Prd writing

From FerroxLabs/wayland · View interactive version

Prd writing is an AI agent skill from the GitHub repository FerroxLabs/wayland. Creates product requirements documents (PRDs) with problem statement, user stories, acceptance criteria, out-of-scope definition, and success metrics using standard PRD format. Use when the user asks about PRDs, product requirements, feature requirements, writing requirements documents, or product s

How to use this skill

Skill file

PRD Writing

When to Use

Use this skill when:

Do NOT use this skill when:


Process

Step 1: Establish the Problem Statement Before Anything Else

The problem statement is the load-bearing wall of the PRD. Every decision about scope, priority, and success criteria must trace back to it. A weak problem statement is the single most common cause of PRDs that confuse more than they align.

Step 2: Define Goals and Success Metrics with Baselines

Metrics without baselines are decorative. Baselines without targets are observations. This section must produce a measurable contract between the product team and the business.

Step 3: Define the Target User with Behavioral Specificity

Generic personas do not help engineers make trade-offs. This section must give the team enough specificity to resolve ambiguous edge cases without escalating.

Step 4: Write User Stories with Unambiguous Acceptance Criteria

This is the technical core of the PRD. Acceptance criteria are the contract between product and engineering -- they define done, not design. They must be testable by a QA engineer who has never spoken to the PM.

Step 5: Define Out of Scope with Explicit Rationale

Out of scope is not a dumping ground for "things we did not think about." It is a deliberate set of decisions that prevent scope creep, manage stakeholder expectations, and preserve engineering focus.

Step 6: Document Assumptions, Risks, and Dependencies

This section turns the PRD from a wishlist into a risk-managed plan. Every PRD contains hidden assumptions -- this step makes them visible before they cause damage.

Step 7: Specify the Release Plan and Rollback Strategy

Shipping is not the end state -- controlled rollout with defined reversal criteria is. This section operationalizes the launch.


Output Format

## PRD: [Feature or Initiative Name]

### Metadata
| Field | Value |
|-------|-------|
| **Author** | [Name, Role] |
| **Contributors** | [Names and roles: Engineering Lead, Designer, Data Analyst] |
| **Date created** | [YYYY-MM-DD] |
| **Last updated** | [YYYY-MM-DD] |
| **Status** | Draft / In Review / Approved / Shipped |
| **Target release** | [Version number or date range] |
| **Stakeholders** | [Names, roles, and approval authority: Approver / Reviewer / Informed] |
| **Related documents** | [Link to tech spec, design file, discovery doc, competitive analysis] |

---

### Problem Statement

**Who:** [Specific user segment -- not "users." Name the segment, tier, and context.]
**Problem:** [Observable pain point in behavioral terms -- what they cannot do or must do the wrong way.]
**Evidence:** [Quantitative: X tickets/month, Y% churn citing this. Qualitative: user interview themes, usability findings. Proxy: competitor feature, industry benchmark.]
**Cost of inaction:** [Business impact -- revenue at risk, support cost, hours lost per week, competitive displacement risk.]
**Current workaround:** [What users do today instead -- reveals how painful the problem actually is.]

---

### Goal and Success Metrics

**Goal:** [One sentence: Verb + what changes + for whom + why it matters to the business.]

| Metric | Type | Baseline | Target | Measurement Method | Window |
|--------|------|----------|--------|--------------------|--------|
| [Primary metric] | Primary | [Current value + date] | [Target + justification] | [Tool/query/dashboard] | [30/60/90 days post-launch] |
| [Secondary metric 1] | Secondary | [Current] | [Target] | [Method] | [Window] |
| [Secondary metric 2] | Secondary | [Current] | [Target] | [Method] | [Window] |
| [Guardrail metric 1] | Guardrail | [Current] | Must not degrade beyond [threshold] | [Method] | Ongoing |
| [Guardrail metric 2] | Guardrail | [Current] | Must not degrade beyond [threshold] | [Method] | Ongoing |

---

### Target User

| Attribute | Detail |
|-----------|--------|
| **Segment** | [Named segment with tier, context, and size if known] |
| **Current behavior** | [Step-by-step: what they do today to accomplish this goal -- the workaround workflow] |
| **Desired behavior** | [Observable action after this feature exists -- not a feeling, an action] |
| **Context of use** | [Device, environment, frequency, urgency level] |
| **Out-of-scope users** | [Who is NOT the target for this initiative and why] |

*If multiple user types interact with this feature, add a row per user type.*

---

### User Stories

#### Theme 1: [User Journey Phase or Functional Area]

**Story 1.1 [P0]:** As a [specific user type], I want to [specific action], so that [specific, concrete benefit].

Acceptance Criteria:
- [ ] AC1: [Testable condition -- Given/When/Then or flat statement. Specific enough for a QA engineer to write a test without asking the PM.]
- [ ] AC2: [Performance condition: completes within X seconds / handles up to Y records]
- [ ] AC3: [Error state: when X fails, user sees Y and can take action Z]
- [ ] AC4: [Empty state or edge state: when no data exists, system displays Z]
- [ ] AC5: [Non-functional: accessible at WCAG 2.1 AA / works on mobile viewport / UTF-8 encoded]

**Story 1.2 [P1]:** As a [user type], I want to [action], so that [benefit].

Acceptance Criteria:
- [ ] AC1: [Testable condition]
- [ ] AC2: [Testable condition]
- [ ] AC3: [Error handling]

#### Theme 2: [User Journey Phase or Functional Area]

**Story 2.1 [P0]:** As a [user type], I want to [action], so that [benefit].

Acceptance Criteria:
- [ ] AC1: [Testable condition]
- [ ] AC2: [Testable condition]

---

### Out of Scope

| Exclusion | Category | Reason |
|-----------|----------|--------|
| [Specific feature or use case] | Deferred | [Named phase or initiative it belongs to] |
| [Platform or user segment] | Deliberately excluded | [Trade-off rationale] |
| [Adjacent capability] | Out of product scope | [Which team or system owns it] |
| [Unclear requirement] | Not yet known | [What research or data is needed to scope it] |

---

### Assumptions, Risks, and Dependencies

#### Assumptions
| Assumption | Type | Validation Method | Owner | Status |
|------------|------|------------------|-------|--------|
| [What must be true] | User / Technical / Business | [How we will verify before/after launch] | [Who validates] | [Validated / Pending / At risk] |

#### Risks
| Risk | Category | Likelihood | Impact | Mitigation | Contingency |
|------|----------|-----------|--------|------------|-------------|
| [Risk description] | Technical / Adoption / Regulatory / Dependency | H/M/L | H/M/L | [What we do to reduce probability] | [What we do if it materializes] |

#### Dependencies
| Dependency | Description | Owner Team | Required By | Status | Impact if Delayed |
|-----------|-------------|-----------|-------------|--------|------------------|
| [System or team] | [What specifically is needed] | [Team name] | [Date] | [On track / At risk / Blocked] | [Impact on launch timeline or feature quality] |

---

### Release Plan

| Phase | Rollout | Audience | Gate Conditions to Advance | Duration |
|-------|---------|----------|---------------------------|----------|
| Phase 1 -- Canary | 1--5% | [Internal users or beta cohort] | Error rate < 0.5%, p95 latency within threshold | 1 week |
| Phase 2 -- Limited | 10--25% | [Specific segment or region] | Primary metric directionally positive, no guardrail breaches | 2 weeks |
| Phase 3 -- General | 100% | All eligible users | All gate conditions met | -- |

**Feature flag:** [Flag name], Owner: [Name], Default: Off, Kill switch: [Procedure]

**Rollback triggers:**
- Error rate exceeds [X]% sustained over [Y] minutes
- [Guardrail metric] degrades beyond [threshold]
- [Other observable condition]

**Rollback procedure:** [Specific steps -- who does what, in what order, with what notification chain]

**Post-launch review date:** [Date, approximately 30 days after Phase 3 launch]

---

### Open Questions

| Question | Owner | Resolution Needed By | Status |
|----------|-------|---------------------|--------|
| [Unresolved question that blocks a decision in this PRD] | [PM / Eng / Design / Legal] | [Date] | [Open / In progress / Resolved] |

Rules

  1. Never write the PRD before the problem statement is locked. If the user skips straight to "here are the features I want," pull them back. Ask: what problem are these features solving, who has it, and what is the evidence? A PRD that starts with solutions is a feature list dressed up as a requirements document -- it will be overscoped, under-prioritized, and impossible to measure.
  1. Every user story must have acceptance criteria that pass the QA stranger test. Can a QA engineer who has never spoken to the PM read the AC and write a test case? If not, the AC is too vague. Common failures: "the feature works correctly" (not testable), "the UI is intuitive" (not testable), "performance is acceptable" (not testable without a number). Replace every subjective criterion with an observable, measurable condition.
  1. Never allow a success metric without a documented baseline. A target of "increase export adoption to 15%" is meaningless if today's adoption is 0% (new feature baseline) versus 8% (existing feature with room to grow). Baselines must include the measurement date -- metrics drift over time and a stale baseline is as misleading as no baseline.
  1. The out-of-scope table must be populated for every PRD, including small ones. The smaller the feature, the more critical the out-of-scope table -- small features attract the most scope creep because they appear "almost done" and stakeholders feel comfortable adding "one more thing." Explicitly excluding a single adjacent capability prevents weeks of renegotiation.
  1. Prioritization must have rationale, not just labels. A P0 label without a reason is a guess. The rationale must answer: why is this required for launch (not just desirable)? Acceptable P0 rationale: "without this, the feature provides no value" or "without this, the feature violates a compliance requirement." Unacceptable P0 rationale: "the stakeholder wants it" or "it seems important."
  1. Guardrail metrics must be specified before the PRD is approved, not after launch. If the team has not agreed on what "unacceptable degradation" looks like before shipping, there will be no agreement when it happens -- only politics. Guardrails should be set at the current baseline with a tolerance band: a p95 API response time baseline of 1.8 seconds might have a guardrail threshold of 3.0 seconds. Never use "must not increase" without a number.
  1. Dependencies must be verified, not assumed. Every dependency listed in the PRD must have been confirmed with the owning team before the PRD is approved. A dependency that is listed but unconfirmed is an assumption -- move it to the assumptions table and flag it as the highest-risk assumption. An unconfirmed dependency is the most common cause of PRD-to-sprint failure.
  1. The PRD must not contain implementation details. Specifying database schema, API endpoint design, class names, or code architecture in a PRD contaminates the product requirements with technical decisions that belong in the engineering spec. The PRD answers what and why. The technical spec answers how. Mixing them creates a document that is authoritative for neither audience. Exception: non-functional requirements (performance thresholds, security requirements, accessibility standards) are legitimate PRD content because they constrain what counts as done.
  1. Every assumption must have a named owner and a validation method. "We assume users will adopt this" is an unowned, unvalidated assumption -- it is a risk in disguise. The assumption must specify: what specifically must be true, who is responsible for validating it, how they will validate it (user research, A/B test, data pull), and by when. Assumptions without owners do not get validated.
  1. The PRD must have a review and approval process, not just a status field. A PRD marked "Approved" that no one actually approved is worse than a draft -- it creates false confidence. The metadata must list specific approvers (not just stakeholders), and each approver must have an explicit scope: the engineering lead approves technical feasibility, the design lead approves UX scope, the PM lead or head of product approves priority and business value. If the user's context does not include a formal approval process, note the review date and the names of people who provided input.
  1. Out-of-scope items must trace to either a future initiative or a deliberate exclusion -- never just disappear. Every item excluded from this PRD should either appear in a named future phase (Phase 2 of this initiative), link to another tracked initiative, or be documented as a deliberate "will not build" decision with the rationale. "We might do this later" is not a disposition -- it creates a graveyard of half-acknowledged requirements that resurface at every planning cycle.
  1. Do not confuse outputs with outcomes in the success metrics table. "Ship the export feature by Q2" is an output. "Reduce export-related support tickets by 75% within 60 days of launch" is an outcome. PRD success metrics must be outcomes. If the user proposes output-based metrics, reframe them into outcome-based equivalents and explain why the distinction matters for evaluating whether the initiative delivered value.

Edge Cases

Internal Tool or Operations Feature

When the "user" is an internal team member -- a support agent, ops analyst, finance manager, or sales rep -- the problem statement changes shape. Replace user-facing impact language with operational cost language: hours per week spent on the manual task, error rate of the current process, number of people performing the workaround, and the cost-per-error if the process fails. Success metrics focus on efficiency gains (time-on-task reduction, error rate reduction, throughput increase) rather than adoption curves. Acceptance criteria must account for the internal user's workflow context -- they may be using the tool in a high-pressure, multitasking environment where error recovery and confirmation states matter more than for a deliberate end-user feature. The stakeholder map looks different: the sponsor is typically the team manager or VP of the internal function, not a product owner, and their approval carries specific operational authority.

Regulatory or Compliance-Driven Requirement

The "problem" is non-compliance, and the problem statement must name the specific regulation, the specific requirement within it, and the specific gap in the current product. For example: "GDPR Article 17 requires the ability for EU data subjects to request erasure of all personal data. Current product has no deletion workflow -- data is retained indefinitely. Regulatory deadline: [date]." Acceptance criteria must map one-to-one with regulatory checkboxes -- vague ACs are a compliance liability. The out-of-scope table must explicitly state which parts of the regulation are covered by this PRD and which are addressed by other initiatives or already compliant. Include a legal review dependency with a named legal contact and a required sign-off before launch. The rollback plan must address the regulatory implication of reverting -- in some cases, a feature cannot be rolled back once users have exercised a right.

Feature With No Prior Adoption Baseline (Net New)

When there is no historical baseline for the primary metric (because the feature does not exist yet), use a proxy-based baseline approach. For adoption: use adoption rates of the most similar feature in the product as a benchmark. For support deflection: use the incoming ticket volume as the pre-launch baseline. For task completion: use the time-and-error-rate of the current workaround workflow as the baseline. Document the proxy clearly -- "baseline is the adoption rate of the CSV import feature (the closest comparable, at 18% of eligible users within 60 days of launch)." Set targets relative to the proxy rather than absolute guesses. Flag this explicitly so stakeholders understand the benchmark is approximate.

Multi-Team or Multi-Product Initiative

When the initiative spans more than one engineering team, product area, or platform, a single PRD will be incomplete and will create ownership ambiguity. The recommended structure is: one parent PRD that defines the shared problem statement, shared success metrics, and cross-team dependencies, plus one child PRD per team or product area that defines that team's specific scope, stories, and release plan. The parent PRD includes a RACI table -- Responsible, Accountable, Consulted, Informed -- for each functional area and for each key decision (go/no-go for each phase, rollback decisions, scope changes). Without explicit ownership, multi-team PRDs silently fail when one team's dependency slips -- each team assumes the other is handling the coordination.

Exploratory or Research-Phase Initiative

When the scope of a feature is genuinely unknown because the product team has not yet done user research or validated the problem, a standard PRD is premature. Instead, write a "discovery PRD" -- a lighter artifact that documents: the business question being explored (not the solution), the research method (user interviews, prototype testing, data analysis), the sample size and timeline for the research, the specific decisions the research will inform, and the threshold of evidence required to proceed to a full PRD. User stories are replaced with research tasks. Success criteria are about learning milestones, not shipped features. The discovery PRD closes with a go/no-go framework: what evidence would cause the team to proceed, what evidence would cause the team to pivot, and what evidence would cause the team to stop. This prevents "we learned something interesting but different" from indefinitely extending the discovery phase without a decision.

Highly Technical Feature With No Direct User Interface

For features like API rate limiting, background job optimization, webhook reliability improvements, or caching layer upgrades, the "user" is typically a developer, an integration partner, or the system itself. The problem statement should quantify the technical pain in developer experience terms: P99 API latency degraded from 200ms to 4 seconds under load, causing 12% of partner integrations to fail silently. User stories take the form of developer tasks and system behavior requirements. Acceptance criteria are primarily performance benchmarks, error rate thresholds, and observability requirements (the system must emit the correct logs and metrics to detect a regression). Success metrics include developer experience proxies: integration failure rate, developer support ticket volume about the API, SDK adoption rate. Guardrail metrics are more critical here than in user-facing features -- a background infrastructure change can silently degrade user-facing behavior in ways that are invisible until measured.

Internationalization or Localization Scope

When a feature must be localized for one or more languages or regions, localization scope is one of the most commonly under-specified areas in PRDs -- leading to last-minute scope creep, delayed launches, or incomplete localizations. The PRD must explicitly state: which locales are in scope for launch (list them specifically: en-US, fr-FR, de-DE), which locales are deferred, the character encoding requirements (UTF-8 in most cases but critical for CJK character sets), any locale-specific formatting requirements (date formats, currency symbols, number separators, RTL layout for Arabic or Hebrew), and whether content is user-generated (requiring a different localization strategy than static UI copy). The dependency table must include the localization team or vendor, the string freeze date (the date after which no new UI copy will be added to the launch scope), and the review process for translated content.


Example

Input: "I need a PRD for a bulk CSV export feature on our B2B analytics dashboard. Power users have been requesting it. We get about 20 support tickets a month about this, and we lost two enterprise accounts recently who cited data export limitations in their churn survey."

Output:


PRD: Bulk CSV Data Export

Metadata

| Field | Value |

|-------|-------|

| Author | [PM Name], Product Manager -- Analytics |

| Contributors | [Eng Lead], [Designer], [Data Analyst] |

| Date created | 2025-01-15 |

| Last updated | 2025-01-15 |

| Status | Draft |

| Target release | Q1 2025 (estimated late March) |

| Stakeholders | [VP Product] -- Approver; [Head of Engineering] -- Approver (feasibility); [Customer Success Lead] -- Reviewer; [Legal] -- Reviewer (data handling) |

| Related documents | Dashboard technical spec v2.3, Data retention policy, GDPR data handling guidelines |


Problem Statement

Who: Power users of the B2B analytics dashboard -- primarily data analysts and marketing managers at enterprise accounts (100+ seats) who rely on the dashboard for weekly or monthly reporting cycles.

Problem: Users cannot export dashboard data for offline analysis, executive reporting, or integration with external tools (Tableau, Google Sheets, Excel, internal BI systems). They are locked into consuming data exclusively through the dashboard UI.

Evidence: 20 support tickets per month requesting export capability (the highest-volume feature request by ticket count for the past three months). Two enterprise accounts cited "inability to get data out of the platform" as a primary reason for churn in exit surveys. Sales team reports that export capability is raised as a requirement in approximately 40% of enterprise sales conversations.

Cost of inaction: At an average enterprise ACV of $45,000, the two churned accounts represent $90,000 ARR lost. If export limitations are a factor in 40% of sales conversations and the team estimates 10% of those deals stall due to this gap, the pipeline impact is approximately $180,000 in potential ARR per quarter. Support cost at 20 tickets/month at an estimated $75 per tier-2 ticket is $1,500/month ($18,000/year) in operational cost.

Current workaround: Users ask their data analyst or the customer success team to run raw data queries and deliver results via email. This creates 24--72 hour delays, depends on analyst availability, and produces inconsistently formatted files. Some users have requested API access as a workaround -- a technically heavier solution than a UI export feature.


Goal and Success Metrics

Goal: Enable analytics dashboard users to self-serve CSV exports of any dashboard view, reducing support burden, removing a churn driver, and eliminating the analyst-as-data-pipeline workaround.

| Metric | Type | Baseline | Target | Measurement Method | Window |

|--------|------|----------|--------|--------------------|--------|

| Export-related support tickets | Primary | 20/month (Jan 2025) | ≤ 5/month | Zendesk tag: "export-request" | 60 days post-full launch |

| Export feature adoption (% of eligible DAU who use export ≥1x per week) | Secondary | 0% (feature does not exist) | ≥ 15% | Product analytics (Amplitude) | 30 days post-full launch |

| Average exports per active exporter per week | Secondary | 0 | ≥ 2 | Amplitude | 60 days |

| Dashboard p95 page load time | Guardrail | 2.1 seconds (Jan 2025) | Must not exceed 2.8 seconds | Datadog APM | Ongoing |

| API error rate (dashboard endpoint) | Guardrail | 0.3% (Jan 2025) | Must not exceed 0.8% | Datadog | Ongoing |


Target User

| Attribute | Detail |

|-----------|--------|

| Segment | Data analysts and marketing managers at enterprise accounts (100+ seats). Estimated 1,200 eligible users across 80 enterprise accounts. |

| Current behavior | User identifies data they need → emails customer success or internal analyst → waits 24--72 hours → receives unformatted CSV via email → manually reformats for use in Excel/Google Sheets/Tableau. |

| Desired behavior | User identifies data they need in the dashboard → clicks Export → selects date range → downloads a correctly formatted CSV within 30 seconds -- no email, no waiting, no reformatting. |

| Context of use | Desktop browser (Chrome/Firefox/Safari), used during business hours, weekly or monthly reporting cadence. Export is a deliberate, task-completing action -- not a real-time streaming need. |

| Out-of-scope users | Free-tier users (cost and abuse risk); mobile users (lower demand, export on mobile introduces UX complexity deferred to Phase 2); API users (they have programmatic access; this PRD covers UI export only). |


User Stories

Theme 1: Export Initiation

Story 1.1 [P0]: As a data analyst, I want to export the current dashboard view as a CSV file, so that I can analyze the data in my preferred analytics tool without waiting for manual data extraction.

Acceptance Criteria:

Story 1.2 [P0]: As a data analyst, I want the exported CSV to include all columns visible in the current dashboard view with headers matching the dashboard labels, so that I do not need to manually rename columns after downloading.

Acceptance Criteria:

Theme 2: Date Range Selection

Story 2.1 [P1]: As a marketing manager, I want to select a custom date range before exporting, so that I can retrieve data for a specific reporting period without modifying the live dashboard view.

Acceptance Criteria:

Theme 3: Permissions and Access Control

Story 3.1 [P0]: As an account administrator, I want export capability to respect the existing role-based access control settings, so that users cannot export data that their role does not permit them to view.

Acceptance Criteria:

Theme 4: Error Handling and Empty States

Story 4.1 [P1]: As a data analyst, I want clear feedback when my export cannot be completed, so that I can take appropriate action without contacting support.

Acceptance Criteria:


Out of Scope

| Exclusion | Category | Reason |

|-----------|----------|--------|

| PDF export | Deferred | Requested by 3 tickets/month (low demand). Requires significant rendering work. Targeted for Phase 2 post-adoption validation. |

| Scheduled / automated exports (email cadence, Slack delivery) | Deferred | Requires background job infrastructure and notification service integration. Separate initiative -- "Automated Reporting." ETA: Q3 2025. |

| Excel (.xlsx) export format | Deferred | UTF-8 CSV opens correctly in Excel. Native .xlsx requested by 4 tickets/month. Deferred until adoption data justifies the additional format complexity. |

| Export of raw event-level data | Deliberately excluded | Raw event tables can contain hundreds of millions of rows. Performance risk is unacceptable in this PRD's scope. Scoped to aggregated dashboard views only. Raw data access is addressed through the Data API initiative. |

| Mobile (iOS/Android) export | Deferred | Export on mobile introduces download manager complexity. Mobile DAU is 8% of total. Deferred to Phase 2 after desktop adoption is validated. |

| Free-tier user access to export | Deliberately excluded | Export is positioned as a paid-tier differentiator. Free-tier users see a "Upgrade to export" prompt instead of the export button. |

| Multi-dashboard batch export | Not yet known | Insufficient data on whether users want cross-dashboard aggregated exports. Requires UX research before scoping. |


Assumptions, Risks, and Dependencies

Assumptions

| Assumption | Type | Validation Method | Owner | Status |

|------------|------|------------------|-------|--------|

| The export backend can generate 100K-row CSVs within 30 seconds on current infrastructure | Technical | Load test with representative query patterns before Phase 1 launch | Engineering Lead | Pending |

| Users will adopt self-serve export rather than continuing to email customer success | User | Monitor CS export request tickets at 30 days post-launch; target < 5/month | Customer Success Lead | Pending |

| UTF-8 CSV is sufficient for the majority of users; specialized format requests are a minority | User | Support ticket analysis (confirmed: 3 xlsx requests/month vs. 20 generic export requests) | PM | Validated |

| Row-level security currently applied in the dashboard query layer can be reused for exports | Technical | Engineering Lead to confirm before PRD approval | Engineering Lead | Pending |

Risks

| Risk | Category | Likelihood | Impact | Mitigation | Contingency |

|------|----------|-----------|--------|------------|-------------|

| Large export queries degrade dashboard performance for other users | Technical | Medium | High | Implement query queuing and resource limits; run large exports in a separate worker pool | Kill switch to disable exports > 50K rows; revert to email-only for large exports |

| Users attempt to export data they are not authorized to view via direct API calls | Technical / Security | Low | High | Implement auth checks at export API layer (not just UI layer); include in security review | Immediate rollback of feature flag if unauthorized access is detected |

| Customer success team continues to receive manual export requests from habit, masking true adoption | Adoption | Medium | Medium | Proactive in-app announcement + CS team training on directing users to self-serve export | Adjust adoption target interpretation at 30-day review if CS request volume does not drop proportionally |

| Enterprise account data volume exceeds assumed 100K row limit, causing timeouts | Technical | Low | Medium | Implement graceful fallback to email delivery at 100K row threshold | Increase threshold if P99 latency data shows headroom; escalate to Data API team for large accounts |

Dependencies

| Dependency | Description | Owner Team | Required By | Status | Impact if Delayed |

|-----------|-------------|-----------|-------------|--------|------------------|

| Dashboard query service | Export reuses the existing query execution layer; requires confirmation that the service supports async query execution for large exports | Data Platform | 2025-02-01 | Pending confirmation | If async not supported, email delivery for large exports requires a separate background job -- adds 2-week engineering effort |

| Audit logging service | Export actions must be logged; requires audit log service to accept a new event type: "data_export" | Security Engineering | 2025-02-15 | On track | If delayed, export can launch without audit logging only if legal approves a time-limited exception |

| Legal review -- data export and GDPR | Confirm that on-demand CSV export complies with data handling and retention policies for EU accounts | Legal | 2025-02-01 | In progress | If export requires additional consent flows for EU users, launch scope may require segmented rollout (non-EU first) |


Release Plan

| Phase | Rollout | Audience | Gate Conditions to Advance | Duration |

|-------|---------|----------|---------------------------|----------|

| Phase 1 -- Internal | 100% internal users | Internal team members and beta accounts (5 accounts, manually selected) | Zero critical bugs, p95 export time < 30 seconds for test dataset, audit log entries confirmed | 1 week |

| Phase 2 -- Limited | 10% of enterprise accounts (random cohort) | ~8 enterprise accounts | Error rate < 0.5%, p95 response time within guardrail, primary metric directionally positive (support ticket volume decreasing) | 2 weeks |

| Phase 3 -- General | 100% of paid-tier users | All Analyst, Manager, Admin roles on paid tiers | All gate conditions met; no guardrail breaches; legal sign-off confirmed | -- |

Feature flag: bulk-csv-export-enabled, Owner: [Engineering Lead], Default: Off, Kill switch: Disable flag in LaunchDarkly within 5 minutes; Engineering oncall verifies error rate returns to baseline; PM notifies customer-facing stakeholders within 30 minutes.

Rollback triggers:

Rollback procedure: Engineering oncall disables bulk-csv-export-enabled flag in LaunchDarkly → verifies dashboard error rate returns to < 0.5% baseline within 5 minutes → PM notified → PM sends internal stakeholder notification within 30 minutes → post-mortem scheduled within 48 hours.

Post-launch review date: 30 days after Phase 3 launch -- review primary metric (support ticket volume), secondary metrics (adoption rate, exports per user), and guardrail metrics. Close PRD or create Phase 2 PRD based on findings.