Okr setting

From FerroxLabs/wayland · View interactive version

Okr setting is an AI agent skill from the GitHub repository FerroxLabs/wayland. Produces completed OKRs (Objectives and Key Results) with 3-5 objectives and 2-4 measurable key results each for a quarter or year. Use when the user asks to set OKRs, define team or company objectives, create quarterly goals, or structure measurable outcomes for strategic priorities. Do NOT use for

How to use this skill

Skill file

OKR Setting

When to Use

Use this skill when:

Do NOT use this skill when:


Process

Step 1: Gather Required Context Before Drafting Anything

Do not produce OKRs until you have collected the following inputs. If any are missing, ask explicitly:

Step 2: Identify and Rank Strategic Priorities

Before writing a single objective, structure the user's inputs into a priority stack:

Step 3: Write Objectives -- Qualitative, Aspirational, Time-Bound

For each top priority, draft one objective following these rules:

Step 4: Write Key Results -- Quantitative, Outcome-Oriented, Independently Verifiable

Write 2-4 key results per objective using this methodology:

Step 5: Check for the Four Key Result Failure Modes

Run each KR through these four tests before finalizing:

Step 6: Assign Owners, Confidence Scores, and Dependencies

For each objective and each key result:

Step 7: Define the Review Cadence and Mid-Cycle Protocol

OKRs without a review cadence are aspirational documents, not management tools:

Step 8: Validate the Complete OKR Set

Before presenting the final OKRs, run this validation checklist:


Output Format

## OKRs: [Team/Company Name] -- [Time Period]

**Mission Context:** [One sentence: what enduring purpose do these OKRs serve?]
**Scoring Method:** 0.0–1.0 scale (0.7 = stretch target met; this is success)
**Team Size / Capacity:** [X people, notable constraints]
**Set By:** [Name/role] | **Set On:** [Date] | **Review Date:** [Mid-period date]

---

### Priority Stack (ranked)
1. [Priority 1 -- type: growth/efficiency/foundation/defense]
2. [Priority 2]
3. [Priority 3]
(Include all priorities. Show ranking. Deprioritized items listed below the line if user provided more than 5.)

---

### Objective 1: [Aspirational, verb-led, qualitative statement]
**Owner:** [Named person or role]
**Type:** [Growth / Efficiency / Foundation / Defense]
**Confidence at Setting:** [X]% -- [one-sentence rationale]

| KR# | Key Result | Type | Baseline | Target | Owner | Score |
|-----|-----------|------|----------|--------|-------|-------|
| 1.1 | [Metric] from [X] to [Y] | [Leading/Lagging] | [X] | [Y] | [Name] | /1.0 |
| 1.2 | [Metric] from [X] to [Y] | [Leading/Lagging] | [X] | [Y] | [Name] | /1.0 |
| 1.3 | [Metric] from [X] to [Y] | [Leading/Lagging] | [X] | [Y] | [Name] | /1.0 |

**Why these KRs:** [2-3 sentences explaining how these three numbers together fully represent achievement of the objective -- what would be missing if any one were removed]
**Dependencies:** [Team/person -- specific deliverable needed -- commitment confirmed: Yes/No/Pending]
**Risks:** [1-2 specific risks to this objective, not generic]

---

### Objective 2: [Aspirational, verb-led, qualitative statement]
**Owner:** [Named person or role]
**Type:** [Growth / Efficiency / Foundation / Defense]
**Confidence at Setting:** [X]% -- [one-sentence rationale]

| KR# | Key Result | Type | Baseline | Target | Owner | Score |
|-----|-----------|------|----------|--------|-------|-------|
| 2.1 | [Metric] from [X] to [Y] | [Leading/Lagging] | [X] | [Y] | [Name] | /1.0 |
| 2.2 | [Metric] from [X] to [Y] | [Leading/Lagging] | [X] | [Y] | [Name] | /1.0 |
| 2.3 | [Metric] from [X] to [Y] | [Leading/Lagging] | [X] | [Y] | [Name] | /1.0 |

**Why these KRs:** [Explanation]
**Dependencies:** [Cross-team dependencies with commitment status]
**Risks:** [Specific risks]

---

### Objective 3: [Aspirational, verb-led, qualitative statement]
**Owner:** [Named person or role]
**Type:** [Growth / Efficiency / Foundation / Defense]
**Confidence at Setting:** [X]% -- [one-sentence rationale]

| KR# | Key Result | Type | Baseline | Target | Owner | Score |
|-----|-----------|------|----------|--------|-------|-------|
| 3.1 | [Metric] from [X] to [Y] | [Leading/Lagging] | [X] | [Y] | [Name] | /1.0 |
| 3.2 | [Metric] from [X] to [Y] | [Leading/Lagging] | [X] | [Y] | [Name] | /1.0 |

**Why these KRs:** [Explanation]
**Dependencies:** [Cross-team dependencies with commitment status]
**Risks:** [Specific risks]

---

### [Objective 4 and 5 if applicable -- same structure]

---

### OKR Set Health Check
| Criterion | Status | Notes |
|-----------|--------|-------|
| Objective count (3-5) | ✓ / ✗ | [Count] |
| KR count per objective (2-4) | ✓ / ✗ | [Any outliers] |
| All KRs are outcome metrics | ✓ / ✗ | [Flag any outputs] |
| All owners named | ✓ / ✗ | [Any gaps] |
| Leading indicators present | ✓ / ✗ | [Which objectives lack them] |
| Dependencies confirmed | ✓ / ✗ | [Pending confirmations] |
| Confidence range (50-85%) | ✓ / ✗ | [Any outliers] |

---

### Scoring Reference
| Score | Meaning | Action |
|-------|---------|--------|
| 0.0–0.3 | No meaningful progress | Root cause review -- was the target wrong or did execution fail? |
| 0.4–0.6 | Progress made, target missed | Identify specific blockers; carry forward or retire |
| 0.7 | Stretch target met | This is success -- celebrate and set next target from this new baseline |
| 0.8–0.9 | Exceeded target | Ask if baseline was understated or target was insufficiently ambitious |
| 1.0 | Massively exceeded | Target was almost certainly too conservative -- recalibrate next cycle |

### Review Schedule
| Touchpoint | Cadence | Format | Owner |
|------------|---------|--------|-------|
| Weekly progress check-in | Weekly, [Day of week] | 15-min standup; RAG + confidence delta per KR | [Objective owner] |
| Mid-cycle deep review | [Specific date -- week 6] | 60-min working session; confidence rescore, blocker resolution | [Team lead] |
| End-of-cycle scoring | By [Date -- 5 days post period end] | Async score entry + 45-min retrospective | [All owners] |
| Next cycle planning kickoff | [Date -- 2 weeks before new period] | Draft OKRs based on retrospective learnings | [Team lead] |

### Deprioritized Items (if applicable)
The following priorities were raised but not included in this cycle's OKRs due to capacity constraints or lower strategic urgency. They are candidates for the next cycle or for inclusion if a higher-priority objective is completed early:
- [Item 1 -- reason for deferral]
- [Item 2 -- reason for deferral]

Rules

  1. Never produce OKRs without baselines. A target without a baseline is not a key result -- it is a wish. If the user cannot provide a baseline, help them identify where the data lives and set finding the baseline as a prerequisite action item before the OKR cycle begins. A KR like "achieve NPS of 45" is incomplete; "increase NPS from 28 to 45" is valid.
  1. Enforce the 3-5 objective limit absolutely. If a user insists on 6 or 7 objectives, do not produce all six -- instead, present the list and ask: "If your team could only accomplish three of these this quarter and everything else stayed flat, which three would you choose?" Document the others in the Deprioritized Items section. More than 5 objectives is a symptom of an inability to say no, not a sign of ambition.
  1. Key results measure outcomes, not activities or outputs. The output/outcome distinction is the most common and most damaging OKR error. "Launch the redesigned onboarding flow" is an output -- it can be completed even if onboarding fails. "Reduce median time-to-first-workflow-creation from 18 days to 6 days" is an outcome. When a user writes an output KR, rewrite it as an outcome and show the user why the distinction matters.
  1. One metric per key result, no exceptions. A KR with two metrics ("increase trial conversion and reduce CAC") cannot be scored cleanly. The two metrics may require contradictory interventions. If a user writes a compound KR, split it into two separate KRs and note that this may push them over the 4 KR limit, requiring one to be dropped.
  1. Never tie OKR scores to compensation or performance ratings. This is the most well-documented cause of OKR program failure. When compensation is at stake, teams sandbag targets to guarantee a 1.0 score. OKRs are a direction-setting and learning tool, not a performance evaluation instrument. If a user asks to use OKR scores for reviews or bonuses, explicitly flag this as a known failure mode and recommend separating the two processes.
  1. Set and document confidence at 70% for each objective at time of writing. Objectives with >85% confidence at writing are not ambitious enough and should be escalated. Objectives with <50% confidence at writing are likely to demoralize and should be descoped or given explicit additional resources. Confidence is not a performance prediction -- it is a calibration signal.
  1. Every objective and every KR must have exactly one named human owner, not a team. "Engineering" cannot be held accountable. "Priya Sharma, Engineering Lead" can be. When a user specifies a team as owner, ask for the specific person who will be accountable.
  1. Flag unconfirmed cross-team dependencies as high-risk. A key result that depends on another team's deliverable without an explicit commitment is not a valid KR -- it is a hope. Mark all dependencies with commitment status (Confirmed/Pending/Unknown) and flag Pending and Unknown as blockers that must be resolved in week one of the cycle.
  1. At least one leading indicator key result per objective. Lagging indicators (annual retention, ARR, CSAT score) are important but only visible at the end of the period. Without a leading indicator, teams can spend ten weeks failing before anyone notices. For every objective, ensure at least one KR moves on a weekly or monthly basis.
  1. If a user asks to use binary (done/not done) scoring for all KRs, push back. Binary scoring eliminates the signal contained in partial achievement. A KR scored 0.6 tells you the team made meaningful progress and got 60% of the way to the target -- valuable information for the next cycle. Binary 0 on the same KR tells you nothing except that it was not completed. Reserve binary scoring only for truly discrete deliverables (e.g., "Achieve SOC 2 Type II certification") that have no meaningful partial state.
  1. Never let OKRs become a task list. If every item in the key results section describes something the team plans to do rather than a state of the world they plan to create, the OKR set has been written as a project plan. OKRs answer "how will we know we succeeded?" -- project plans answer "what will we do?" Both are necessary; they are not interchangeable.
  1. Validate that the full OKR set is achievable given stated team capacity. If a team of 5 engineers has three objectives each with 4 key results and ambitious targets, ask whether there is sufficient capacity to pursue all 12 KRs simultaneously. A practical heuristic: each KR requires meaningful dedicated effort from at least one person; 8-12 total KRs is the maximum for most teams of under 20 people.

Edge Cases

First OKR Cycle -- Organization Has Never Done OKRs Before

Set a lower bar on ambition for cycle one -- the goal is to build the habit, not achieve maximum stretch simultaneously. Limit to 2-3 objectives with 2 KRs each. Include a meta-objective for the OKR practice itself with KRs such as: "Complete 8 of 13 weekly check-ins on schedule," "Score all KRs within 5 business days of quarter end," and "Conduct end-of-cycle retrospective with 80% of objective owners present." Explain to the user that the first cycle's primary output is learning what good OKRs look like for their specific context -- not transformational business results. Targets will be off; baselines will be discovered to be wrong; that is expected and acceptable.

Cascading Company OKRs to Team Level

Start by documenting the company-level OKRs (which must exist before team OKRs are written). Then for each team, identify which company objectives their work influences most directly. Team objectives should be written to contribute to at least one company objective, with the company objective explicitly referenced. Show the cascade mapping in a table:

| Team Objective | Contributes to Company Objective |

|---------------|----------------------------------|

| [Team O1] | Company O2, Company O3 |

Not every company objective needs a team-level counterpart -- some company objectives are owned entirely at the exec level. Not every team objective needs to map to a company objective -- some team objectives address team-specific foundation work (hiring, technical debt, process) that enables future company objectives without directly moving current ones. The cascade should be explicit but need not be rigid.

Annual OKRs Instead of Quarterly

Annual OKRs require quarterly milestone checkpoints embedded within each key result -- otherwise there is no mechanism for mid-year course correction. Structure each annual KR with four quarterly milestones: "Increase ARR from $4.2M to $7.0M, with quarterly checkpoints of $4.8M (Q1), $5.5M (Q2), $6.2M (Q3), $7.0M (Q4)." Review at each quarterly milestone exactly as you would a quarterly OKR end-of-cycle. Annual OKRs work best for objectives that genuinely require a full year to show results (building a new product line, entering a new market, achieving a compliance certification). For anything measurable in 90 days, quarterly is strongly preferred.

OKRs for a Team in Crisis or Turnaround

In a turnaround context (significant revenue decline, recent layoff, near-miss compliance failure, product outage impacting customers), objectives shift from growth to defense and stabilization. Key results should include explicitly defensive targets: "Maintain customer retention above 78%" rather than "Increase retention to 85%." Confidence scores will be lower -- 55-65% is acceptable and should be acknowledged rather than hidden. Reduce the total number of objectives to 2-3 -- crisis response requires focused effort, not a full-spectrum strategic program. Consider including a Crisis Metrics section beneath the standard OKR set listing the handful of metrics the team will track weekly regardless of OKR structure (cash runway, daily active users, support escalation volume, employee attrition signals).

OKRs for an Individual Contributor

Individual-level OKRs follow the same structure but with two additional constraints. First, key results must be within the IC's sphere of direct control -- an IC cannot own a KR that depends on a full-team behavior change they cannot enforce. Second, IC objectives should explicitly map to at least one team-level objective to ensure alignment. A common error is IC OKRs that are purely personal development goals -- "get better at SQL," "improve presentation skills." These are personal development items that belong in a growth plan, not OKRs. IC OKRs should describe the business impact the IC will create in their role this quarter.

OKRs With Missing Baseline Data

If a user cannot provide a baseline for a key result because the metric has never been tracked, handle it explicitly. For the current cycle, create a "measurement establishment" KR: "Instrument and baseline [metric] by week 3 and achieve [target] by end of quarter." This KR acknowledges the measurement gap and makes closing it the first deliverable. Alternatively, set the first cycle's KR as purely measurement-focused: "Establish baseline measurement for customer health score covering 100% of enterprise accounts by week 4." The following cycle can then set a directional target from that baseline. Never invent a baseline number to make the format work.

OKRs That Are Actually Project Plans in Disguise

Some users will present a set of initiatives or features they plan to ship and ask to convert them into OKRs. The output format will look like OKRs but will be structured as an activity list. Recognize this pattern: "Objective: Launch the new dashboard. KR1: Complete UI design by week 3. KR2: Ship backend API by week 6. KR3: Release to all users by week 10." These are project milestones, not OKRs. Push back and reframe: ask "What business outcome would a successful dashboard launch create?" Then write the OKR around that outcome: "Objective: Make product data effortlessly accessible for every user. KR1: Increase daily active dashboard usage from 18% to 45% of licensed users. KR2: Reduce time spent by users generating standard reports from 25 minutes to under 5 minutes." Point the user to the project management skill for the execution tracking they also need.


Example

Input: "Set Q3 2026 OKRs for our 12-person Customer Success team. We're a B2B SaaS company with $8.5M ARR and 340 enterprise customers. We just came off a rough Q2 where we lost 11 customers and our NPS dropped from 42 to 31. The CEO wants us to focus this quarter on stopping the churn, rebuilding customer health scores, and proving the value of CS to the CFO who is questioning the team's ROI. We track NPS, CSAT, churn rate, and we have a health score model that currently rates 38% of our accounts as Red. I don't have a good number for our current expansion revenue contribution. Team capacity is normal -- no headcount changes this quarter."

Output:


OKRs: Customer Success Team -- Q3 2026

Mission Context: Ensure every enterprise customer achieves measurable value from the platform, making renewal and expansion the natural outcome of a successful partnership.

Scoring Method: 0.0--1.0 scale (0.7 = stretch target met; this is success)

Team Size / Capacity: 12 CSMs -- full capacity, no headcount changes this quarter

Set By: CS Team Lead | Set On: [Q3 kickoff date] | Mid-Cycle Review: [Week 7 of Q3]


Priority Stack (ranked)

  1. Stop customer churn -- Defense (lost 11 customers in Q2; this is the existential priority)
  2. Rebuild customer health -- Defense/Foundation (38% Red accounts is a leading indicator of continued churn)
  3. Prove CS team ROI to the CFO -- Foundation (team budget is at risk without demonstrated impact)
  4. Establish expansion revenue baseline -- Foundation (currently unmeasured; cannot manage what we cannot see)

Note: Priority 4 was added because the inability to report expansion revenue is itself a risk to Priority 3. It requires only measurement work, not a full strategic push, so it is embedded into Objective 3 rather than receiving its own standalone objective.


Objective 1: Halt the churn crisis and make our enterprise base stable

Owner: Director of Customer Success

Type: Defense

Confidence at Setting: 65% -- Q2 churn had multiple root causes, not all of which are within CS control; pricing and product gaps may continue to influence outcomes

| KR# | Key Result | Type | Baseline | Target | Owner | Score |

|-----|-----------|------|----------|--------|-------|-------|

| 1.1 | Reduce monthly gross customer churn rate from 1.1% to 0.4% (trailing 3-month average at Q3 end) | Lagging | 1.1%/mo | 0.4%/mo | Director of CS | /1.0 |

| 1.2 | Reduce percentage of enterprise accounts with a Red health score from 38% to 20% | Leading | 38% | 20% | CS Ops Lead | /1.0 |

| 1.3 | Complete documented save plays for all 43 currently Red-flagged accounts by week 6 | Leading | 0 of 43 | 43 of 43 | All CSMs | /1.0 |

Why these KRs: KR 1.1 is the lagging outcome the objective is designed to move. KR 1.2 is the leading indicator -- Red health score is the strongest predictor of churn in our model, and moving it gives a mid-quarter signal on whether the intervention is working before it shows up in the churn rate. KR 1.3 ensures structured action on every at-risk account rather than ad hoc firefighting; without it, teams tend to focus only on the loudest accounts, not the highest-risk ones.

Dependencies: Product team -- confirmation of the top 3 product gaps cited in Q2 exit interviews will be addressed (Pending as of OKR setting date). Finance -- access to full customer contract data for renewal date mapping (Confirmed).

Risks: External: competitor pricing actions may continue to drive evaluations regardless of CS quality. Internal: if more Red accounts exist than currently identified, KR 1.2 target may need revision after a complete audit in week 1.


Objective 2: Transform CS from a reactive support function into a proactive value driver

Owner: CS Operations Lead

Type: Foundation

Confidence at Setting: 70% -- team has the skills; this is a process change, which is within our control

| KR# | Key Result | Type | Baseline | Target | Owner | Score |

|-----|-----------|------|----------|--------|-------|-------|

| 2.1 | Increase NPS from 31 to 42 (measured via quarterly pulse survey sent week 12) | Lagging | 31 | 42 | Director of CS | /1.0 |

| 2.2 | Increase the percentage of customers receiving a proactive business review (QBR or EBR) before their renewal date from 22% to 70% | Leading | 22% | 70% | CS Ops Lead | /1.0 |

| 2.3 | Increase average CSAT score on post-interaction surveys from 3.8/5 to 4.4/5 | Leading | 3.8 | 4.4 | All CSMs | /1.0 |

Why these KRs: NPS (KR 2.1) is the headline outcome metric and tracks overall sentiment trajectory. QBR/EBR coverage (KR 2.2) is the specific behavioral change we believe drives NPS -- customers who receive proactive reviews are 3x more likely to renew and expand in our historical data. CSAT (KR 2.3) tracks quality of individual interactions and catches regressions in team execution before they show up in NPS.

Dependencies: Marketing -- updated customer-facing ROI report template needed for QBRs (Pending). RevOps -- renewal date data feed to CS platform (Confirmed).

Risks: NPS survey response rate may be low given Q2 trust damage -- we may need to increase outreach to get statistically significant sample. Target of 42 assumes we can reach the accounts most positively impacted first; if the most vocal detractors respond disproportionately, the score may lag even as sentiment improves.


Objective 3: Prove the business impact of Customer Success to secure the team's future investment

Owner: Director of Customer Success

Type: Foundation

Confidence at Setting: 75% -- the data is measurable; this is an execution and communication challenge, not a discovery problem

| KR# | Key Result | Type | Baseline | Target | Owner | Score |

|-----|-----------|------|----------|--------|-------|-------|

| 3.1 | Establish and baseline CS-influenced expansion revenue metric by week 4, with Q3 actuals reported to CFO by week 13 | Leading | Unmeasured | Baseline + actuals documented | CS Ops Lead | /1.0 |

| 3.2 | Increase CS-influenced net revenue retention rate from 94% to 102% (baseline to be confirmed in week 2 audit) | Lagging | ~94% (estimated) | 102% | Director of CS | /1.0 |

| 3.3 | Deliver a CS Impact Report to the CFO by week 12 covering: churn prevention value ($), expansion revenue influenced ($), and cost-per-retained-customer | Lagging | No report exists | Report delivered and reviewed | Director of CS | /1.0 |

Why these KRs: KR 3.1 closes the measurement gap immediately -- we cannot manage or report expansion revenue without a definition and baseline, and it must be established early in the quarter to have actuals by week 13. KR 3.2 is the single most important financial metric for CS team ROI -- net revenue retention above 100% means the CS team is generating more revenue from the existing base than is leaving, a compelling CFO argument. KR 3.3 is the explicit deliverable that ties the other two together and ensures the work is communicated, not just done.

Dependencies: RevOps -- revenue attribution model for expansion (Pending -- must be confirmed by week 1). Finance -- access to customer contract values for churn prevention calculation (Confirmed).

Risks: KR 3.2 baseline of 94% is an estimate -- the actual baseline audit in week 2 may reveal a different number, requiring target revision. KR 3.3 has a discrete binary element; consider adding an intermediate milestone (draft delivered to CS leadership by week 10) to avoid last-minute risk.


OKR Set Health Check

| Criterion | Status | Notes |

|-----------|--------|-------|

| Objective count (3-5) | ✓ | 3 objectives |

| KR count per objective (2-4) | ✓ | All objectives have exactly 3 KRs |

| All KRs are outcome metrics | ✓ | KR 1.3 and KR 3.3 have discrete delivery components -- acceptable given they represent structural changes with clear completion states |

| All owners named | ✓ | All objective and KR owners specified by role |

| Leading indicators present | ✓ | KR 1.2, 1.3, 2.2, 2.3, 3.1 are leading indicators |

| Dependencies confirmed | ⚠ | 3 dependencies Pending -- must be resolved in week 1 |

| Confidence range (50-85%) | ✓ | Range is 65-75%; all within acceptable band |

| Baseline data complete | ⚠ | KR 3.2 baseline is estimated -- audit required by week 2 |


Scoring Reference

| Score | Meaning | Action |

|-------|---------|--------|

| 0.0--0.3 | No meaningful progress | Root cause review -- was the target wrong or did execution fail? |

| 0.4--0.6 | Progress made, target missed | Identify specific blockers; carry forward or retire |

| 0.7 | Stretch target met | This is success -- celebrate and set next target from this new baseline |

| 0.8--0.9 | Exceeded target | Ask if baseline was understated or target was insufficiently ambitious |

| 1.0 | Massively exceeded | Target was too conservative -- recalibrate next cycle |

Review Schedule

| Touchpoint | Cadence | Format | Owner |

|------------|---------|--------|-------|

| Weekly CS standup | Every Monday, 9am | 20-min RAG check per KR + confidence delta | Director of CS |

| Week 1 action | Week 1 only | Resolve 3 pending dependencies; confirm KR 3.2 baseline | CS Ops Lead |

| Mid-cycle deep review | Week 7 | 60-min session; confidence rescore; baseline correction for KR 3.2 if needed | Director of CS |

| CFO Impact Report draft review | Week 10 | Internal CS review of draft before CFO submission | Director of CS |

| End-of-cycle scoring | 5 days after Q3 end | Async KR scoring + 45-min retrospective: what do we carry into Q4? | All owners |

| Q4 OKR kickoff | 2 weeks before Q4 start | Draft Q4 OKRs using Q3 actuals as new baselines | Director of CS |

Deprioritized Items This Cycle

The following priorities were discussed but not included in Q3 OKRs due to capacity constraints. They are Q4 candidates:

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.