Tool design sprint readiness

From product-on-purpose/pm-skills · View interactive version

Tool design sprint readiness is an AI agent skill from the GitHub repository product-on-purpose/pm-skills. Pre-sprint diagnostic that determines whether a team should run a Design Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, customer recruiting plan, and pre-sprint activities. Use when a tea

How to use this skill

Skill file

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

Design Sprint Readiness

Assess whether a Design Sprint fits the team's current situation. Design Sprint failure modes are expensive: five consecutive days of a 4-7 person team, plus customer recruiting cost (typically 5 strangers paid honoraria), plus the prototype build. A 30-45 minute readiness diagnostic catches the failure modes before that commitment is made.

Family contract: CODE0. This skill is a member of design-sprint-skills and conforms to the family frontmatter and Decider Checkpoint requirements.

When to Use

When NOT to Use

What This Skill Produces

A single bundled artifact with six sections:

  1. Readiness verdict: Go / Conditional Go / Wait
  2. Diagnosis: what is in place, what is missing, what is uncertain
  3. Recommended preconditions (when verdict is Wait or Conditional Go): the prerequisite work the team should do before the sprint
  4. Recommended attendee list (when verdict is Go or Conditional Go): the 4-7 people who should be in the room, with role expectations
  5. Customer recruiting plan (when verdict is Go or Conditional Go): target profile, source, count, incentive, recruiter owner, recruiting deadline (typically 7-10 days before Friday)
  6. Pre-sprint activities (when verdict is Go): the prep work to complete in the days before Monday

See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for a worked example using the Brainshelf book-catalog thread.

Inference Inputs

The skill runs an inference pass over these inputs to produce the verdict:

| Input | What the skill does with it |

|---|---|

| Challenge description | Determines whether the challenge is sprint-worthy (specific enough to prototype in 4 days; big enough to justify 5 team-days) |

| Existing hypothesis (from Foundation Sprint or elsewhere) | Confirms there is a testable bet, not exploratory discovery. Highest-risk assumption from the FS scorecard becomes a candidate sprint question |

| Customer access status | Critical. Without realistic Friday customer access, the sprint cannot test |

| Decider name and full-week availability | Confirms Decider can attend at least Monday morning, Wednesday morning (heat map + supervote), and Friday afternoon (Decider review); ideally all 5 days |

| Team composition draft | Checks roster against the 4-7 person band; flags missing roles (engineering for prototype build, design for sketching, researcher or PM for customer interviews) |

| Prototype medium feasibility | Confirms a 1-day prototype is achievable in the chosen medium (clickable, slideware, service role-play, paper, physical mock) |

| (Optional) Logistics constraints | Confirms five consecutive days can actually be cleared by all attendees |

If a load-bearing input is missing or low-confidence, the skill flags it explicitly and proposes how to close the gap before Monday.

Readiness Criteria (8 Canonical Checks)

The skill evaluates the team against these eight criteria, drawn from Sprint (Knapp, Zeratsky, Kowitz), GV "Is Your Idea Sprint-Worthy?", and Character Capital's Design Sprint guide:

  1. Challenge is named and sprint-worthy. Specific enough to prototype in 4 days; big enough that a wrong direction would be costly.
  2. Stakes are meaningful. The team would otherwise hesitate, debate, or default to building blindly. The sprint is justified by what it replaces.
  3. Decider is available for the load-bearing moments. Minimum: Monday morning (framing), Wednesday morning (heat map + supervote), Friday afternoon (Decider review). Ideally all 5 days.
  4. Team size is appropriate (4-7). Smaller than 4 weakens skill coverage; larger than 7 slows decision-making.
  5. Team can clear 5 consecutive days. No partial attendance for core participants; cameo experts may attend specific sessions.
  6. Customer access for Friday testing is secured (or recruitable in 7-10 days). 5 target-profile customers, paid honoraria, scheduled for Friday morning to early afternoon.
  7. Prototype medium is feasible in 1 day. Clickable (Figma), slideware (Keynote), service role-play, paper, physical mock, or other medium that can be built Thursday by 2 people.
  8. Sprint output has a path forward. The team is ready to act on validation (build, iterate, pivot to backup, or stop) when Friday's scorecard lands. Sprints without a downstream commitment become orphaned learnings.

| Pattern | Verdict |

|---|---|

| All 8 criteria met cleanly | Go |

| 1-2 criteria are "yellow flags" but addressable in the 1-2 weeks before Monday | Conditional Go with documented prep |

| 3 or more criteria fail, or any of 1, 3, or 6 is a hard fail | Wait with recommended prerequisite work |

Treat the criteria as load-bearing, not a checklist to game. A team that papers over no-customer-access with "we'll figure it out by Thursday" should get a Wait, not a Conditional Go.

Common Pitfalls

Canonical Sources

Cross-Skill Usage

This skill is the entry point of the design-sprint-skills family. It has no prerequisites (the metadata.prerequisites field is intentionally empty).

When the verdict is Go, the natural next invocation is tool-design-sprint-brief to lock challenge, team, recruiting plan, prototype medium, and logistics. When the verdict is Wait, the team typically does prerequisite work (problem framing, Foundation Sprint, customer recruiting setup) before re-invoking this skill.

A team coming directly from a Foundation Sprint should bring the Founding Hypothesis as input context. The hypothesis's highest-risk assumption (typically marked in the FS assumption scorecard) becomes the lead candidate sprint question for tool-design-sprint-brief (which locks the sprint questions); tool-design-sprint-map-and-target on Monday then refines the locked questions during the morning. No bridge skill exists or is required; the narrative handoff is described in _workflows/foundation-to-design.md and in both user guides.

tool-note-and-vote may be invoked once during the readiness conversation if the team disagrees on whether a Design Sprint is the right tool (vs. a smaller experiment or direct build). In practice, the diagnostic is usually conclusive.

Decider Checkpoint

This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider signs off on the verdict (Go / Conditional Go / Wait), accepts the diagnosis, and explicitly commits to the load-bearing attendance windows. Without Decider sign-off, the verdict is advisory; with sign-off, it is the commitment that triggers (or postpones) the sprint and the recruiting work.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.