Ticket → Ship
The ticket-shaped parts of shipping. The PR mechanics live in their own skills —
this is what a tracker adds on top.
Steps
- Read the ticket and its latest comments, then list existing PRs before starting (
acli, Jira, Linear,gh). Withacli, request--fields summary,description,status,comment,issuelinks --json: the default view omits comments, which can contain reopened QA scope. Read the existing PR diff as well as its body; follow-up commits can invalidate the body's implementation claims. - Confirm the correct base branch(es) before starting — some orgs need a
release branch plus the default (stacked-pr). Never assume; verify the
org's rule.
- Find the existing PR or start one (
work→pr-update), then drive it
mergeable (pr-ready) and polish before handoff (clean).
- Read the repository's ticket/label guidance before selecting a handoff state; don't substitute generic workflow names. In MR, use
.claude/skills/create-pr/SKILL.mdandteams.mdfor label rules. For an existing DOTCOMPB PR returned by QA and then fixed, the user's retest handoff is In Test with Pending QA Review, not a reset to In Code Review. Preserve the ticket-driven Needs UI Review label. Report CI/deployment blockers separately; In Test does not mean merge-ready. Link the PR and add a factual retest update when the user requests the handoff. - Draft the stakeholder update — Slack or a ticket comment, short,
no-tropes.
Don't send it unless asked.
Don't
- Assume the base branch.
- Mark the ticket done while CI is red or review threads are open.
- Let the ticket and the PR tell different stories about the state of the work.