Sprint plan

From schuettc/claude-code-plugins · View interactive version

Sprint plan is an AI agent skill from the GitHub repository schuettc/claude-code-plugins. Create a weekly sprint plan from backlog and deadline. Triages features into deadline buckets, assigns owners by expertise lane, identifies critical path, and produces a shareable plan file. Use when starting a new sprint or preparing for a demo/release.

How to use this skill

Skill file

Sprint Plan

Create a weekly sprint plan from the current backlog, team roster, and driving deadline.

When to Use

Arguments

$ARGUMENTS can be:

Critical Principles

These are hard-won lessons from real sprint planning. Follow them strictly:

1. Verify State Before Planning

Never plan work around assumed state. Before assigning any task:

2. Single Source of Truth

If you find duplicate tracking systems (multiple dashboards, overlapping docs, parallel backlogs):

3. Respect Removals

When the user removes a task or says "we don't want this":

4. Junior Devs Need Self-Service Specs

Tasks assigned to junior developers MUST include enough context for independent work:

5. Critical Path First

Identify which tasks block other tasks. Assign blockers to senior devs. Assign parallelizable leaf work to junior devs that feeds into senior work streams.

Workflow

Phase 1: Gather Context

  1. Read the backlog: Look for docs/features/DASHBOARD.md (feature-workflow plugin) or equivalent backlog
  2. Check branch state: Run git status, git log --oneline -20, gh pr list --state all --limit 10
  3. Check for existing plans: Look for plan files, sprint docs, or next-steps docs in the repo
  4. Ask the user (if not provided):

Phase 2: Triage Backlog

Categorize every backlog item into exactly one bucket:

| Bucket | Criteria | Action |

|--------|----------|--------|

| Deadline-Critical | Must be done for the deadline to succeed. Failure = demo/release fails | Assign to senior devs, track daily |

| This Sprint | Important and achievable this week, but not a blocker for the deadline | Assign based on skill match |

| Post-Deadline | Nice to have, too large, blocked, or not relevant to deadline | Explicitly defer with rationale |

Triage rules:

Phase 3: Assign Work

Create ownership lanes based on team structure:

Senior devs get:

Junior devs get:

Assignment format per person:

### [Name]: [Lane Description]
- `feature-id` (Priority, Effort) — one-line context on what to do
- `feature-id` (Priority, Effort) — one-line context
- Dependencies: what they need from others, what others need from them

Phase 4: Identify Dependencies

Draw the dependency graph:

Phase 5: Write the Plan

Create or update a plan file. Recommended location: .claude/plans/ or a project-specific docs directory.

Plan structure:

# Sprint Plan: [Week/Date Range]

## Context
[Driving event, deadline, what success looks like]

## Team
[Names, roles, availability notes]

## Branch State
[Current branch, what's merged, open PRs, stale PRs]

## Triage Summary
| Bucket | Count | Key Items |
|--------|-------|-----------|

## Deadline-Critical Items
[Table with ID, owner, effort, dependencies]

## This Sprint Items
[Table with ID, owner, effort, dependencies]

## Deferred (Post-Deadline)
[Table with ID and rationale for deferring]

## Team Assignments
[Per-person sections with assigned features]

## Dependencies & Critical Path
[Dependency chain, blocking relationships]

## Verification (before deadline)
[Checklist of what "done" looks like]

## Open Questions
[Things that need answers from stakeholders]

Phase 6: Validate Specs

Before finalizing, run the equivalent of /sprint-audit-specs:

Output

Present the plan to the user for review. Highlight:

Integration Notes

Works with:

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.