Rtl p5 verify policy

From babyworm/rtl-agent-team · View interactive version

Rtl p5 verify policy is an AI agent skill from the GitHub repository babyworm/rtl-agent-team. Internal reference: rtl p5 verify policy (agent-loaded; do not invoke).

How to use this skill

Skill file

Phase 5 Verification Policy

Three-Stage Architecture

Stage 1 (Module): Each module independently verified in parallel across 9 categories.

Stage 2 (Top): System-level verification after ALL modules graduate.

Stage 3 (Final): Compliance review + summary generation.

Core principle: Module-level verification first, top-level only after module graduation

(criteria: Module Graduation Gate below). Only graduated modules participate in top-level

integration. This prevents wasting top-level sim time on modules with known bugs.

Verification Categories

Applied at both module-level (Stage 1) and top-level (Stage 2). Agent/sub-orchestrator

routing per category is OWNED by the p5-verify-orchestrator agent prompt ("Verification

Categories" table).

V1: Lint (final comprehensive)
V2: SVA Completion + Formal
V3: CDC/RDC Analysis
V4: Protocol Compliance (if bus interfaces)
V5: Functional Regression (Tier 3/4)
V6: Coverage Analysis
V7: Performance Verification
V8: Synthesizability + PPA Estimation
V9: Code Review + Refactoring

Parallelism Model (Stage 1 per module)

Parallel Group A: V1(Lint) + V2(SVA/Formal) + V3(CDC) + V4(Protocol) + V8(Synth Est.)
Sequential: V5(Functional) starts after V1 pass (lint-clean required for sim)
Incremental: V6(Coverage) starts as V5 data arrives
Sequential: V7(Performance) after V5 pass (functional correctness required)
Final: V9(Code Review) after V1-V8 results inform review scope

Overlap Rules

passes all Group A checks starts Group B immediately without waiting for other modules

Module Graduation Gate

A module graduates when ALL 9 checks pass. The per-check criteria are stated ONCE,

normatively, in "Final Checklist — Stage 1 (Per Module)" below (PARTIAL_PASS accepted

for V5 AC-level checks — WARNING, not FAIL).

On FAIL: invoke rtl-p4s-bugfix (feedback loop, max 2 per module).

After fix, re-verify ONLY the failed categories (not all 9).

AC-Level Module Graduation (when applicable)

When structured acceptance_criteria (with ac_id) exist in iron-requirements:

Module graduation (Stage 1):

Stage 3 audit (final, pre-P6): per "Requirement Traceability Gate (P6 Entry Blocker)"

below and Final Checklist Stage 3 (no Critical/High ac_id UNTESTED or PARTIAL).

When no structured AC: existing REQ-level graduation applies.

Top-Level Gate

All top-level checks PASS → proceed to Stage 3.

On FAIL → classify and fix:

Per-Module Verification Tracker Schema

Per-module JSON with fields: module, status (initial "pending"), checks object with

one key per category — v1_lint, v2_sva_formal, v3_cdc, v4_protocol (allows "n/a"),

v5_functional, v6_coverage, v7_performance, v8_synth_est, v9_code_review — each

initialized "pending", plus feedback_loops (count, initial 0) and graduated (bool, initial false).

Functional Verification Scenario Splitting (V5)

Long test suites split by scenario category:

| Category | Description | Typical Vector Count |

|----------|-------------|---------------------|

| basic | Normal operation, happy path | 50-100 |

| corner_case | Boundary conditions, edge cases | 100-200 |

| stress | Maximum throughput, back-to-back, full FIFO | 200-500 |

| error_handling | Invalid inputs, error injection, recovery | 50-100 |

Each scenario category runs as independent parallel agent.

Multi-seed regression per scenario (5 seeds default: 1, 42, 123, 1337, 65536).

Total: M modules × S scenarios × 5 seeds = massive parallelism.

Early termination: >5% failure rate → halt and report.

For very large modules, further split by feature within each category.

SVA Iterative Refinement

Minimum 3 rounds: Draft → Strengthen → Harden.

explicitly on DUT RTL only before SBY, then verify the output file exists and is non-empty.

them through sv2v; generate a Yosys-compatible procedural harness for OSS SBY.

Coverage Targets

Post-exclusion targets: line ≥ 90%, toggle ≥ 80%, FSM ≥ 70% (normative statement:

Final Checklist Stage 1, V6 items).

Iterative coverpoint refinement (minimum 3 rounds).

Generate additional tests for HIGH priority gaps. Re-run regression for new tests.

When convergence is detected (2 consecutive iterations with < 0.5% improvement),

apply Coverage Exclusion Protocol per rtl-p5s-coverage-policy: classify unreachable bins,

generate exclusion files, document in reviews/phase-5-verify/{module}-coverage-exclusions.md,

and report both raw and post-exclusion numbers.

Synthesis Estimation Policy (ASIC TSMC 28nm)

Both Module-level (V8) and Top-level (T8):

  1. constraint-writer generates SDC (MANDATORY — before synthesis)
  2. run_syn.sh — handles tool selection and sv2v conversion internally (Layer 2).

--skip-if-unavailable is permitted only for an explicitly requested

exploratory estimate, never for synthesis signoff or module graduation.

  1. Synthesis scope depends on tool tier (per syn-tool-profiles):

estimation; synthesis signoff and module graduation remain blocked until a

synthesis-capable tool runs and passes.

  1. Area reported in NAND2-FO2 gate equivalents (area_um2 / 0.798) when available

Module-level (Stage 1 V8):

→ Always: synthesis estimation with NanGate45 + NAND2 gate count

→ SDC: per-module clock/IO constraints

Top-level (Stage 2 T8):

→ Always: full synthesis estimation with NanGate45 + SDC

→ User requested full synthesis? → additionally export netlist + JSON report

→ Area metric: ALWAYS NAND2-FO2 gate equivalents (NOT LUTs, NOT raw cell count)

Parallelism Budget

Cap concurrent verification agents at ~20-30 via run_in_background regardless of theoretical parallelism.

Feedback Loop Classification

| Failure Type | Scope | Fix Approach | Re-verify |

|---|---|---|---|

| UNIT_FIX (lint) | Single module V1 | rtl-coder fix | V1 only |

| UNIT_FIX (SVA) | Single module V2 | rtl-p4s-bugfix | V2 only |

| UNIT_FIX (CDC) | Single module V3 | rtl-coder add sync | V3 only |

| UNIT_FIX (sim) | Single module V5 | rtl-p4s-bugfix | V5 + V6 |

| INTEGRATION_FIX | Cross-module | rtl-p4s-bugfix | Affected Vx + Stage 2 |

| DESIGN_FIX | Architecture | STOP → user | All (after upper phase fix) |

Independent UNIT_FIX failures in different modules: fix in parallel.

Same-module failures: fix sequentially within a single task.

INTEGRATION_FIX: always sequential (cross-module dependencies).

UARCH_FIX (P5→P3 Feedback Path)

When P5 verification reveals a μArch-level issue that cannot be fixed in RTL alone

(e.g., pipeline balance infeasible, missing metadata in FIFO struct, architectural

throughput bottleneck):

  1. Classify as UARCH_FIX → STOP current P5 verification for affected module
  2. Generate reviews/phase-5-verify/uarch-feedback-{module}.md with:
  1. Escalate to user for P3 uarch document update
  2. After P3 update → P4 RTL re-implementation → P5 re-verification

Feedback Loop Decision Recording

Every feedback loop iteration MUST produce a decision record at

.rat/scratch/phase-5/feedback-loop-decision-{N}.md with:

# Feedback Loop Decision #{N}
- Module: {module}
- Check: V{x} ({category})
- Classification: UNIT_FIX | INTEGRATION_FIX | DESIGN_FIX | UARCH_FIX
- Root cause: {description}
- Fix applied: {description of change}
- Alternatives considered: {rejected options with rationale}
- Affected artifacts: {list of modified files}
- Re-verification scope: {which checks to re-run}

This enables post-mortem analysis of verification efficiency and identifies

recurring patterns that should become preventive rules.

Integration with rat-auto-design

When invoked from rat-auto-design, state is tracked in .rat/state/rat-auto-design-state.json:

{
  "current_phase": 5,
  "completed_sub_phases": ["stage-1-module-a", ...],
  "pending_sub_phases": ["stage-2-integration", "stage-3-compliance"],
  "fix_history": [
    {"sub_phase": "stage-1-v2", "module": "module_a", "fix_count": 1, "status": "resolved"}
  ]
}

This enables resume: re-read state and continue from next pending sub-phase.

UVM Verification (Optional)

If commercial simulator available and UVM mandated, invoke /rtl-agent-team:rtl-p5s-uvm-verify

alongside V5. UVM is NOT a replacement for cocotb regression — both provide complementary coverage.

Escalation & Stop Conditions

escalate to clock-architect + cdc-reviewer before next fix loop

Final Checklist

Stage 1 (Per Module)

Stage 2 (Top-Level)

Stage 3 (Final)

Requirement Traceability Gate (P6 Entry Blocker)

Stage 3 includes a Formal Traceability Audit that gates P6 entry:

VERIFIED (simulation test with assertion) or FORMAL (SVA proof)

This ensures no Critical/High requirement ships without at least one verification artifact.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.