Contractor evaluation

From FerroxLabs/murage · View interactive version

Contractor evaluation is an AI agent skill from the GitHub repository FerroxLabs/murage. Provides a structured framework for evaluating and selecting home service contractors including roofers, plumbers, electricians, HVAC technicians, and general contractors. Covers vetting criteria, bid comparison, red flags, contract essentials, and payment structures. Use when the user needs to hire

How to use this skill

Skill file

Contractor Evaluation

When to Use

Use this skill when the user presents one of these specific situations:

Do NOT use this skill when:


Process

Step 1: Define Project Scope and Context

Before generating any evaluation framework, gather the specifics that determine which criteria apply.


Step 2: Generate the Contractor Vetting Checklist

Vetting is not optional -- it is the step that separates legitimate contractors from fraudulent or incompetent ones. Provide the following verification steps customized to the trade.


Step 3: Create the Bid Comparison Framework

A bid comparison is only valid when bids cover identical scope. This is the most common mistake homeowners make -- comparing a bid that includes everything to a bid that excludes critical components.


Step 4: Provide the Red Flag and Green Flag Assessment

Flags are behavioral and documentation signals that predict contractor reliability. Present both categories.

Red Flags -- each one independently warrants caution; multiple flags together are disqualifying:

Green Flags -- positive indicators of professionalism:


Step 5: Generate the Contract Essentials Checklist

A written contract is legally required for home improvement work over a certain dollar threshold in most states (often $500-$1,000). But even for smaller projects, a written agreement protects both parties.


Step 6: Outline Payment Structure Guidelines

Payment schedules are a risk management tool. The structure should align the contractor's incentive to complete work with the homeowner's ability to withhold payment if work is deficient.


Step 7: Construct the Lien Risk and Legal Exposure Briefing

This step is often overlooked but protects homeowners from a major financial risk.


Step 8: Summarize Decision Recommendation and Next Steps

After presenting the framework, give the user a concrete recommendation.


Output Format

## Contractor Evaluation: [Project Type] -- [Brief Scope Description]

**Project:** [Specific scope, e.g., "Full roof replacement, approx. 1,800 sq ft, 6:12 pitch, 2 story"]
**Bid Range Received:** $[low] -- $[high] ([X]% spread)
**Expected Market Range:** $[low] -- $[high] for this project type and region
**Permits Required:** Yes / No / Likely -- [specific permit types]
**Urgency Level:** Emergency / Urgent / Planned

---

### Vetting Checklist

Complete this for every contractor before comparing bids.

| Verification Step | How to Check | Contractor A | Contractor B | Contractor C |
|-------------------|-------------|-------------|-------------|-------------|
| License -- active and correct classification | State licensing board online lookup | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |
| General liability insurance ($[X] minimum) | Request COI; call carrier to verify | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |
| Workers' comp (if employees) | Request COI; verify classification code | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |
| Business entity -- verified active | State Secretary of State lookup | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |
| References (3 minimum, similar work) | Direct phone calls | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |
| Online reputation (pattern check) | Google, BBB, state AG complaint database | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |
| [Trade-specific check] | [Method] | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

**Vetting Result:** Contractor A: [PASS / CONDITIONAL / FAIL] | Contractor B: [PASS / CONDITIONAL / FAIL] | Contractor C: [PASS / CONDITIONAL / FAIL]

---

### Bid Comparison -- Scope Alignment Matrix

Before comparing prices, confirm every bid covers the same scope.

| Scope Element | Contractor A ($[amount]) | Contractor B ($[amount]) | Contractor C ($[amount]) | Notes |
|---------------|-------------------------|-------------------------|-------------------------|-------|
| [Component 1] | Included / Excluded / Unknown | Same | Same | [What this means if excluded] |
| [Component 2] | Included / Excluded / Unknown | Same | Same | [Impact on quality or longevity] |
| [Material grade/spec] | [Specific product or grade] | Same | Same | [Quality/warranty trade-off] |
| [Permit fees] | Included / Excluded | Same | Same | [Risk if excluded] |
| [Warranty -- workmanship] | [X years] | [X years] | [X years] | [What is standard for this trade] |
| [Warranty -- materials] | [X years, manufacturer] | Same | Same | [Manufacturer warranty tier] |
| [Cleanup / disposal] | Included / Excluded | Same | Same | -- |

**Scope-Adjusted Prices:** After accounting for what is and is not included, the effective cost for identical scope is:
- Contractor A: $[adjusted amount] ([reason for adjustment])
- Contractor B: $[adjusted amount]
- Contractor C: $[adjusted amount]

---

### Red Flag Assessment

| Red Flag | Contractor A | Contractor B | Contractor C |
|----------|-------------|-------------|-------------|
| Requires >30% deposit upfront | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |
| Cannot provide license or COI | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |
| Verbal bid only / no written proposal | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |
| Suggests skipping permit | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |
| High pressure / same-day pressure | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |
| [Trade-specific red flag] | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

**Red Flag Count:** A: [X] | B: [X] | C: [X]

---

### Contract Checklist (for Selected Contractor)

- [ ] Full legal names and business entity of contractor, with license number
- [ ] Contractor's insurance carrier and policy numbers for GL and WC
- [ ] Detailed scope of work with specific materials (brand, grade, model numbers where applicable)
- [ ] Start date and projected completion date with delay provisions
- [ ] Total contract price with line-item breakdown
- [ ] Payment schedule tied to verifiable milestones (listed below)
- [ ] Change order clause: written authorization required before any scope changes
- [ ] Permit responsibility assigned to contractor
- [ ] Cleanup and disposal included
- [ ] Workmanship warranty: [X] years covering [specific defects]
- [ ] 3-day right of rescission (if signed in your home)
- [ ] Lien waiver provision with each progress payment
- [ ] Dispute resolution process

---

### Payment Schedule

| Milestone | % of Total | Amount | Trigger Condition |
|-----------|-----------|--------|-------------------|
| Deposit -- contract signing | [X%] | $[amount] | Contract signed and returned |
| [Milestone 2 -- materials or mobilization] | [X%] | $[amount] | [Specific verifiable event] |
| [Milestone 3 -- mid-project] | [X%] | $[amount] | [Specific verifiable event, e.g., "rough-in inspection passed"] |
| [Milestone 4 -- near completion] | [X%] | $[amount] | [Specific verifiable event] |
| Final payment | [X%] | $[amount] | Punch list signed off, permit closed, all lien waivers received |

---

### Recommendation

**Recommended Contractor:** [Contractor name/letter]
**Rationale:** [Specific reasons: vetting results, bid value, materials, warranty, references]
**Before Signing:** [Specific items to negotiate or clarify]
**Payment Alert:** [Flag any deposit that exceeds guidelines]
**Lien Risk Level:** Low / Medium / High -- [brief explanation]

Rules

  1. Never recommend a specific contractor, service platform, or referral service by name. This includes aggregator platforms, labor marketplaces, and review sites -- they may be mentioned as research tools but never endorsed as a hiring mechanism.
  1. Three bids is the minimum standard for any project over $1,000. For projects over $25,000, four to five bids are advisable. Bids obtained from the same referral service are less independent than bids sourced through separate channels -- note this when it applies.
  1. Deposit limits are hard rules, not suggestions. Never advise a homeowner that a deposit over 30% is acceptable for a project under $15,000, regardless of what the contractor claims is "standard practice." The only legitimate exception is a documented materials deposit tied to a specific purchase order, and even then the deposit should not exceed the documented material cost.
  1. License verification must be done independently through official state databases, not by accepting a contractor-provided license number at face value. A license number can be fabricated, expired, or held by a different entity than the one performing the work. The lookup takes 3 minutes and is non-negotiable.
  1. COI verification requires a phone call to the insurance carrier, not just reviewing the document. COIs can be forged. The 90-second call to the carrier's certificate verification line eliminates the most common insurance fraud scenario. Remind the user to request that they be named as an additional insured on the policy.
  1. Permit responsibility belongs to the contractor by default. If a contractor suggests the homeowner pull the permit, or suggests skipping the permit entirely, this is a red flag. When a homeowner pulls a permit for contractor work, the homeowner assumes liability for the work quality and becomes responsible for ensuring code compliance -- a role they are not equipped to perform. Unpermitted work becomes a disclosure liability at resale and can be ordered demolished by the building department.
  1. Lien waivers are required for any project involving subcontractors or material suppliers. For projects over $10,000, always advise the user to obtain conditional lien waivers with every progress payment and unconditional final waivers upon project completion. Paying a GC in full does not protect the homeowner from subcontractor liens.
  1. Change orders must always be in writing before work proceeds. Verbal change orders are a leading cause of contractor disputes. A contractor who says "don't worry, we'll sort it out at the end" on scope changes is setting up a dispute. Every change to scope -- even a small one -- should result in a written change order signed by both parties before the work is done.
  1. The final payment (10-15%) should never be released until three conditions are met: the punch list walkthrough is complete and all items are resolved, all required permit inspections are passed and permits are officially closed with the building department (not just scheduled), and all unconditional lien waivers from the contractor and major subcontractors are received in hand. Releasing final payment early eliminates all leverage.
  1. An unusually low bid (25%+ below median) must be interrogated, not celebrated. Ask the contractor to walk through specifically how they arrive at the lower price. Acceptable explanations include: lower overhead (home-based business, smaller crew), off-season pricing, or different material selection that the homeowner consciously chooses. Unacceptable explanations include: skipping permits, using unlicensed subcontractors, omitting scope elements, or vague claims about "efficiency." If the low bidder cannot explain the gap clearly, the risk outweighs the savings.
  1. For any project over $50,000, recommend the homeowner consult with a construction attorney before signing the contract. This is not because anything is necessarily wrong -- it is because the financial stakes warrant it, and a one-hour attorney review at $250-$400 is inexpensive insurance against a $50,000+ exposure.
  1. Never advise a homeowner to pay in cash. Cash payments eliminate the paper trail that proves payment was made, cannot be reversed if fraud occurs, and make lien waiver documentation harder to enforce. Payment by check (with "payment for [milestone], contract dated [date]" in the memo line) or credit card is always preferable.

Edge Cases

Emergency Repair (Cannot Solicit 3 Bids)

When time pressure is genuine -- burst pipe flooding the house, failed furnace in a winter storm, structural hazard after wind or tree damage, active roof leak during rain -- the standard vetting timeline is not feasible. Handle this situation systematically rather than abandoning vetting entirely.

Compress but do not eliminate: verify the license by phone or quick online lookup before signing anything (5 minutes); get a verbal COI confirmation from the contractor's insurance broker if the certificate is not immediately available; agree on a written scope of work and maximum cost cap before any work begins (a text message exchange or a written estimate with a not-to-exceed number is legally valuable). Photograph everything before, during, and after work begins. Agree explicitly that any additional scope beyond the emergency repair requires a separate written agreement. Plan to get a second opinion or independent assessment on any follow-up work that is not time-critical.

For emergency-triggered insurance claims, do not let the emergency contractor serve as both the repair contractor and the scope/damage expert -- insurance adjusters will provide their own assessment, and some emergency contractors inflate scope when the homeowner is distressed.

Single Bid (User Cannot Find Additional Bidders)

Some project types have thin contractor supply in certain markets -- specialty work like structural masonry, historic restoration, or specific HVAC brands in rural areas may produce only one available bidder. When this occurs: use pricing databases (RSMeans residential cost data, local supplier pricing for materials) to validate the bid from the cost-buildup direction rather than competitive comparison. Ask the single contractor to provide a detailed materials and labor breakdown so you can assess whether the markup is reasonable. Consult a local building materials supplier or a retired tradesperson for informal price benchmarking. Accept the single bid with a fully negotiated contract rather than rushing into an unprotected verbal agreement.

Storm Chasing / Disaster Solicitation Contractors

After hurricanes, hail storms, ice storms, and tornadoes, out-of-state contractor teams flood affected areas. These "storm chasers" can be legitimate crews filling genuine demand -- or predatory operations that take deposits and disappear. Identifying markers: vehicles with out-of-state plates, no local business address, unfamiliar company names not found in any online records, pressure to sign the same day. Protocol: require a local business address (not a hotel), verify the license is valid in the state where the work is being performed (not just their home state -- contractor licensing does not always transfer), verify insurance includes work in the project state, do not pay a deposit until a signed contract is in hand and a 3-day right of rescission has passed, and file the contractor's information with your state's insurance commissioner if they are working insurance claims.

Mid-Project Contractor Failure (Contractor Stops Showing Up, Goes Silent, or Demands More Money)

This scenario is unfortunately common and requires a different response than the pre-hire evaluation. If a contractor has received progress payments but work has stalled: document the project status with timestamped photographs immediately; send a written notice (certified mail and email) stating the contractor is in default and setting a specific cure deadline (typically 5-10 business days); consult the contract's dispute resolution clause; contact the contractor's licensing board to file a complaint (this can sometimes motivate a contractor to complete work); contact the contractor's surety bond if they are bonded (the bond is a financial guarantee of performance); and consult a construction attorney before releasing any final payment or making any additional payments. Do not hire a new contractor to complete the work without first documenting the existing contractor's default in writing -- you need that record if you pursue recovery of the overpayment.

Homeowner Acting as Own General Contractor (Owner-Builder)

Some homeowners with project management experience want to hire individual subcontractors directly rather than paying a GC's 15-25% markup. This is legally permitted in most states (often requiring an owner-builder disclosure or permit) but carries significant responsibility: the homeowner must coordinate all trades in the correct sequence (framing before rough-in; rough-in before insulation; insulation before drywall); schedule inspections at the correct milestones; ensure each sub is licensed and insured; manage lien exposure from each sub directly; and carry owner-builder liability for work quality at resale. This approach is only advisable for homeowners with strong organizational skills, trade knowledge sufficient to evaluate work quality, and time availability during the project. It is not appropriate for first-time renovators or homeowners with full-time jobs and no construction background.

Bid Includes Allowances (Rather Than Specified Materials)

Many renovation bids include "allowances" -- placeholder amounts for materials the homeowner will select (tile, fixtures, flooring, cabinetry hardware). An allowance of "$2,500 for tile" means the contractor priced labor around that budget; if the homeowner selects tile that costs $4,000, the total contract price increases by $1,500. Allowances are common and not inherently suspicious, but they make bid comparison difficult. Protocol: ask each contractor to specify the allowance amounts and what labor is assumed for each allowance (installation of 3/8" tile vs. 3/4" stone has different labor costs). When comparing bids with allowances, use the same hypothetical material selection for all bidders to create an apples-to-apples comparison. Flag allowances that seem unrealistically low -- a $500 allowance for kitchen countertops on a full kitchen renovation is a pricing tactic, not a realistic budget.

Contractor Requires a Signed Contract Before Providing COI or License Documentation

This is a manipulation tactic. No legitimate contractor should require a homeowner to sign anything before providing documentation of their credentials. The correct response: politely decline to sign until documentation is in hand and verified, and explain that this is standard practice for any homeowner. A contractor who walks away at this request has disqualified themselves.


Example

User Input: "I have three bids to replace my central AC unit. One is $4,200, one is $6,800, and one is $8,900. I don't know anything about HVAC and I'm not sure which to go with or if these prices are even reasonable."

AI Output:


Contractor Evaluation: HVAC Replacement -- Central AC Unit (Split System)

Project: Replace existing central air conditioning system (condenser and air handler / coil), approximately 2,000 sq ft single-story home, unknown current tonnage until confirmed

Bid Range Received: $4,200 -- $8,900 (112% spread -- requires detailed comparison before any decision)

Expected Market Range: $4,500 -- $10,000 for a 3-ton central AC system replacement depending on equipment tier, region, and installation complexity; the spread in your bids is large but not outside the possible market range if different equipment tiers are being quoted

Permits Required: Yes -- HVAC equipment replacement requires a mechanical permit in most jurisdictions; electrical work on the disconnect or panel may require an additional electrical permit

Urgency Level: Assess and confirm with user -- if current AC is functional, this is a planned project with time to vet fully; if it has failed in summer heat, urgency changes the approach

First, a critical question before comparing prices: Do all three bids specify the exact equipment being installed? If Contractor A ($4,200) is quoting a 14 SEER 2.5-ton unit and Contractor C ($8,900) is quoting a 18 SEER 3-ton variable-speed system, these are fundamentally different products -- not the same job at different prices. Get the equipment model number or at minimum the brand, SEER rating, and tonnage from each contractor before proceeding.


Vetting Checklist

Complete every row for all three contractors before comparing prices. Prices mean nothing if a contractor is unlicensed or uninsured.

| Verification Step | How to Check | Contractor A ($4,200) | Contractor B ($6,800) | Contractor C ($8,900) |

|-------------------|-------------|----------------------|----------------------|----------------------|

| HVAC contractor license -- active, correct classification | State licensing board website, search by company name and license number | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

| EPA Section 608 refrigerant handling certification | Ask for technician certification number; EPA maintains a public lookup | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

| General liability insurance ($500K minimum) | Request COI; call carrier to confirm active policy | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

| Workers' compensation | Request COI; verify if they have employees | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

| Business entity -- registered and active (2+ years) | State Secretary of State lookup | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

| NATE certification (quality indicator, not required) | Ask for NATE technician ID; check NATE directory | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

| References -- 3 similar HVAC replacements in last 18 months | Direct phone calls | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

| Online reputation -- pattern check | Google, BBB, state AG consumer database | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail | ☐ Pass / ☐ Fail |

What to say to each contractor: "Before I make a decision, I need a copy of your contractor's license number and a Certificate of Insurance showing your general liability and workers' comp coverage. Can you send those over?" Any contractor who hesitates, argues, or fails to provide these within 24 hours has disqualified themselves.


Bid Comparison -- Scope Alignment Matrix

HVAC bids vary dramatically based on equipment specification and scope inclusions. The following matrix asks the specific questions that explain your $4,700 price spread.

| Scope Element | Contractor A ($4,200) | Contractor B ($6,800) | Contractor C ($8,900) | Why It Matters |

|---------------|----------------------|----------------------|----------------------|----------------|

| Equipment brand and model | [Ask for specifics] | [Ask for specifics] | [Ask for specifics] | Brand-tier and model determine efficiency, reliability, and warranty. Budget brands (Goodman, Ameristar) are legitimate but different from mid-tier (Carrier, Trane, Lennox) and carry different warranties. |

| Tonnage | [X ton] | [X ton] | [X ton] | Undersizing saves money at install but strains the system; oversizing wastes money and causes humidity problems. All three should quote the same tonnage -- if they differ, ask how they sized the system. A Manual J load calculation is the professional standard. |

| SEER rating (efficiency) | [X SEER] | [X SEER] | [X SEER] | Federal minimum is 14 SEER (South) / 13 SEER (North) as of 2023; new federal SEER2 standards apply to new equipment. A 16 SEER unit uses ~12% less electricity than a 14 SEER unit -- this has a payback period of approximately 5-7 years on a typical cooling bill. 18+ SEER variable speed units have 10-12 year payback periods. |

| Condenser replacement only vs. full system (condenser + coil + handler) | [Condenser only or full?] | [Full system?] | [Full system?] | If Contractor A is replacing only the outdoor condenser unit while B and C are replacing the entire system (including air handler/evaporator coil), the scope difference fully explains the price gap. Mismatched systems (new condenser with old coil) are inefficient, may void the manufacturer warranty, and can cause premature failure. |

| Refrigerant type | [R-410A or R-454B?] | Same | Same | R-410A is being phased out under EPA regulations; new equipment as of 2025 must use R-454B (Puron Advance) or equivalent low-GWP refrigerant. If Contractor A is quoting an older R-410A unit from existing inventory, verify the equipment is current-production and that parts/refrigerant will remain available. |

| Line set replacement vs. reuse | [New or reuse?] | Same | Same | Copper refrigerant line sets can be reused if they are in good condition, correctly sized for the new equipment, and leak-free. Replacing line sets adds $300-700 but eliminates a common source of efficiency loss and early failures. |

| Disconnect box and electrical inspection | [Included?] | Same | Same | The outdoor disconnect box should be inspected and replaced if it is old, undersized, or corroded. Electrical work on the disconnect requires a licensed electrician in most states -- confirm who does this and whether it is in the bid. |

| Permit fees | [Included?] | Same | Same | Mechanical permits for HVAC replacement typically cost $75-250 depending on jurisdiction. If excluded from one bid, add it to the comparison price. |

| Refrigerant charge and startup commissioning | [Included?] | Same | Same | Proper startup requires charging the system to manufacturer specifications, verifying superheat and subcooling, and documenting equipment performance. This is a 1-2 hour process. A contractor who does a 30-minute install and leaves without commissioning is cutting corners. |

| Removal and disposal of old equipment | [Included?] | Same | Same | Old equipment contains refrigerant (legally required to be recovered, not vented) and must be properly disposed of. Disposal should be in every bid. |

| Equipment warranty -- parts | [X years] | Same | Same | Base manufacturer warranties are typically 5 years parts; registered warranties (requires contractor to register the equipment online within 60-90 days of installation) extend to 10 years on parts for most major brands. Confirm the contractor will register the warranty. |

| Workmanship warranty | [X years] | Same | Same | Standard residential HVAC workmanship warranty is 1-2 years; good contractors offer 5 years. |

Scope-Adjusted Price Analysis (example scenario):

Assume the investigation reveals:

Scope-adjusted comparison:

Preliminary recommendation based on scope analysis: Contractor B likely represents the best combination of value and completeness. Contractor A's low bid appears to be a different product (partial replacement), not a cheaper price for the same work.


Red Flag Assessment

| Red Flag | Contractor A ($4,200) | Contractor B ($6,800) | Contractor C ($8,900) |

|----------|-----------------------|-----------------------|-----------------------|

| Requires >30% deposit upfront | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

| Cannot provide license or COI promptly | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

| Verbal/lump-sum bid only -- no line items | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

| Cannot confirm EPA 608 certification | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

| Suggests skipping mechanical permit | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

| Will not register manufacturer warranty | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

| Proposes mismatched system without disclosure | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

| No references or references don't answer | ☐ Yes ☐ No | ☐ Yes ☐ No | ☐ Yes ☐ No |

Notes on HVAC-specific red flags:


Contract Checklist (for Selected Contractor)

Before any work begins, confirm the contract includes every item below.


Payment Schedule for a $6,800 HVAC Replacement

| Milestone | % of Total | Amount | Trigger Condition |