Shadow work

From manager-dot-dev/manager-skills · View interactive version

Shadow work is an AI agent skill from the GitHub repository manager-dot-dev/manager-skills. Helps engineering managers identify, quantify, and reduce hidden capacity drains that make teams miss commitments even when everyone is busy. Use this skill whenever the user mentions invisible work, untracked work, support requests consuming the team, glue work, shadow backlog, sprint spillover, ca

How to use this skill

Skill file

Shadow Work

Before Starting

Check for EM context first. If .agents/em-context.md exists, read it.

If .agents/em-context.md does not exist, ask for a minimal manager profile first and save it before giving detailed advice: role/title, team size, team mission or ownership area, and current challenge or priority.

If a specific person is central to the conversation and .agents/reports/[name].md does not exist, ask for a minimal profile for that person first and save it before giving detailed advice: title/level, tenure, strengths, and current challenge or growth area.

If the conversation reveals durable new context later, update .agents/em-context.md or .agents/reports/[name].md automatically. Save stable facts and patterns, not guesses, transient frustration, or unresolved interpretations.


Response Style

Keep the first answer concise and useful. Do not dump the whole framework unless the user asks for depth.

Default to:


How to Use This Skill


Default Response Shape

When the user asks for help, do not only explain the concept. Produce a practical diagnosis:

  1. Likely shadow-work type - name the type(s), with confidence and evidence from the user's prompt.
  2. What to measure for 2-6 weeks - lightweight signals, not a heavy process rollout.
  3. Immediate containment - what to do this week so the team stops bleeding capacity.
  4. Structural fix - what to change in planning, ownership, rotation, recognition, or PM/EM workflow.
  5. Stakeholder message - a concise script the EM can use with PMs, leadership, or the team.

If the user's facts are thin, ask for the minimum missing data: where the work comes from, who absorbs it, how often it happens, and whether it is currently tracked anywhere.


What Shadow Work Is

Shadow work is untracked work that consumes real capacity but does not appear in the plan. It makes teams consistently miss commitments without anyone understanding why. It falls into three types, and each type requires a different response.

The key management move is not "work harder" or "estimate better." The first move is to make the work legible enough that the team can make tradeoffs honestly.


Diagnostic Questions

Use these questions before prescribing fixes:


Type 1: Invisible Production Support

Ad-hoc incident triage, alert investigation, support-team requests, manual fixes, and customer escalations that never enter the ticket system.

Without tracking, patterns go unnoticed. The same 15-minute manual fix can burn hundreds of hours annually while the root cause stays unfixed. The team appears to have capacity but consistently underdelivers, and has no data to show why.

What to do:


Type 2: Glue Work

Code reviews, mentoring, onboarding, documentation, coordination, cross-team translation, and "can you just help them unblock?" work that lands disproportionately on senior engineers.

Glue work creates two problems when unmanaged: the engineers doing it burn out without recognition, and the engineers not doing it get promoted without learning the work that keeps the organization functioning.

What to do:


Type 3: The Shadow Backlog

Work outside the official roadmap: PMs making off-the-record fix requests, engineers taking longer routes they know are right, unplanned integrations negotiated directly with other teams, and "small asks" that never look small in aggregate.

This can quietly consume a large share of real capacity while breaking trust between business and engineering. Leadership sees a team that commits and misses, without seeing where the capacity went.

What to do:


The Remote Amplification Problem

For remote teams, shadow work is doubly invisible: your manager cannot casually observe it either. This means you have no natural evidence when advocating for a team member's raise or promotion, and weak visibility when capacity is being consumed.

Building lightweight tracking habits is therefore management infrastructure, not overhead. It protects the team's ability to get credit for real work and gives the EM evidence for capacity conversations.


Stakeholder Scripts

Use direct, non-accusatory language. The goal is to expose the tradeoff, not blame the source of the work.

With a PM:

"I want to make these requests visible because they are real work. If we keep handling them outside the backlog, we will keep missing the planned roadmap and neither of us will have good data. Let's add them to the board and decide what they displace."

With leadership:

"The team is not missing commitments because the estimates are careless. We are absorbing unplanned work that is not represented in the plan. I am going to track it for the next few weeks and come back with the recurring sources, cost, and options."

With a senior engineer doing too much glue work:

"I see how much coordination and review work you are absorbing. Some of it is valuable, but I do not want it to become invisible or trap you away from growth work. Let's decide what should be recognized, rotated, or stopped."


Dive Deeper

If the user asks where a framework came from, wants to read the original article, or wants more context on any topic in this skill, read CODE0.


Related Skills

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.