Deployment complete | [ ] |
| T+15m | First metrics check: error rate, latency | [Engineer Name] | Monitoring live | [ ] |
| T+30m | External communications sent | Marketing | Smoke test passed | [ ] |
| T+1h | Internal launch status update to stakeholders | PM | First metrics reviewed | [ ] |
| T+4h | Metrics + support queue review | PM + Engineering + Support | | [ ] |
| T+4h | Social sentiment check | Marketing | | [ ] |
| T+24h | Metrics snapshot documented | PM | | [ ] |
| T+48h | Post-launch review meeting | All teams | Metrics snapshot ready | [ ] |

---

### Rollback Triggers

| Trigger Condition | Threshold | Action | Decision Authority |
|---|---|---|---|
| Error rate elevated | >[X]% sustained for >5 min (baseline: [Y]%) | Disable feature flag; investigate | Engineering Lead |
| P95 latency elevated | >[X]ms sustained for >10 min (baseline: [Y]ms) | Investigate; disable flag if not resolved in 15 min | Engineering Lead |
| P0 bug confirmed | Any data loss, auth bypass, or payment error | Immediate rollback; PM and Exec notified | Engineering Lead (no need to wait for PM) |
| Support contact spike | >5x normal daily rate within first 4 hours | Assess pattern; escalate to PM for rollback decision | PM |
| [Feature-specific trigger] | [Threshold] | [Action] | [Name] |

**Rollback notification chain:** Engineering Lead → PM → [VP/Head of Product] → Support Lead → Marketing Lead (in that order)

---

### Post-Launch Success Metrics

| Metric | Baseline | Day 1 Target | Day 7 Target | Owner |
|---|---|---|---|---|
| Feature activation rate | N/A | [X]% of reached users | [Y]% of reached users | PM |
| Error rate | [pre-launch %] | <[X]% | <[X]% | Engineering |
| P95 latency | [pre-launch ms] | <[X]ms | <[X]ms | Engineering |
| Support contact volume | [daily baseline] | <[X]x baseline | Back to baseline | Support |
| [Feature-specific metric] | [baseline] | [target] | [target] | [owner] |

Rules

  1. Never build the checklist before gathering launch context. A generic checklist is worse than no checklist because it creates false confidence. A privacy policy update is irrelevant for an internal tool. A load test threshold is meaningless without knowing current DAU. Always run Step 1 first.
  1. Every rollback trigger must be a specific, measurable number. "If things look bad" is not a trigger. "If error rate exceeds 2% of requests sustained for more than 5 minutes, and the pre-launch baseline is 0.3%" is a trigger. The comparison to baseline is required -- a 2% error rate is critical for one product and normal for another.
  1. The go/no-go meeting must happen 24-48 hours before launch, not on launch day. Scheduling it on launch morning eliminates the ability to execute a contingency plan. If the decision is "no-go" at T-1 hour, it is too late to halt scheduled email sends, coordinated announcements, or social posts.
  1. Support team training must complete at least 48 hours before launch. Training the support team the morning of launch means they will be handling real user issues before they have processed the information. The 48-hour buffer is not a suggestion -- it is the minimum time required for agents to absorb training, ask clarifying questions, and practice responses.
  1. External communications may not be sent until the smoke test passes. Sending an email to 50,000 users announcing a feature that is broken in production is a worse outcome than a 30-minute delay. The run sheet must always sequence smoke test before external communications.
  1. Legal review has the longest lead time and must be initiated first. Legal review for a new data collection feature typically takes 1-3 weeks. Initiating legal review in the final week before launch is not legal review -- it is a checkbox. Identify legal dependencies in Step 1 and flag them immediately so review can start with adequate lead time.
  1. Database migrations that are not reversible require a data preservation strategy documented before the go/no-go meeting. A non-reversible migration means that rolling back the code does not return the system to its prior state. This is not a reason to block a launch, but it must be explicitly acknowledged and documented -- not discovered during a production rollback attempt.
  1. Known bugs must be documented with severity, workaround status, and customer impact -- not hidden or minimized. The go/no-go decision requires complete information. A known P2 bug with no workaround affects enterprise customers differently than a P3 cosmetic issue. The people making the go/no-go decision must see the real list.
  1. Post-launch review must be calendared before the launch occurs. A post-launch review scheduled after the launch is frequently cancelled or forgotten. It should appear on everyone's calendar as part of the launch checklist, scheduled for T+48 hours, before the launch date arrives.
  1. Phased rollout is the default strategy for any launch that affects more than 1,000 users. Big-bang launches forfeit the ability to limit blast radius on unexpected issues. The cost of a phased rollout (slightly delayed full availability) is almost always lower than the cost of a full-scale incident caused by an issue that would have appeared in a 5% cohort. The burden of proof is on the case for big-bang, not on the case for phased rollout.
  1. Never mark legal items as N/A without a documented reason. "Not applicable" must be accompanied by the specific rationale (e.g., "No new PII is collected -- confirmed by engineering review on [date]"). An unchecked N/A is an assumption; a documented N/A is a decision.
  1. Internal communication must include updates during the rollout, not just a single "we launched" announcement. Stakeholders watching metrics, preparing for sales calls, or managing customer accounts need to know the launch is proceeding normally. The run sheet must include at minimum a T+1 hour internal status update.

Edge Cases

Soft Launch or Limited Beta Release

Reduce the marketing section significantly -- no public blog post, no email to all users, no social media posts. Replace the marketing section with a beta-specific section: direct outreach to beta participants, a clear communication of what is and is not yet finished, and an explicit set of feedback channels (user interviews, in-app survey, dedicated Slack channel, or direct email). The engineering and support sections remain fully intact. The go/no-go section still applies. Beta releases often skip the go/no-go meeting; do not allow this -- a beta to 200 users still needs a rollback procedure and support escalation path.

Emergency Hotfix or Critical Security Patch

Compress the checklist to a minimal emergency version. Required items: engineering verification that the fix addresses the root cause (not just the symptom), staging test passing, rollback procedure documented, monitoring confirmed active, and the on-call engineer confirmed available. Skip all marketing items -- no user-facing announcement is needed for a security patch in most cases, though some regulatory regimes (GDPR breach notification) require customer communication within 72 hours if the vulnerability exposed user data. Support should be notified via a brief 5-minute briefing or written alert, but a full training session is not required. The standard 48-hour support training rule does not apply. Legal should be looped in immediately if the fix involves a potential data exposure.

International or Multi-Region Launch

Create a region-specific extension of the run sheet. Each region has its own: T-0 time in local timezone, external communications schedule (send the email at 9am local time, not 2am), and support coverage confirmation. Regulatory compliance items multiply by region -- GDPR applies to EU, PIPL applies to mainland China, LGPD applies to Brazil; confirm each is in scope and has been reviewed. Consider a "follow the sun" rollout pattern: launch in APAC first during their business day, let it stabilize for 8 hours, then launch in EMEA, then Americas. This pattern gives each region a fresh on-call rotation and limits simultaneous blast radius. Localized content (translated blog posts, localized help articles, in-product copy) must be reviewed by a native speaker, not just machine-translated.

Platform Launch (iOS, Android, and Web Simultaneously)

Mobile app store review timelines make simultaneous launches difficult. Apple App Store review typically takes 1-3 days but can take up to 7 days for new apps or features that require additional review (health data, payments, age ratings). Google Play review is typically 1-2 days. Build the mobile app store submission lead time into the launch plan, targeting app store submission 7-10 days before the planned launch date. If app store approval is delayed, the web launch can proceed on schedule but external communications must explicitly set expectations ("available on web now; iOS and Android coming within X days"). Never submit app store binaries on the day you need them approved. Feature flags allow the mobile experience to be gated even after the app is approved, enabling true simultaneous activation across platforms.

Re-Launch of a Previously Failed Feature

Add a dedicated section to the checklist: "Previous Launch Failure Review." This section must document: what the root cause of the previous failure was (not just symptoms), what specifically has changed to address each root cause, and what additional monitoring or safeguards have been added. The engineering team should write a brief incident summary of the previous failure and share it with all go/no-go decision-makers before the meeting. Rollback triggers should be set more conservatively than standard -- consider a 1% error rate threshold instead of 2%, and a shorter sustained-duration requirement (3 minutes instead of 5). The support team briefing must address the history: agents will encounter users who are skeptical or frustrated from the previous failure and need explicit guidance on how to respond ("We identified and fixed the issue that caused [X]; here is what changed").

Launch with Hard External Deadline (Conference, Press Embargo, Contractual)

A fixed external deadline fundamentally changes the risk calculus. Scope reduction becomes the primary risk mitigation tool when the date cannot move. Build the checklist with explicit scope tiers: Tier 1 (must ship on this date), Tier 2 (ship if ready), and Tier 3 (defer to next release). The go/no-go meeting must have a scope reduction decision ready -- not just "go or no-go" but "go with Tier 1 only, defer Tier 2, or full go." Legal and compliance items with external deadlines (press embargoes break if you are late; contractual penalties may apply) must be escalated to executive sponsors immediately if they are at risk. Never let a hard external deadline eliminate the rollback plan -- the feature can have an emergency disable mechanism even if the code is "live" for a keynote demo.

Launch Involving a Pricing or Packaging Change

Pricing changes require additional workstreams that a standard feature launch does not. Finance must review all pricing copy for accuracy before publication. Billing system changes must be tested end-to-end in staging, including upgrade flows, downgrade flows, proration calculations, and invoice generation. Customer Success must proactively communicate changes to existing paid customers before the public announcement -- surprising a paying customer with a price change via a general blog post is a significant churn risk. Legal must review pricing page copy for compliance with automatic renewal laws, refund policy obligations, and geographic pricing regulations. The go/no-go criteria must include billing system testing completion as a hard blocker.


Example

Input: "We're launching a new team collaboration feature in our project management SaaS tool next Tuesday. It includes real-time document editing, @mentions with notifications, and a comment threading system. We have about 12,000 daily active users across free and paid tiers. We want to phase the rollout and we're planning to blog about it."

Output:

Launch Checklist: Team Collaboration (Real-Time Editing, Mentions, and Commenting)

Version: 1.0 | Created: [Current Date] | Owner: PM


Launch Overview

| Field | Detail |

|---|---|

| Launch name | Team Collaboration -- Real-Time Editing, @Mentions, and Comment Threading |

| Launch date and time | Tuesday at 10:00 AM PT |

| Launch type | Major feature |

| Target audience | All existing users (free and paid tiers) |

| Rollout strategy | Phased via feature flag: 5% day 1 (Monday), 25% day 2 (Tuesday at launch), 100% by Thursday if no issues |

| Go/no-go decision | Monday at 2:00 PM PT -- Decision maker: VP of Product, with PM, Engineering Lead, Support Lead |

| Post-launch review | Thursday at 2:00 PM PT -- Owner: PM |

| Estimated reach on day 1 | ~600 users (5% of 12,000 DAU) |


Engineering Readiness

Code and Testing
Performance
Security
Infrastructure and Deployment
Observability
Rollback

Engineering readiness sign-off: [Engineering Lead] -- [Date]


Marketing and Communications

Messaging
Content Assets
Social and Paid
Enablement
Internal

Marketing readiness sign-off: [Marketing Lead] -- [Date]


Customer Support Readiness

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.