<Purpose>
Execute Phase 5 verification pipeline. Runs three-stage verification
(module → top → final) covering 9 verification categories with module
graduation gates and compliance review.
This is a legacy bundled bridge while teams transition to split P5A/P5B.
</Purpose>
<Use_When>
- Phase 4 RTL implementation is complete with lint passing
- User says "verify", "verification", "Phase 5", "run all checks"
- Need comprehensive verification: lint, formal, CDC, functional, coverage, synthesis
- Need one legacy-style Phase-5 command that bundles functional + silicon-oriented checks
- Need migration bridge while adopting split flows (
rtl-p5a-functional-closure+rtl-p5b-silicon-validation) - Team workflow intentionally keeps the combined legacy Phase-5 interface
</Use_When>
<Do_Not_Use_When>
- RTL modules don't exist yet (run
rtl-p4-rapid-implorrtl-p4-implementfirst) - Only need functional regression (use rtl-p5s-func-verify)
- Only need a specific verification category (use the category-specific skill)
- Want strict separation of functional closure and silicon validation
(use rtl-p5a-functional-closure first, then rtl-p5b-silicon-validation)
- Starting a new verification flow with explicit two-stage closure
(default to split rtl-p5a-functional-closure + rtl-p5b-silicon-validation)
</Do_Not_Use_When>
Prerequisites
Phase 4 completion required:
rtl/**/*.svfiles must exist- One of the following completion proofs must exist:
reviews/phase-4-rtl/lint-report.md(fullrtl-p4-implementpath).rat/state/p4-state.jsonwithgates.p4_exit.verdict=pass(rapidrtl-p4-rapid-implpath)
If prerequisites are missing: WARNING — recommend running /rtl-agent-team:rtl-p4-rapid-impl
or /rtl-agent-team:rtl-p4-implement. Proceed with available artifacts — orchestrator will adapt scope.
Execution
Task(subagent_type="rtl-agent-team:p5-verify-orchestrator",
prompt="Execute Phase 5 verification. User input: $ARGUMENTS")
Do not perform any work directly.
The orchestrator agent manages all stages, module graduation,
parallel agent spawning, and compliance review.
Compliance Notes
- Verification must confirm all iron requirement
acceptance_criteriaare met.
When structured acceptance_criteria (with ac_id) exist from P3, verification
tracks compliance at the individual criterion level (ac_id granularity).
When acceptance_criteria is in string-array format (P1/P2), verification
operates at REQ level.
- Final compliance check compares test results against P1+P2+P3
acceptance_criteria - Phase 5 PASS requires zero unmet iron requirements across all verification categories
Output
reviews/phase-5-verify/— 9 category verification reports (lint, formal, CDC, protocol, functional, coverage, performance, synthesis, code review)reviews/phase-5-verify/final-compliance.md— overall PASS/FAIL verdict with requirement traceability