Sprint Triage
Clean up and categorize the backlog for sprint planning.
When to Use
- "Triage the backlog"
- "What's stale? What should we cut?"
- "Clean up the feature list"
- Before
/sprint-planwhen the backlog is messy or outdated - When coming back from a break and need to re-orient
Arguments
$ARGUMENTS can be:
- Empty — triage the full backlog
- A deadline — e.g., "for April 27 demo" — used as the categorization anchor
Triage Process
Phase 1: Load Current State
- Read
docs/features/DASHBOARD.mdfor the full backlog - Run
gh pr list --state all --limit 20to see recent PR activity - Run
git log --oneline -30to see recent commits - Check for stale items: anything with a
blocked-byreferencing a completed feature
Phase 2: Identify Stale Items
An item is stale if:
- Its
blocked-byfeature has already shipped (checkshipped.mdexistence) - The work was already done in a different PR or commit (search git log)
- The feature was organically resolved (e.g., "compiler warnings" that are now zero)
- It's been in backlog for 4+ weeks with no activity and no deadline relevance
For each stale item, present to the user:
**[feature-id]** — [reason it's stale]
Recommend: [close / update / keep]
Do NOT auto-close anything. Present findings and let the user decide.
Phase 3: Verify PR/Branch State
For features that reference PRs or branches:
- Check if the PR is merged, open, or closed:
gh pr view <number> --json state - Check if the branch exists:
git branch -r --list '*feature-name*' - Flag mismatches: "Plan says to merge PR #97, but it was merged 3 days ago"
Phase 4: Categorize
Given a deadline, sort every non-stale backlog item:
| Bucket | Criteria |
|--------|----------|
| Deadline-Critical | Without this, the demo/release fundamentally fails. Not "nice to have" — MUST have |
| This Sprint | Important, achievable, and relevant to the deadline context, but the deadline doesn't fail without it |
| Post-Deadline | Too large, not relevant, blocked, or lower priority. Explicitly say WHY it's deferred |
Categorization rules:
- Ask "if this isn't done, does the deadline event fail?" — if no, it's not critical
- Items with effort "Large" that haven't started are almost never deadline-critical this week
- Design spikes are "this sprint" at most — scope to design doc, not implementation
- Items blocked by external teams/infrastructure go to post-deadline unless the blocker resolves this sprint
Phase 5: Present Results
## Triage Results
### Stale Items (recommend closing)
| ID | Reason | Action |
|----|--------|--------|
### Deadline-Critical (must ship by [date])
| ID | Priority | Effort | Rationale |
|----|----------|--------|-----------|
### This Sprint
| ID | Priority | Effort | Rationale |
|----|----------|--------|-----------|
### Post-Deadline (deferred)
| ID | Priority | Rationale for deferring |
|----|----------|------------------------|
Phase 6: Get Confirmation
Ask the user to confirm:
- Which stale items to close (offer to create
shipped.mdfiles) - Whether the categorization is correct
- Any items they want to move between buckets
Anti-Patterns
- Don't assume priority = criticality. A P1 item might not be deadline-critical if the deadline is a demo and the feature isn't demo-relevant
- Don't keep zombie items alive. If something's been in backlog for 6 weeks with no progress and no deadline, recommend closing it
- Don't create new items during triage. Triage is about cleaning and categorizing, not adding. Use
/feature-capturefor new items - Don't re-add removed items. If the user closes something during triage, it stays closed. Period.
Integration Notes
Works with:
/feature-status— quick overview before deep triage/sprint-plan— takes triage output as input for planning/feature-ship— use to close stale items the user confirms