Prioritization framework

From FerroxLabs/wayland · View interactive version

Prioritization framework is an AI agent skill from the GitHub repository FerroxLabs/wayland. Applies RICE or MoSCoW prioritization frameworks to score and rank a feature list with documented assumptions and stakeholder-ready output. Use when the user asks about feature prioritization, RICE scoring, MoSCoW prioritization, backlog ranking, or deciding what to build next. Do NOT use for produc

How to use this skill

Skill file

Prioritization Framework

When to Use

Use this skill when:

Do NOT use this skill when:


Process

Step 1: Gather the Prioritization Context

Before scoring a single item, collect the inputs that govern every scoring decision. Applying a framework to incomplete context produces scores that feel precise but are misleading.


Step 2: Choose the Right Framework for the Context

RICE and MoSCoW are not interchangeable. Each has a specific context where it performs best. Choosing the wrong framework for the situation is a common mistake that undermines credibility.

Use RICE when:

Use MoSCoW when:

Use RICE + MoSCoW together when:

When neither fits cleanly: The ICE framework (Impact, Confidence, Ease -- a simplified RICE without Reach) is useful when Reach is uniform across items (all features affect all users) or when speed of scoring matters more than precision. ICE Score = Impact x Confidence x Ease, where Ease is the inverse of Effort on a 1-10 scale.


Step 3: Score Each Item -- RICE in Detail

The RICE formula is: (Reach × Impact × Confidence) ÷ Effort

Higher scores indicate higher priority. Scores are only meaningful relative to each other within the same scoring session -- never compare RICE scores across different teams or products.

Reach:

Impact:

Confidence:

Effort:


Step 4: Apply MoSCoW Classification Rigorously

MoSCoW categorization fails in practice because teams lack the discipline to apply the definitions strictly. Use these decision rules:

Must Have:

Should Have:

Could Have:

Won't Have (This Time):


Step 5: Rank, Sort, and Identify Judgment Calls

After scoring, the ranking itself is straightforward, but several analysis steps add significant value:


Step 6: Document Assumptions and Sensitivity Analysis

The scoring rationale is the most valuable artifact of the prioritization process. Without it, the scores are a black box that stakeholders will not trust or remember.


Step 7: Build the Final Recommendation and Capacity Check

The recommendation is the action layer that transforms a scored list into a plan.


Output Format

## Prioritization: [Product/Team Name] -- [Quarter or Release Name]

**Framework:** [RICE / MoSCoW / RICE + MoSCoW]
**Period:** [Start date] to [End date]
**Team capacity (raw):** [X] person-months / [Y] person-sprints
**Team capacity (working, at 75%):** [Z] person-months
**Business goal(s) this period:** [Primary metric: e.g., reduce trial-to-paid conversion drop-off by 15%]
**Reach denominated in:** [Users/month / Accounts / ARR / Support tickets]

---

### RICE Scoring Table

| Rank | Feature | Reach | Impact | Confidence | Effort (pm) | RICE Score | Status |
|------|---------|-------|--------|------------|-------------|------------|--------|
| 1    | [Name]  | [#]   | [#]    | [%]        | [#]         | [Score]    | Build  |
| 2    | [Name]  | [#]   | [#]    | [%]        | [#]         | [Score]    | Build  |
| 3    | [Name]  | [#]   | [#]    | [%]        | [#]         | [Score]    | Build  |
| 4    | [Name]  | [#]   | [#]    | [%]        | [#]         | [Score]    | Defer  |
| 5    | [Name]  | [#]   | [#]    | [%]        | [#]         | [Score]    | Discovery |

*RICE Score = (Reach × Impact × Confidence) ÷ Effort*

---

### Score Rationale

#### [Feature Name] -- RICE Score: [X] (Rank #[N])

- **Reach:** [#] [users/accounts/ARR] per month. Source: [analytics / sales pipeline / support tickets / estimate]. Notes: [any caveats about the reach estimate].
- **Impact:** [#] ([Massive/High/Medium/Low/Minimal]). Rationale: [specific behavioral change or metric movement expected, tied to the business goal]. Why not higher: [explicit reason the next-higher level was not selected].
- **Confidence:** [%]. Evidence basis: [validated user research / product analytics / sales input / hypothesis]. Weakest link: [Reach uncertainty / Impact uncertainty].
- **Effort:** [#] person-months. Basis: [engineering estimate / comparison to [similar feature] / reference class]. Includes: design ([X] weeks), engineering ([X] weeks), QA ([X] weeks).
- **Key assumption:** [The specific assumption that most affects the score. Quantify the sensitivity: "If [assumption] changes from X to Y, the score changes from A to B and the rank moves from #N to #M"].
- **Dependency:** [None / Requires [X] to be completed first].

*(Repeat for each feature)*

---

### MoSCoW Classification Table

| Category | Feature | Rationale | Effort (pm) | Cumulative Effort |
|----------|---------|-----------|-------------|-------------------|
| **Must** | [Name] | [Why it fails the removal test or is non-negotiable] | [#] | [#] |
| **Must** | [Name] | [Why it fails the removal test or is non-negotiable] | [#] | [#] |
| **Should** | [Name] | [Significant value, expected by users, not blocking] | [#] | [#] |
| **Could** | [Name] | [Desirable, low effort, first to cut if time runs short] | [#] | [#] |
| **Won't** | [Name] | [Reason deferred: dependency, data gap, scope, strategy] | [#] | -- |

**Must effort:** [X] pm = [Y]% of working capacity. [Status: within 60% threshold / OVER -- scope negotiation required]
**Must + Should effort:** [X] pm = [Y]% of working capacity.

---

### Ranking Surprises and Judgment Calls

| Feature | Expected Rank | Actual Rank | Gap | Explanation |
|---------|---------------|-------------|-----|-------------|
| [Name]  | [#]           | [#]         | [#] | [Why the framework diverged from intuition -- and whether to adjust] |

**Score clusters (items within 10% of each other):**
- Cluster A: [Feature X] (score [N]) and [Feature Y] (score [N-10]). Tiebreaker recommended: [strategic alignment / dependency unlock / team learning value].

---

### Key Assumptions and Sensitivity

| Feature | Key Assumption | If Assumption Holds | If Assumption Fails | Risk Level |
|---------|----------------|---------------------|---------------------|------------|
| [Name]  | [Assumption]   | Rank #[N], Score [X] | Rank #[M], Score [Y] | [High/Med/Low] |

---

### Recommendation

**Build this period** ([X] pm committed of [Y] pm working capacity):

| Priority | Feature | RICE Rank / MoSCoW | Effort | Primary Justification |
|----------|---------|---------------------|--------|-----------------------|
| 1 | [Name] | #[N] / Must | [X] pm | [One-sentence business justification] |
| 2 | [Name] | #[N] / Must | [X] pm | [One-sentence business justification] |
| 3 | [Name] | #[N] / Should | [X] pm | [One-sentence business justification] |

**Defer:**
- [Feature] -- Reason: [capacity / dependency / insufficient data]
- [Feature] -- Reason: [send to discovery -- Confidence ≤ 50%, need user research before scoring]

**Kill / Remove from backlog:**
- [Feature] -- RICE score [X] at [Y] pm effort. Return on investment does not justify inclusion in any near-term quarter.

**Capacity check:**
- Raw capacity: [X] pm
- Working capacity (75%): [Y] pm
- Committed work: [Z] pm
- Buffer remaining: [W] pm (for bugs, on-call, unplanned work)
- Status: [On budget / Over by X pm -- recommend cutting [feature]]

**Items sent to discovery:**
- [Feature] -- Questions to answer: [What is the actual reach? Does this change the conversion metric or the engagement metric?]
- [Feature] -- Research method recommended: [User interviews / analytics instrumentation / prototype test]

Rules

  1. Never present RICE scores as objective truth. The formula creates the illusion of precision on top of estimates. The value of the exercise is the structured conversation it forces -- alignment on what "impact" means, what "effort" actually includes, and what the business goal is. The number is a discussion anchor, not a verdict.
  1. Impact inflation is the most common failure mode. Defend every score above Medium (1). If a user scores 70% of their features as High (2) or Massive (3), the scores are inflated and the ranking is useless. A Medium score (1) is correct for features that improve the experience for affected users. High (2) should be reserved for features that drive measurable metric movement. Massive (3) should appear at most once or twice in a list of 10 items.
  1. Effort must include all contributors, not just engineering. A feature that requires 3 engineering weeks, 1 design week, and 1 QA week costs 5 person-weeks, not 3. Product managers routinely undercount by omitting design and QA. If the user cannot provide a breakdown, apply a 1.3-1.5x multiplier to engineering-only estimates as a baseline correction.
  1. Confidence must be set at the weakest link. If Reach is validated with analytics but Impact is a hypothesis, the Confidence score is 50% -- not an average. The entire score reflects the quality of the weakest piece of evidence. This prevents a single validated data point from inflating confidence in a largely speculative estimate.
  1. Must items in MoSCoW must not exceed 60% of working capacity. If they do, the release is over-scoped by definition, and the team is constructing a failure condition before the quarter starts. The correct response is to reclassify items with a scope negotiation conversation, not to pad the capacity estimate or compress the effort estimates.
  1. Every Won't item must have a documented rationale. Stakeholders whose requests do not make the cut will accept the outcome if they can see that their request was understood, scored, and explicitly deferred with a reason. A Won't list without rationale reads as dismissal. A Won't list with rationale reads as a managed conversation.
  1. Run a capacity check before finalizing the recommendation. A prioritized list that exceeds working capacity is a fantasy backlog, not a plan. Use 75-80% of raw capacity as the working budget. The remaining 20-25% is absorbed by unplanned work, production incidents, and ceremonies -- it is not available for feature work even if the schedule looks empty.
  1. Flag items requiring discovery rather than forcing a score. An item with Confidence ≤ 50% on both Reach and Impact has two unknowns. Scoring it produces a number with so much uncertainty that it cannot be trusted for ranking. Classify it as "Send to Discovery" and specify the research question that must be answered before it can be scored reliably.
  1. RICE scores are only comparable within a single scoring session using the same definitions. A RICE score of 240 from one team's planning session cannot be compared to a 240 from a different team's session unless both teams used the same units for Reach, the same time window, and the same Effort scale. Cross-session comparisons are invalid.
  1. Sequence by dependencies after scoring by value. RICE and MoSCoW rank items by value, not by build order. After ranking, check the dependency graph. A rank-5 item that is a prerequisite for rank-1, rank-2, and rank-3 items may need to be sequenced first. Dependency-driven sequencing is applied after value-based ranking -- they are separate decisions.
  1. Revisit scores when significant new information arrives. Prioritization is a point-in-time decision based on the information available. A new competitive threat, a large customer churn event, or a change in company strategy can make last quarter's top-ranked item irrelevant. Scores are not permanent -- they are versioned decisions with a timestamp and a context.
  1. For mixed audiences, present MoSCoW to stakeholders and RICE internally. Executives and cross-functional stakeholders respond better to "Must / Should / Could" than to "RICE 480 vs RICE 320." Use RICE internally to derive the ranking, then translate the recommendation into MoSCoW language for the stakeholder presentation. Both views of the same prioritization can coexist in the same document.

Edge Cases

Scores cluster tightly across most of the list

When RICE scores cluster within 10-15% of each other, the framework has revealed genuine uncertainty rather than a clear ranking. This is important information -- it means the data does not differentiate well between these items, and a purely quantitative decision would be arbitrary. Handle this by: (1) introducing a secondary ranking criterion such as strategic alignment with the company's stated annual priorities, dependency unlock value (does this item unblock other high-value work?), or team learning value (does this build a capability we need for future quarters?); (2) presenting the cluster to stakeholders explicitly, noting that these items are effectively tied, and facilitating a structured discussion rather than auto-ranking; and (3) checking whether the Confidence scores have been inflated uniformly -- if every item has 80% confidence, the confidence scores are not doing their differentiating work.

A senior stakeholder is pushing for a low-scoring item

This is the most politically sensitive scenario. The correct approach is to present the RICE score with full transparency and ask: "Which assumption in this score do you believe should change?" If the stakeholder has information about Reach (e.g., this feature unlocks a market segment of 5,000 accounts that the analytics do not capture) or Impact (e.g., this is a blocker in 40% of enterprise sales conversations per the VP of Sales), update the score with that information and show the revised rank. If no new information is introduced, the score stands and the stakeholder must explicitly exercise their authority to override the ranking -- at which point that override should be documented as a stakeholder decision, not a prioritization outcome. This protects the team from the implication that the framework failed.

Technical debt, refactoring, and infrastructure work

RICE was designed for user-facing features and does not score infrastructure naturally because there is no direct user Reach or Impact. Use a modified approach: treat the cost of NOT doing the work as the score input. Estimate the current velocity drag (how many person-hours per sprint are lost to workarounds caused by the tech debt), the outage probability over the planning period and its user impact, or the scaling limitation (at what growth rate does the current architecture become a bottleneck?). Translate these into RICE-equivalent numbers: Reach = users affected by the performance or stability issue, Impact = severity of that degradation, Confidence = engineering team's assessment. Alternatively, allocate a fixed 20-25% of capacity to platform/debt work outside of the RICE ranking -- this is the approach used by teams that have found that competing technical debt against product features in a single RICE session consistently underscores the debt, leading to compounding architectural problems.

A single large customer is requesting a specific feature

The standard RICE formula scores this poorly because Reach = 1 account. The correct adjustment is to redenominate Reach in revenue terms: Reach = ARR at risk (if the customer will churn without this feature) or ARR opportunity (if this feature enables upsell or a new contract). Impact remains on the standard scale but reflects the revenue movement per dollar of ARR affected. Confidence should reflect how firm the customer's commitment is -- a verbal request from a customer success call is 50% confidence; a written requirement in a renewal negotiation is 80-100%. Always document the second-order risk: building a feature for one customer creates product complexity and ongoing maintenance cost that benefits only that customer. Include a note on whether this feature is generalizable (could 20% of customers use this with minor changes?) or truly one-off (bespoke integration with their internal system). The latter should require a higher RICE threshold before it qualifies for the roadmap.

Regulatory or compliance requirements with hard deadlines

These are Must items by definition -- they are not subject to scoring because the consequence of missing them is legal, financial, or safety risk that no product prioritization can override. Score them with RICE only for resource allocation purposes (how much capacity do they consume?) and to establish their relative implementation sequence if multiple compliance items are due in the same period. In MoSCoW, compliance and contractual items are always Must. The practical implication is that they reduce the working capacity available for discretionary work: if compliance items consume 2 of 6 person-months, the RICE scoring for discretionary features should be run against a 4 pm budget, not 6 pm. Document this capacity reduction explicitly so stakeholders understand why the discretionary roadmap looks smaller than expected.

Feature requests that arrive mid-quarter after the plan is set

A common failure mode is to re-prioritize every time a new request arrives, which destabilizes the team's focus. Establish a threshold rule: a new item should only displace a committed item if its RICE score is at least 25% higher than the lowest-ranked committed item, or if it represents a contractual obligation or severity-1 production risk. Everything below that threshold goes into the next planning cycle. Document incoming requests in a running log with the date received, the source, and the initial estimate of Reach and Impact. This log becomes a valuable input at the next planning session and shows stakeholders that requests are being tracked even when not immediately acted on.

The user has no data -- everything is gut feel

When Reach and Impact are pure estimates and the user has no analytics, support data, or research to draw on, the correct action is to set Confidence at 30-50% across the board and use the relative ranking rather than absolute scores. The RICE scores will all be low due to uniform low confidence, but the relative ordering still provides value. More importantly, the scoring exercise reveals exactly what data would improve confidence: "We scored CSV Export at 50% confidence because we do not know how many users are currently exporting data manually. Adding an analytics event to track spreadsheet exports would resolve this in two weeks." The prioritization output should include a "data collection actions" section that specifies what to measure before the next scoring session. This turns a data-poor first session into a progressively improving data practice.

Comparing features with very different time horizons

Some features have immediate impact (a bug fix, a checkout UX improvement) while others have compounding, long-term value (a platform capability, an API that enables a developer ecosystem). RICE with a 30-day Reach window systematically underscores long-term investments because the Reach in the first 30 days is small. Handle this by using a consistent time horizon (one quarter is standard) but adding a separate "strategic multiplier" column for items with acknowledged long-term compounding value. Document this multiplier and its rationale separately from the RICE score so that the adjustment is transparent rather than hidden inside inflated Reach numbers.


Example

Input from user: "We're a B2B SaaS team building project management software. We have 4 engineers, one designer, and a QA engineer. We're planning Q3. Business goal is reducing trial-to-paid conversion -- currently 12%, we want to get to 18%. Here are our 7 candidate features:

  1. Onboarding checklist for new trial users
  2. Bulk task import via CSV
  3. Gantt chart view
  4. Email digest notifications
  5. Custom field types (beyond text/date/number)
  6. Two-factor authentication (2FA)
  7. Integrations marketplace (Slack, Jira, Google Drive)"

Output:

Prioritization: Q3 Planning -- [Company] Project Management

Framework: RICE (primary) + MoSCoW (stakeholder presentation layer)

Period: Q3 (13 weeks)

Team composition: 4 engineers + 1 designer + 1 QA

Raw capacity: 6 people × 3 months = 18 person-months

Working capacity (75%): ~13.5 person-months

Business goal: Increase trial-to-paid conversion from 12% to 18% (+6 percentage points)

Reach denominated in: Trial users/month (current trial volume: ~800/month)

Note on capacity: Designer and QA are shared resources -- not all features require equal design/QA investment. Effort estimates reflect full team cost, not engineering alone.


RICE Scoring Table

| Rank | Feature | Reach | Impact | Conf. | Effort (pm) | RICE Score | Status |

|------|---------|-------|--------|-------|-------------|------------|--------|

| 1 | Onboarding checklist | 800 | 2 | 100% | 1.5 | 1,067 | Build |

| 2 | Email digest notifications | 600 | 1 | 80% | 1.0 | 480 | Build |

| 3 | Bulk task import (CSV) | 400 | 2 | 80% | 1.0 | 640 | Build |

| 4 | Two-factor authentication | 200 | 1 | 100% | 0.5 | 400 | Build |

| 5 | Custom field types | 300 | 1 | 50% | 3.0 | 50 | Defer |

| 6 | Gantt chart view | 500 | 2 | 50% | 4.0 | 125 | Defer → Discovery |

| 7 | Integrations marketplace | 700 | 3 | 30% | 6.0 | 105 | Defer → Discovery |

RICE Score = (Reach × Impact × Confidence) ÷ Effort


Score Rationale

Onboarding Checklist -- RICE Score: 1,067 (Rank #1)

Bulk Task Import (CSV) -- RICE Score: 640 (Rank #2, listed #3 in original table)

Note: After sorting, CSV Import ranks #2 despite appearing third in the table above due to rounding. Confirm sort.


Email Digest Notifications -- RICE Score: 480 (Rank #3)

Two-Factor Authentication (2FA) -- RICE Score: 400 (Rank #4)

Gantt Chart View -- RICE Score: 125 (Rank #6, defer to discovery)

Integrations Marketplace (Slack, Jira, Google Drive) -- RICE Score: 105 (Rank #7, defer to discovery)

MoSCoW Classification (Stakeholder Presentation View)

| Category | Feature | Rationale | Effort (pm) | Cumulative |

|----------|---------|-----------|-------------|------------|

| Must | Onboarding checklist | Directly addresses primary stated reason for trial churn (38% exit surveys). Central to Q3 conversion goal. | 1.5 | 1.5 |

| Must | 2FA | Blocks conversion in 12 documented enterprise deals. Low effort, high confidence, contractual-adjacent. | 0.5 | 2.0 |

| Should | Bulk task import (CSV) | Removes setup barrier for 50% of trials migrating from spreadsheets. High effort-efficiency. | 1.0 | 3.0 |

| Should | Email digest notifications | Re-engages disengaged trial users; addresses silent churn within the trial window. | 1.0 | 4.0 |

| Could | Custom field types | Nice to have for power users but no validated link to trial conversion. | 3.0 | 7.0 |

| Won't | Gantt chart view | High effort (4 pm), low confidence, hidden dependency. Requires discovery sprint before Q4 consideration. | 4.0 | -- |

| Won't | Integrations marketplace | Low confidence that this drives trial conversion. Premature before users reach integration-seeking behavior. | 6.0 | -- |

Must effort: 2.0 pm = 15% of working capacity (13.5 pm). Well within 60% threshold. ✓

Must + Should effort: 4.0 pm = 30% of working capacity. Healthy.


Ranking Surprises and Judgment Calls

| Feature | Expected Rank | Actual Rank | Gap | Explanation |

|---------|---------------|-------------|-----|-------------|

| Gantt chart | #2 (often requested) | #6 | -4 | High effort and low confidence deflate the score significantly. The survey data driving Reach is from a self-selected sample. Confidence should be raised before the rank improves. |

| Integrations marketplace | #1 (exec favorite) | #7 | -6 | 30% confidence is the primary driver. The feature is desirable in the abstract but unvalidated as a conversion driver. Present this to stakeholders with the discovery recommendation. |

| 2FA | #6 (rarely mentioned) | #4 | +2 | Low reach but 100% confidence and minimal effort. Removing a documented sales blocker at 0.5 pm cost is high-efficiency work. |

Score clusters:


Key Assumptions and Sensitivity

| Feature | Key Assumption | If Assumption Holds | If Assumption Fails | Risk |

|---------|----------------|---------------------|---------------------|------|

| Onboarding checklist | 38% of churned users would convert with guidance | Score 1,067, Rank #1 | Score 533 (lift is 3pp not 6pp), still Rank #1 | Low |

| CSV import | 50% of trials are spreadsheet migrators | Score 640, Rank #2 | Score 384 (30% = 240 reach), Rank #3 | Medium |

| Gantt chart | Gantt demand correlates with conversion | Score 125, Rank #6 | Score remains low; discovery sprint confirms or denies | High |


Recommendation

Build in Q3 (4.0 pm committed of 13.5 pm working capacity):

| Priority | Feature | Rank | Effort | Justification |

|----------|---------|------|--------|---------------|

| 1 | Onboarding checklist | #1 | 1.5 pm | Directly addresses top stated churn driver; 100% confidence; central to Q3 conversion goal |

| 2 | Bulk task import (CSV) | #2 | 1.0 pm | Removes primary setup barrier for ~50% of trial users; low effort relative to impact |

| 3 | Email digest notifications | #3 | 1.0 pm | Re-engages disengaged users; proven SaaS lever with industry benchmarks |

| 4 | Two-factor authentication | #4 | 0.5 pm | Unblocks 12 documented enterprise deals; minimal effort |

Defer to Q4:

Send to discovery (before Q4 scoring):

Capacity check:

The large buffer is intentional. Q3's primary goal is conversion improvement, not feature volume. The 4 committed features are high-confidence, direct-impact work. The remaining capacity absorbs: production bugs and incidents (historically 2-3 pm/quarter), onboarding checklist iteration based on early data (expect 1 pm of follow-on work), and potential emergency compliance work. This is not under-planning -- it is the correct capacity allocation for a team whose goal is measurable metric improvement rather than feature throughput.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.