NaCl BA Full For Codex
Coordinate full BA graph creation without assuming a separate isolated runner.
BA artifacts remain Russian where the NaCl methodology requires Russian.
Read ../references/orchestration-model.md,
../references/migration-rules.md, ../references/verification-vocabulary.md,
../references/ba-codex-contract.md, and ../nacl-core/SKILL.md before
executing this skill.
Goal Boundary
This skill is not safe to wrap in /goal because BA completion includes the
mandatory BA-to-SA handoff judgment gate. Use this skill interactively, then
use a goal-wrapped verification alias only after the gate is complete.
Reference ../nacl-goal/SKILL.md,
../references/goal-codex-contract.md, and
../../nacl-goal/refusal-catalog.md. The refusal code is
REFUSE_HUMAN_GATE_BA_SA_HANDOFF. Do not provide bypass flags. If autonomous
execution is requested, report Status: BLOCKED or Status: NOT_RUN.
Contract
Inputs consumed:
- user-provided business facts, goals, boundaries, constraints, and open
questions;
- existing BA graph records when graph access is available;
- BA graph schema and query references when file access is available;
- downstream phase reports using the closed verification vocabulary.
Outputs produced:
- phased BA progress report using only the closed vocabulary;
- graph change requests or graph updates when graph tooling is available and
confirmed;
- reviewed downstream output summaries for each phase;
- BA-to-SA handoff readiness report.
Downstream consumers:
- human user;
- SA workflow;
- publishing workflow;
- graph query or visualization workflows.
Orchestration Rules
- Use the shared Codex orchestration procedure from
../references/orchestration-model.md.
- Apply the BA orchestrator contract from
../references/ba-codex-contract.md. - Each phase handoff must state inputs consumed, expected graph output, allowed
verification status, downstream consumer, and handling for VERIFIED,
FAILED, PARTIALLY_VERIFIED, BLOCKED, NOT_RUN, and UNVERIFIED.
- Run, invoke, or simulate downstream procedures only when the current Codex
environment supports the needed tools.
- Collect and inspect downstream output before changing progress state or
opening the next phase gate.
- Stop after each phase and ask the user whether to proceed to the next phase.
- Do not write graph data, modify files, publish, or move to the next major
phase without explicit user confirmation.
- Never mark a delegated phase complete until its output has been inspected and
its graph or graph-ready evidence is compatible with the phase contract.
Workflow
Phase 0: Resume And Scope
Check config.yaml, schema availability, and graph tool availability when file
or graph access exists. Detect existing BA graph state for SystemContext,
ProcessGroup, BusinessProcess, WorkflowStep, BusinessEntity,
BusinessRole, GlossaryTerm, BusinessRule, ValidationReport, and
HandoffPackage.
Report detected state with closed vocabulary. Stop and ask the user to confirm
the starting phase.
If graph tools are unavailable, Phase 0 must still inspect file-based schema and
query references where possible, then report graph state as BLOCKED or
UNVERIFIED and continue only with a graph-ready plan approved by the user.
Phase 1: Context
Use the nacl-ba-context procedure when the current environment can execute
that specialist contract; otherwise run the same phase locally and report the
missing mechanism as BLOCKED or UNVERIFIED.
Contract:
- Inputs: user facts, current graph state, BA schema.
- Expected output:
SystemContext,Stakeholder,ExternalEntity, and
DataFlow records or a graph-ready change plan.
- Downstream consumer: process discovery.
- Gate: review scope, stakeholders, external entities, and data flows with the
user before Phase 2.
Phase 2: Business Processes
Coordinate process group and business process creation.
Contract:
- Inputs: confirmed context, business goals, stakeholder interactions.
- Expected output:
ProcessGroup,BusinessProcess, and process relationship
records or a graph-ready change plan.
- Downstream consumer: workflow decomposition.
- Gate: review process map coverage before Phase 3.
Phase 3: Workflows
For each decomposed business process, coordinate workflow creation sequentially.
Contract:
- Inputs: confirmed business process, actors, artifacts, decisions, and known
automation candidates.
- Expected output:
WorkflowSteprecords and workflow relationships or a
graph-ready change plan.
- Downstream consumer: business entity and role catalogs.
- Gate: review each workflow before starting the next workflow or Phase 4.
Phase 4: Business Entities
Coordinate business object cataloging from workflows and user facts.
Contract:
- Inputs: confirmed workflows and referenced artifacts.
- Expected output:
BusinessEntity,EntityAttribute,EntityState, and
entity-process relationship records or a graph-ready change plan.
- Downstream consumer: role, glossary, and rule phases.
- Gate: review entity catalog and matrix before Phase 5.
Phase 5: Business Roles
Coordinate role discovery and role-process mapping.
Contract:
- Inputs: confirmed processes, workflows, actors, and responsibilities.
- Expected output:
BusinessRolerecords and role relationship records or a
graph-ready change plan.
- Downstream consumer: glossary, rules, and SA role mapping.
- Gate: review role registry and responsibility coverage before Phase 6.
Phase 6: Glossary
Coordinate glossary construction and synonym resolution.
Contract:
- Inputs: confirmed BA graph terms, user terminology, and unresolved wording.
- Expected output:
GlossaryTermrecords and terminology relationships or a
graph-ready change plan.
- Downstream consumer: validation and publication.
- Gate: review terms and definitions before Phase 7.
Phase 7: Business Rules
Coordinate business rule extraction, classification, and binding.
Contract:
- Inputs: confirmed workflows, entities, roles, glossary, constraints, and
calculations.
- Expected output:
BusinessRulerecords and rule binding relationships or a
graph-ready change plan.
- Downstream consumer: validation and BA-to-SA handoff.
- Gate: review rule catalog before Phase 8.
Phase 8: Validation
Run available BA validation procedures against the graph or graph-ready plan.
Check process completeness, workflow completeness, actor binding, artifact
binding, entity-process coverage, role-process coverage, glossary coverage, and
business rule binding.
Report each check with the closed vocabulary. Critical findings require a user
decision before fixes are applied or the workflow advances.
Validation is read-only. Repairs must be routed back through the owning writer
skill and confirmed before any mutation.
Phase 9: BA-To-SA Handoff
Coordinate traceability and SA readiness preparation.
Contract:
- Inputs: validated BA graph or graph-ready plan.
- Expected output:
HandoffPackage, traceability relationships, automation
scope, and proposed SA grouping.
- Downstream consumer:
nacl-sa-full. - Gate: review handoff readiness before optional publishing or completion.
Phase 10: Publish Option
Publishing is optional. Run it only when publishing tools are available and the
user confirms.
If publishing is not executed, report NOT_RUN with reason. If publishing output
cannot be checked, report UNVERIFIED.
Capabilities
May Do
- Coordinate full BA graph creation through phase contracts and gates.
- Read workspace configuration, schemas, queries, and existing graph state when
available.
- Use supported graph tools or downstream procedures only after checking that
the current environment can execute them.
- Review downstream output before advancing workflow state.
Must Not Do
- Assume isolated delegation exists.
- Select or constrain the runtime.
- Modify source root skill folders.
- Write graph data, edit files, publish, or advance major phases without user
confirmation.
- Use statuses outside the closed verification vocabulary.
Conditional Tools And Actions
- Graph reads and writes require available graph tooling and confirmed scope.
- File reads require workspace access.
- File edits require writable workspace access and explicit user confirmation.
- Publishing requires configured publishing tooling and explicit user
confirmation.
- Delegation is conditional on Codex-supported mechanisms available in the
current environment.
Blocked Or Unverified Reporting
- Use
BLOCKEDwhen required inputs, tools, permissions, infrastructure, or
confirmation are unavailable.
- Use
NOT_RUNwhen a phase is intentionally not executed. - Use
PARTIALLY_VERIFIEDwhen only some required checks ran. - Use
UNVERIFIEDwhen downstream output or graph state cannot be checked. - Use
FAILEDwith a reason when a phase violates its contract.
Source Comparison
- Source Claude skill path:
../../nacl-ba-full/SKILL.md
Preserved Methodology
- Ten-phase BA graph workflow from context through handoff and optional publish.
- User facts as the authority and user confirmation after each phase.
- Graph-first BA artifacts and BA-to-SA traceability.
- Resume detection and validation before handoff.
Removed Claude Mechanics
- Runtime routing fields in frontmatter.
- Assumed isolated phase execution.
- Source-specific execution commands for unsupported delegation.
- Open-ended status labels outside the closed vocabulary.
Codex Replacement Behavior
- Coordinate phases with explicit contracts and inspected outputs.
- Treat graph, file, publishing, and delegation actions as conditional.
- Preserve every major phase as a user-facing confirmation gate.
- Report blocked, incomplete, not-run, or unchecked outcomes with the closed
vocabulary.