Mvp definition

From FerroxLabs/wayland · View interactive version

Mvp definition is an AI agent skill from the GitHub repository FerroxLabs/wayland. Defines a minimum viable product with problem statement, core functionality scope, explicit exclusions, success metrics, and validation approach using MVP methodology. Use when the user asks about MVP definition, minimum viable product, scoping an MVP, what to build first, or lean product developmen

How to use this skill

Skill file

MVP Definition

When to Use

Use this skill when:

Do NOT use this skill when:


Process

Step 1: Surface the Core Hypothesis and Risk Landscape

Before scoping a single feature, establish what unknown the MVP is designed to resolve. An MVP is not a small product -- it is a structured experiment with a falsifiable hypothesis. If the hypothesis is vague, the MVP scope will be random.


Step 2: Define the Target User with Specificity

The MVP serves one user type -- the early adopter -- not the eventual target market. These are different people with different needs and different tolerance for product immaturity.


Step 3: Map the Critical Path -- The Sequence That Delivers Value

The critical path is the minimum sequence of steps a user must take to experience the core value proposition. Every feature in the MVP must appear on this path. Features not on the path are excluded by definition.


Step 4: Scope the IN Set -- Core Functionality

With the critical path defined, translate path steps into features. Apply brutal pruning.


Step 5: Define the OUT Set -- Explicit Exclusions with Rationale

The exclusion list is as important as the inclusion list. Undocumented exclusions become "I thought we were building that" arguments that derail sprints.


Step 6: Define the Primary Success Metric and Decision Gate

An MVP without a pre-defined success metric produces ambiguous results. The team needs to know, before they build, what "the test passed" looks like.

Setting this in advance removes the temptation to rationalize weak results.


Step 7: Construct the Build Plan and Apply the 6-Week Rule

The build plan converts the MVP scope into a timeline and exposes scope problems before a line of code is written.


Step 8: Document and Communicate the MVP Definition

An MVP definition that exists only in the founder's head is not a definition -- it is a feeling. The document must be created, shared, and used as a decision-making reference.


Output Format

## MVP Definition: [Product Name]

**Version:** 1.0 | **Date:** [Date] | **Decision Point:** [Date, typically 4-6 weeks post-launch]

---

### Primary Hypothesis

**We believe** [specific target user with behavioral context, not demographic]
**will** [specific measurable behavior]
**because** [core value proposition -- the reason the behavior will occur]
**We will know this is validated when** [primary metric] reaches [specific numeric target] within [X weeks of launch].

**Riskiest assumption being tested:** [The one thing that, if false, kills the product]

---

### Target User

| Field | Detail |
|---|---|
| **Segment** | [Specific user segment defined by behavior, not demographics] |
| **Early adopter profile** | [The most desperate subset -- what workaround are they using today?] |
| **Current workaround** | [What tool or manual process solves this for them today, imperfectly] |
| **Core pain** | [The specific friction or cost the MVP removes] |
| **Out of scope users** | [Who is explicitly NOT served by this MVP] |

---

### Core Functionality (IN Scope)

| # | Feature | Why On Critical Path | Simplest Viable Version | Build Estimate |
|---|---|---|---|---|
| 1 | [Feature name] | [Specific reason this is required for value delivery] | [The stripped-down implementation that works] | [X days] |
| 2 | [Feature name] | [Specific reason this is required for value delivery] | [The stripped-down implementation that works] | [X days] |
| 3 | [Feature name] | [Specific reason this is required for value delivery] | [The stripped-down implementation that works] | [X days] |
| 4 | [Feature name] | [Specific reason this is required for value delivery] | [The stripped-down implementation that works] | [X days] |
| - | **Infrastructure** | Required for launch (not product features) | Auth + email + payments if applicable | [X days] |

**Manual processes replacing build (Wizard of Oz / Concierge):**
- [Process 1]: [What the user sees vs. what the founder does manually]
- [Process 2]: [What the user sees vs. what the founder does manually]

---

### Critical User Journey

| Step | Action | What Makes This Possible | Can It Be Manual? |
|---|---|---|---|
| 1 | [User arrives / discovers] | [Channel or trigger] | N/A |
| 2 | [User signs up or enters] | [Feature or landing page] | [Yes/No] |
| 3 | [User provides input or setup] | [Onboarding or configuration] | [Yes/No] |
| 4 | **[User receives core value]** | [Core feature -- the aha moment] | [Yes/No] |
| 5 | [User saves, exports, or acts on output] | [Export or action feature] | [Yes/No] |
| 6 | [User returns] | [Retention trigger -- notification, habit, cron job] | [Yes/No] |

---

### Out of Scope (Explicit Exclusions)

| Feature | Deferred Phase | Reason for Exclusion | Who Requested It |
|---|---|---|---|
| [Feature] | Phase 2 | [Tests a different hypothesis / not on critical path / adds weeks of scope] | [Stakeholder] |
| [Feature] | Phase 2 | [Reason] | [Stakeholder] |
| [Feature] | Phase 3 | [Reason] | [Stakeholder] |
| [Feature] | Phase 3 | [Reason] | [Stakeholder] |
| [Feature] | Never | [Outside product scope boundary] | [Stakeholder] |

---

### Success Metrics

| Type | Metric | Target | Timeline | Measurement Method |
|---|---|---|---|---|
| **Primary** | [Single most important metric] | [Specific number] | [X weeks post-launch] | [Tool and method] |
| **Secondary** | [Supporting metric] | [Specific number] | [X weeks] | [Tool and method] |
| **Secondary** | [Supporting metric] | [Specific number] | [X weeks] | [Tool and method] |
| **Guardrail** | [Must-not-exceed threshold] | [Ceiling value] | Ongoing | [Tool and method] |

---

### Build Plan

| Component | Owner | Estimate | Dependencies |
|---|---|---|---|
| [Component 1] | [Named person] | [X days] | [None / Component N] |
| [Component 2] | [Named person] | [X days] | [Component 1] |
| [Component 3] | [Named person] | [X days] | [None] |
| Infrastructure | [Named person] | [X days] | [None] |
| QA / bug fix buffer | [Named person] | [3 days minimum] | All components |
| **Total** | | **[X weeks]** | |

**Launch date:** [Fixed date]
**Beta cohort size:** [20-50 users recommended for first evaluation]
**Evaluation date:** [Fixed date, 4-6 weeks post-launch]

---

### Decision Gate

| Outcome | Condition | Action |
|---|---|---|
| **Proceed to Phase 2** | Primary metric ≥ [target] | Begin Phase 2 scoping using this framework |
| **Pivot** | Primary metric < [target] AND qualitative interviews reveal alternate direction | Define new hypothesis, scope new MVP |
| **Kill** | Primary metric < [target] AND no clear alternate hypothesis | Sunset the product, document learnings |

---

### Open Questions

List any unresolved questions that could affect scope, sequencing, or success metric definition:
1. [Question 1]
2. [Question 2]

Rules

  1. The hypothesis must be falsifiable before a single feature is chosen. If you cannot write a specific metric and target that would prove the hypothesis false, the hypothesis is not tight enough. Rewrite the hypothesis until it is falsifiable. Scope flows from hypothesis -- if the hypothesis is vague, the scope will be vague.
  1. The primary success metric must be behavioral, not attitudinal. "Users said they liked it" (NPS, survey ratings) is not a success metric for an MVP. Behavior -- returning, paying, referring, repeating the core action -- is the only valid signal. Users lie in surveys. They do not lie with their behavior.
  1. "Minimum viable" means minimum scope, not minimum quality on the critical path. The features IN the MVP must work reliably and feel credible. A broken core experience invalidates the test entirely -- users cannot tell whether they rejected the concept or the execution. Invest 100% of the quality budget into the 3-4 MVP features. Defer everything else, but make the included features excellent.
  1. Every feature in the MVP must map directly to the critical user journey. If you cannot point to the specific step in the critical path that a feature enables, the feature is not in the MVP. No exceptions. This is the single most effective scope reduction rule.
  1. The 6-week ceiling is a hard constraint, not a guideline. If the honest build estimate exceeds 6 weeks for the available team, cut features until it fits. Do not adjust the timeline upward -- adjust the scope downward. An MVP that takes 4 months to build is a V1 with a branding problem and a team that will resist pivoting after so much investment.
  1. The exclusion list must be documented and dated. Verbal scope exclusions do not survive the first sprint. Write them down with reasons. When a stakeholder asks "why aren't we building X?" the answer is a row in the exclusion table, not a memory of a conversation.
  1. Manual processes are first-class MVP features. "Build an algorithm" and "founder does it manually for the first 30 users" are both valid implementations of a feature. The test is whether users experience the value -- not how the value was produced. Prioritize Wizard of Oz and Concierge implementations aggressively. They generate learning while preserving time to build the right automated version.
  1. Design for the early adopter's pain tolerance, not the mass market's polish expectations. The early adopter will tolerate a plain UI, a CSV export instead of a dashboard, and a manual onboarding call. The mass market will not. This asymmetry is a strategic asset -- you can reach the early adopter faster and cheaper. Do not gold-plate the MVP to appeal to users who are not your audience yet.
  1. Set the decision gate before the MVP launches. The evaluation criteria (proceed / pivot / kill and the specific metric thresholds) must be written down and agreed upon before the launch date. Post-hoc rationalization of weak results is the leading cause of zombie products -- products that neither succeed nor get killed.
  1. A marketplace, platform, or network-effect product must test one side of the network first. Attempting to simultaneously acquire supply and demand in a two-sided market doubles the scope and introduces the chicken-and-egg problem as a variable. The MVP must test supply or demand independently. Define which side the MVP validates and scope accordingly.
  1. Regulatory or security requirements are scope-fixed, not scope-flexible. If the product operates in healthcare (HIPAA), financial services (SOC 2, PCI-DSS), or handles children's data (COPPA), compliance features are in the MVP regardless of whether they are on the "critical path." List them as infrastructure requirements, not product features, but include them in the build estimate.
  1. The MVP scope must be agreed upon by engineering, design, and product before sprint planning begins. A scope document that only product or the founder has read is not an agreed scope -- it is a wishlist. Require explicit acknowledgment from all build team members before locking scope.

Edge Cases

Early Adopters Are Unavailable for Feedback

Some products target users who are difficult to reach quickly (surgeons, CFOs at enterprise companies, government officials). If the beta cohort cannot be assembled within 2 weeks of launch, the MVP feedback loop breaks.


B2B SaaS With Long Sales Cycles

In B2B, the buyer (who approves purchase) and the user (who uses the product daily) are often different people. The MVP must satisfy both, which can create conflicting scope requirements.


The Founder Wants to Build "The Full Vision" First

This is the most common failure mode. The founder argues that "users will only adopt it if it has features X, Y, and Z." This is almost always rationalization, not evidence.


Hardware or Physical Product MVP

Physical prototypes are expensive to iterate, which inverts the usual lean product logic. The MVP cannot simply be "the simplest version we can build."


Two-Sided Marketplace (Chicken-and-Egg)

Marketplaces require both supply and demand to deliver value, making it structurally impossible to build a "minimal" two-sided product. Every attempt to build both sides simultaneously produces a product that is too complex for an MVP timeline.


Regulated Product (Healthcare, FinTech, Legal)

Compliance requirements can make an MVP look substantially more complex than a comparable unregulated product. The risk is treating compliance as a reason to delay launch indefinitely.


API or Developer-Facing Product

Developer tools have a different definition of "viable" because the user is also the person evaluating technical quality and reliability. A buggy API that works 95% of the time is unusable -- 99.9% uptime is table stakes.


Example

Input:

"I'm building a tool for independent financial advisors (RIAs) to automatically generate personalized client portfolio review reports. Right now advisors spend 3-4 hours manually pulling data from custodians, formatting it in Word, and writing commentary for each quarterly review. I want to build something that automates this. What should the MVP be?"


Output:

MVP Definition: AdvisorReport

Version: 1.0 | Date: [Today] | Decision Point: 6 weeks post-launch


Primary Hypothesis

We believe independent RIA advisors managing 50-150 client households

will use AdvisorReport to generate at least 80% of their quarterly client review reports

because it reduces per-report preparation time from 3-4 hours to under 30 minutes by automating data aggregation and generating a structured first-draft narrative

We will know this is validated when at least 40% of beta advisors generate reports for 80%+ of their client base in the first full quarter of use (Q1 adoption rate ≥ 40%).

Riskiest assumption being tested: That advisors will trust and submit an AI-generated narrative draft to clients with light editing, rather than rewriting it from scratch -- which would eliminate the time savings entirely.


Target User

| Field | Detail |

|---|---|

| Segment | Independent RIAs (registered investment advisors) operating solo or with 1-2 support staff, managing 50-150 household relationships |

| Early adopter profile | Advisors who are currently spending 2+ days per quarter manually producing quarterly review reports, have expressed frustration with the process in advisor forums (NAPFA, XY Planning Network), and are already attempting partial automation with mail merge or Excel macros |

| Current workaround | Manual process: export CSV from custodian (Schwab, Fidelity, TD Ameritrade), paste data into a Word template, write personalized commentary for each client, PDF it, and email it. 3-4 hours per client report. |

| Core pain | Time cost of report production crowds out time for client acquisition and financial planning work. Many advisors delay or skip quarterly reviews because of the production burden. |

| Out of scope users | Enterprise RIAs with dedicated ops staff, broker-dealers using proprietary reporting systems, advisors using full-suite wealth management platforms (Orion, Tamarac) that already include reporting modules |


Core Functionality (IN Scope)

| # | Feature | Why On Critical Path | Simplest Viable Version | Build Estimate |

|---|---|---|---|---|

| 1 | CSV data import and normalization | Without data input, no report is possible. Custodian API integrations are 3-6 month projects; CSV export is already part of the advisor's workflow | Accept a standardized CSV export from Schwab Advisor Center or Fidelity Wealthscape. Parse and normalize: account value, allocation, performance YTD and 1-year, top holdings. Reject malformed files with a clear error message. | 4 days |

| 2 | Report template engine | Produces the structured output that is the product's core value. One template in the MVP -- advisors who want customization can wait for Phase 2 | Single template: executive summary (AI-generated), portfolio performance table, allocation breakdown chart (static bar chart), benchmark comparison (S&P 500 and 60/40 default), 3-bullet forward-looking commentary draft. No custom branding, no color themes. | 5 days |

| 3 | AI narrative generation | This is the riskiest assumption -- the advisor must trust the output enough to send it. Without this, the product is just a formatting tool, which is not worth paying for | GPT-4o fine-tuned prompt generating 3 sections: (a) performance summary relative to benchmark, (b) allocation rationale, (c) outlook paragraph. Advisor can edit inline in the browser before export. Tone preset: professional and client-friendly. No custom voice in MVP. | 4 days |

| 4 | PDF export | The output format advisors actually send to clients. Without a clean PDF, the report cannot be used | Single-page and multi-page PDF export. Advisor firm name and logo on header (text input only -- no custom color/font theming). Download button. | 2 days |

| - | Infrastructure | Auth + secure file handling (data must be treated as sensitive financial data, not stored beyond the session without consent) | Clerk for auth, server-side CSV processing (no client-side storage of financial data), session-scoped data deletion after export. No long-term data persistence in MVP -- advisor uploads fresh each time. | 3 days |

Manual processes replacing build (Wizard of Oz / Concierge):


Critical User Journey

| Step | Action | What Makes This Possible | Can It Be Manual? |

|---|---|---|---|

| 1 | Advisor discovers product via NAPFA forum post or XY Planning Network community | Founder-led community outreach + waitlist landing page | N/A |

| 2 | Advisor signs up for beta access | Email signup with Clerk auth, founder approves access within 24 hours (manual gate in MVP) | Yes -- founder emails access code |

| 3 | Advisor exports CSV from their custodian and uploads it | CSV upload component, parser normalizes data, displays preview table for advisor to confirm | Partially -- founder can manually process misformatted CSVs |

| 4 | Advisor reviews AI-generated report draft | Template engine + GPT-4o narrative generation. Advisor sees formatted report with editable text fields. This is the aha moment. | No -- this is the core automated value |

| 5 | Advisor edits narrative and exports PDF | Inline text editor + PDF export | No -- PDF generation must be automated |

| 6 | Advisor returns next quarter | Email reminder 2 weeks before end of quarter: "Q[X] reports are due soon -- upload your client data to AdvisorReport" | Yes -- founder sends this email manually in MVP |


Out of Scope (Explicit Exclusions)

| Feature | Deferred Phase | Reason for Exclusion | Who Requested It |

|---|---|---|---|

| Direct custodian API integration (Schwab, Fidelity) | Phase 2 | API partnerships take 3-6 months to negotiate and build. CSV covers 100% of the use case for MVP. | Initial advisor interviews |

| Custom report templates and branding | Phase 2 | Tests a customization hypothesis, not the core time-savings hypothesis. One template is sufficient to validate the primary hypothesis. | Founder vision |

| Client portal (advisors email reports directly from the platform) | Phase 2 | Adds compliance complexity (email delivery regulations for financial communications). Copy-paste or download is acceptable for MVP. | Advisor interviews |

| Multi-advisor firm accounts and role management | Phase 3 | MVP targets solo advisors. Team features require the solo use case to be validated first. | None yet |

| Automated performance calculation (YTD, IRR) | Phase 2 | Advisor's custodian already calculates performance and includes it in the CSV export. Recalculating independently adds risk without adding value in MVP. | Founder |

| CRM integration (Salesforce, Redtail, Wealthbox) | Phase 3 | CSV import covers the data need. Integration adds 3-4 weeks of scope and tests a different hypothesis (workflow integration vs. core value). | Advisor interviews |

| Regulatory disclosure management (adding required disclaimers automatically) | Phase 2 | Advisors have existing disclaimer language they append manually. This is a workflow convenience, not a core value feature. Note: advisors are responsible for their own compliance; MVP terms of service must state this clearly. | Compliance advisor |

| Historical report archive | Phase 2 | MVP does not store data beyond the session. No archive to display. Persistent storage is a Phase 2 architectural decision. | None yet |


Success Metrics

| Type | Metric | Target | Timeline | Measurement Method |

|---|---|---|---|---|

| Primary | Quarterly report adoption rate: % of beta advisors who generate reports for ≥80% of their client book using AdvisorReport in their first full quarter | ≥ 40% of beta advisors | Q1 post-launch (approx. 10-12 weeks after launch) | Founder manually counts reports generated per advisor in the session log |

| Secondary | Time-to-first-report: time from CSV upload to PDF download for a first-time user | ≤ 25 minutes | Measured for first 20 reports generated | Server-side timestamps on upload event and download event |

| Secondary | Narrative edit rate: % of AI-generated narrative sections that advisors edit before export | Baseline measurement only -- no pass/fail target in MVP | Ongoing | Track character diff between generated text and exported text |

| Guardrail | Support escalation rate: % of report generation sessions that require founder intervention (broken parser, generation failure, etc.) | ≤ 15% of sessions | Ongoing | Manual count from support emails and Zoom calls |


Build Plan

| Component | Owner | Estimate | Dependencies |

|---|---|---|---|

| Auth + secure session infrastructure | Engineer | 3 days | None |

| CSV parser and normalization (Schwab + Fidelity formats) | Engineer | 4 days | Auth |

| Report template engine + static chart generation | Engineer | 5 days | CSV parser |

| GPT-4o prompt engineering + narrative generation API | Engineer + Founder | 4 days | Template engine |

| Inline text editor + edit tracking | Engineer | 2 days | Template engine |

| PDF generation and download | Engineer | 2 days | Editor |

| Landing page + waitlist + beta access flow | Founder | 2 days | Auth |

| QA, edge case testing, bug fix buffer | Engineer | 4 days | All components |

| Total | | 26 days (~5.5 weeks for solo engineer) | |

Launch date: Fixed at 6 weeks from project start

Beta cohort size: 15-20 independent RIA advisors recruited via NAPFA and XY Planning Network communities

Evaluation date: End of first full quarter post-launch (advisors must complete at least one quarterly review cycle)


Decision Gate

| Outcome | Condition | Action |

|---|---|---|

| Proceed to Phase 2 | ≥40% of beta advisors use AdvisorReport for ≥80% of their Q1 reports | Begin Phase 2: custodian API integration (Schwab), custom branding, client email delivery |

| Pivot | <40% adoption rate, but qualitative interviews reveal advisors are using it for a different workflow (e.g., prospect presentations rather than client reviews) | Redefine hypothesis around prospect workflow use case, scope new MVP around that use case |

| Kill | <40% adoption rate, narrative edit rate >90% (advisors are rewriting everything, so AI adds no value), and no clear alternate use case emerges | Sunset AdvisorReport, apply learning to adjacent problem in the RIA workflow |


Open Questions

  1. Do advisors need to upload one CSV per client or one consolidated CSV for all clients? This affects the parser architecture and the UX for advisors with 100+ clients.
  2. Are there standard column headers across Schwab and Fidelity CSV exports, or does each custodian use different field names? Answer needed before parser development begins.
  3. What is the minimum viable disclaimer language that advisors need on each report to satisfy their individual compliance obligations? This affects the template design.
Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.