Triad Derivations — Computed Outputs from the Triangle
The Triad (VISION.md, SPEC.md, BUILDING.md) is a normalized data store. These commands are views — computed fresh from the three source documents every time. Nothing is cached. Nothing goes stale.
Core Principle
Every derived output is a function of deltas between the three documents:
VISION - SPEC = gap (what doesn't exist yet)
SPEC - BUILDING = undocumented work (exists but not journaled)
BUILDING -> VISION = trajectory (converging or drifting?)
BUILDING velocity = momentum (what ships fast vs. slow)
The three documents dictate priority, order, and urgency. No human maintains a separate roadmap or status page. The triangle produces them.
Command: `/roadmap`
Function: f(VISION, SPEC, BUILDING) — Prioritized list of what to build next.
Algorithm
- Read all three documents into context.
- Extract the gap: Every VISION pillar marked UNREALIZED or PARTIAL that has no matching SPEC capability = roadmap item.
- Score each item for priority using three signals:
| Signal | Source | Weight | How to Extract |
|--------|--------|--------|----------------|
| Dependency depth | VISION | High | Does this pillar unblock other pillars? Are other pillars described as depending on it? Foundational items score higher. |
| Momentum | BUILDING | Medium | How many recent BUILDING entries reference or point toward this item? Recent activity = active energy = higher priority. |
| Distance from done | SPEC | Medium | For PARTIAL items: how much capability already exists? Items closer to done (higher partial %) are cheaper to finish = higher priority. |
| Recency signal | BUILDING | Low | When was this last mentioned in BUILDING? Stale items (no mention in 30+ days) deprioritize unless they're foundational. |
- Sort by composite score (dependency > momentum > distance > recency).
- Group into tiers:
- Now — highest priority, has momentum, foundational
- Next — medium priority, dependencies met, no active blockers
- Later — low priority, blocked by other items, or no momentum signal
Output Format
ROADMAP — [PROJECT] — [DATE]
Derived from: VISION.md (evolved [date]) + SPEC.md (reconciled [date]) + BUILDING.md
Distance: [X]% ([N]/[M] pillars realized)
--- NOW ---
1. [Pillar/Item] — [why it's first: dependency + momentum signals]
Gap: [what VISION says] vs [what SPEC has]
Momentum: [BUILDING references]
Effort estimate: [small/medium/large based on gap size]
2. ...
--- NEXT ---
3. ...
--- LATER ---
5. ...
BLOCKED:
- [Item] — blocked by [dependency]. Unblocks when [condition].
- Do NOT create a file. This is ephemeral output. If Eddie wants it saved, he'll say so.
Priority Override
If Eddie says "roadmap for [specific pillar]", zoom into that pillar's sub-items using SPEC capabilities as the granularity level.
Command: `/drift`
Function: f(VISION, BUILDING) — Are we building toward the vision or wandering?
Algorithm
- Read VISION.md and BUILDING.md.
- Forward mapping: For each VISION pillar, scan BUILDING for entries that advance it. Count momentum per pillar.
- Reverse mapping: For each BUILDING entry (last 30 days), check if it maps to ANY VISION pillar. Entries that don't map = potential scope creep.
- Neglect detection: VISION pillars with ZERO BUILDING momentum in 30+ days = neglected priorities.
- Contradiction detection: BUILDING entries that move in a direction the Anti-Vision warns against.
Output Format
DRIFT ANALYSIS — [PROJECT] — [DATE]
TRAJECTORY: [CONVERGING / DRIFTING / DIVERGING]
Pillar Momentum (last 30 days):
[Pillar 1]: [N] BUILDING entries — [STRONG/MODERATE/NONE]
[Pillar 2]: [N] BUILDING entries — [STRONG/MODERATE/NONE]
...
Scope Creep Candidates:
[BUILDING entry] — does not map to any VISION pillar
...
Neglected Priorities:
[Pillar] — no BUILDING momentum in [N] days
...
Anti-Vision Warnings:
[BUILDING entry] — may conflict with Anti-Vision: "[quote]"
...
Recommendation: [1-2 sentences on what to do]
Command: `/changelog`
Function: f(BUILDING, SPEC) — What shipped recently.
Algorithm
- Read BUILDING.md and SPEC.md.
- Extract recent BUILDING entries (default: since last SPEC reconciliation date, or last 14 days if no date found).
- Cross-reference with SPEC capabilities to classify each entry:
- New capability — BUILDING entry describes something now in SPEC that wasn't before
- Enhancement — BUILDING entry improves an existing SPEC capability
- Fix — BUILDING entry fixes a bug or issue
- Architecture — BUILDING entry changes infrastructure/stack
- Internal — BUILDING entry doesn't change user-facing capabilities
- Generate changelog grouped by type, most impactful first.
Output Format
CHANGELOG — [PROJECT] — [DATE RANGE]
Derived from: BUILDING.md entries since [start date]
### New
- [Capability]: [what it does, why it matters]
### Enhanced
- [Capability]: [what changed]
### Fixed
- [Issue]: [what was wrong, what was fixed]
### Architecture
- [Change]: [what moved, why]
### Internal
- [Change]: [context]
Command: `/pitch`
Function: f(VISION, SPEC) — Investor/user-facing narrative.
Algorithm
- Read VISION.md and SPEC.md.
- Extract:
- Soul statement (VISION) = the story hook
- Realized pillars (VISION) = proof points
- Key capabilities (SPEC) = what works today
- User Truth (VISION) = who this serves
- Distance metric = progress signal
- Compose a narrative that weaves vision with evidence:
- Hook: the problem (from Soul)
- Proof: what already works (from SPEC capabilities mapped to realized pillars)
- Direction: where it's going (from unrealized pillars, framed as opportunity)
- Traction: metrics from SPEC if available (users, capabilities, integrations)
Output Format
A flowing narrative paragraph structure (NOT bullet points). Suitable for:
- Investor pitch deck "product" slide
- Landing page hero copy
- Cold email product summary
- Grant application product description
Present two versions:
- Short (3-4 sentences) — elevator pitch
- Full (2-3 paragraphs) — detailed narrative
Command: `/debt`
Function: f(SPEC, VISION, BUILDING) — Technical and product debt.
Algorithm
- Read all three documents.
- Contradiction scan (SPEC vs VISION):
- SPEC capabilities that don't serve any VISION pillar = potential bloat
- SPEC architecture choices that BUILDING describes as workarounds = tech debt
- SPEC boundaries that contradict VISION edges = scope misalignment
- Workaround scan (BUILDING):
- BUILDING entries that describe workarounds, hacks, "for now" solutions, or deferred decisions
- Cross-reference with SPEC to see if they're still present
- Orphan scan (SPEC):
- SPEC capabilities with no VISION justification (no pillar serves them)
- These are features that exist but shouldn't, or whose purpose was never articulated
- Stale scan:
- SPEC capabilities not mentioned in BUILDING for 60+ days = potentially abandoned code
Output Format
DEBT REPORT — [PROJECT] — [DATE]
PRODUCT DEBT (features that shouldn't exist or conflict with vision):
- [Capability] — exists in SPEC but serves no VISION pillar
Risk: [what happens if you keep it / cost of removal]
TECHNICAL DEBT (workarounds still in place):
- [Item] — BUILDING says "[quote]", still present in SPEC
Fix: [what the proper solution would be]
SCOPE MISALIGNMENT:
- [SPEC boundary] conflicts with [VISION edge]
ORPHANED CAPABILITIES:
- [Capability] — no BUILDING momentum, no VISION justification
Recommendation: [remove / justify / investigate]
Debt Score: [LOW / MEDIUM / HIGH] based on count and severity
Command: `/onboard`
Function: f(BUILDING, SPEC) — New contributor orientation.
Algorithm
- Read BUILDING.md and SPEC.md.
- Extract from SPEC:
- Identity (what this product is)
- Architecture contract (stack, data model, integrations)
- Key capabilities (what it does)
- Boundaries (what it doesn't do)
- Extract from BUILDING:
- Major architectural decisions and WHY they were made
- Key pivots or direction changes
- Known gotchas or "we tried X but Y" entries
- Compose an onboarding guide that answers:
- What is this? (SPEC identity)
- What does it do? (SPEC capabilities, grouped)
- How is it built? (SPEC architecture)
- Why is it built this way? (BUILDING decisions)
- What should I know before touching this? (BUILDING gotchas + SPEC boundaries)
Output Format
ONBOARDING — [PROJECT]
Generated [DATE] from SPEC.md + BUILDING.md
## What This Is
[2-3 sentences from SPEC identity]
## What It Does
[Grouped capabilities from SPEC]
## How It's Built
[Architecture table from SPEC + key decisions from BUILDING]
## Why It's Built This Way
[Top 3-5 architectural decisions from BUILDING with rationale]
## Before You Touch This
[Gotchas, known issues, things that look wrong but are intentional]
## What's Off-Limits
[Boundaries from SPEC + Anti-Vision from VISION if available]
Shared Rules (All Commands)
- Always read all three documents first. Even if a command only uses two, having the third in context improves accuracy.
- Never create persistent files. These are ephemeral computed outputs. Present them in conversation. Eddie saves what he wants.
- Detect project automatically from current directory, or accept
--project <name>flag. - If any document is missing, say which one and offer to create it via
/reconcile init. - Date awareness: Convert all relative references to absolute dates. "Recently" means last 14 days. "Stale" means 30+ days.
- Voice matching: Read BUILDING.md first to match the project's voice and tone.
- No brackets. These outputs are polished, not templates.
- Respect the pipeline. If the project uses ID8Pipeline stages, reference the current stage in outputs where relevant.