Tool foundation sprint brief

From product-on-purpose/pm-skills · View interactive version

Tool foundation sprint brief is an AI agent skill from the GitHub repository product-on-purpose/pm-skills. Pre-sprint brief that locks scope, the decision the sprint must unlock, team and role assignments, logistics, inputs to bring, and success criteria before Day 1 of a Foundation Sprint. Use after the readiness verdict is Go and before the sprint begins. Produces a one-page artifact the team and Decid

How to use this skill

Skill file

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

Foundation Sprint Brief

Produce the one-page brief that aligns the team on scope, decision target, participants, logistics, and success criteria before Day 1 begins. A well-built brief prevents Day 1 from opening with re-litigation of why-are-we-here; a missing or vague brief almost guarantees it.

Family contract: CODE0. This skill is a member of foundation-sprint-skills.

When to Use

When NOT to Use

What This Skill Produces

A single bundled artifact with six sections:

  1. Initiative statement and stakes: one paragraph naming what the team is sprinting on and why a wrong direction would be costly.
  2. Decision the sprint must unlock: the open strategic question the sprint resolves. Single sentence.
  3. Team roster with role assignments: who is in the room and what role each person plays per section of the sprint.
  4. Logistics plan: dates, hours, location, format (in-person, remote, hybrid), tools, daily rhythm.
  5. Existing inputs to bring: the research, customer examples, competitor notes, metrics, and constraints the team should reference during the sprint.
  6. Readiness reaffirmation: a final check that the Go verdict from tool-foundation-sprint-readiness still holds.

See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for the Brainshelf book-catalog brief.

Inference Inputs

| Input | What the skill does with it |

|---|---|

| Readiness verdict and recommendations (from tool-foundation-sprint-readiness) | Pulls the recommended attendees, preconditions, and pre-sprint activities into the brief; flags any precondition that has not been closed |

| Initiative description | Compresses into one paragraph for the Initiative Statement section |

| Team roster | Maps people to the required Foundation Sprint roles (Decider, Facilitator, PM, Design, Engineering, Customer Expert) |

| Logistics constraints | Produces the dates/hours/location/format/tools matrix; flags any constraint that would force the sprint to extend beyond two days |

| (Optional) Skeptical-exec talking points | Tightens the Stakes paragraph to address why-now and why-this concerns |

Brief Length Discipline

The brief MUST fit on one page (or one screen). The skill enforces this through structural choices, not raw character counts:

If the brief expands beyond this scope, the sprint is being over-engineered before it starts. The fix is not a longer brief; the fix is a clearer decision target.

Common Pitfalls

Canonical Sources

Cross-Skill Usage

Prerequisites: tool-foundation-sprint-readiness. The brief expects the readiness output as its primary input. When prerequisites is honored, the brief inherits the readiness verdict, attendee recommendations, and pre-sprint activities; the skill then refines and commits them.

If the team has done equivalent prep without running the readiness skill explicitly (e.g., experienced sprint facilitator who knows the readiness criteria), the brief skill can be invoked directly. In that case, the skill body prompts the team to confirm the readiness criteria are met before generating the brief.

Next invocation in the sprint: tool-foundation-sprint-basics on Day 1 morning.

Decider Checkpoint

This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider signs off on scope (the decision target), team (the roster and role assignments), success criteria (what makes the sprint successful or not), and the explicit tradeoff that the sprint will force a top bet rather than preserve all directions. Without sign-off, the brief is advisory; with sign-off, it is the contract for the next two days.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.