pm-gtm-v1, source of truth → fresh gate state → phase-gated plan → config-only rows
Input is a go-to-market goal: a launch, a period, a plan refresh. Output is a plan package: a
fresh gate-state snapshot, a plan built phase by phase, a campaign-architecture narrative, channel and
tracking planning rows, and a handoff record for the owner and whoever runs marketing operations.
**This verb plans. It never spends, never posts, never configures a platform, and never touches a
tag container.** Execution stays human; implementation stays engineering's.
Seam discipline: this verb emits no engineering seam artifacts. When technical work emerges from
planning, a pixel install, a container change, instrumentation, landing pages, it leaves as
classified candidate rows routed to /pm-requirements-v1 (a single item) or /pm-portfolio-v1 (a
batch). One seam, one owner.
Preflight (run first)
PKG_ROOT="${CLAUDE_PLUGIN_ROOT:-${PKG_ROOT:-}}"
[ -n "$PKG_ROOT" ] && [ -r "$PKG_ROOT/.claude-plugin/plugin.json" ] || { echo "STOP: set PKG_ROOT to this package's root directory, the one holding .claude-plugin/plugin.json, then re-run."; exit 2; }
bash "$PKG_ROOT/scripts/preflight.sh" pm-gtm-v1 [--stack <keys>]
Conditional keys: gate-state-snapshot (the read-only analytics reads that let a gate state be
measured rather than asserted) · workspace-docs · backlog-sync. A selected-conditional miss
blocks like a required one.
Standalone vs supercharged. Standalone (python3): the full chain resolve, the phase-gated plan,
the campaign narrative and the config-only rows, with **every unprobeable gate state written
NEEDS-CONFIRMATION with a named confirmer, never guessed.** Supercharged: gate-state-snapshot
turns those rows into measured states.
There is deliberately no advertising-platform capability. Nothing here holds or requests ad-account
credentials, which is precisely why the rows in step 4 are configuration proposals rather than changes.
Hard rules
- Resolve the source-of-truth chain first, and never plan from stale content. Plan documents
accumulate: an update note usually rides on top of an older attested canonical. **Start from the
newest update document; use the canonical for constants and structure only.** Every gate state
embedded in an older plan is frozen to the date that plan was written, treating those as current is
the specific failure this verb exists to prevent.
- A fresh gate-state snapshot precedes the first planning sentence. The snapshot is written and
presented at gate 1, it is the ONLY gate-state source for the whole run, and **it expires when the
run closes.** The next run re-snapshots; it never inherits.
- Budget language is posture-bound.
direction-onlyis the default and never invents a
per-channel cap. capped uses only a number the owner named, entered as an [L0] constant. none
means planning without spend. Never convert direction into numbers, and never treat a stated cap
as a pool to allocate, per-spend approval survives every posture.
- The rows are config-only. No credential file is read (pointers and names only), no platform API
is called, no pixel, tag, container or campaign is created or edited, and nothing is verified against
a live ad account. Every row carries state: CONFIG-PLANNED and, where it applies, what blocks it.
- No seam artifacts from this verb. Emerging technical work becomes candidate rows pre-classified
risk_class / money_path / analytics_touch, routed to the verb that owns the seam. **Go-to-market
is not tag-manager work:** container changes are engineering, and the shared acronym must never pull
them in here.
- Customer-facing claim safety. Build the unsupportable-claims list at lock, one row per claim the
business cannot substantiate, with a named reviewer per locale, and bind it to every headline and
hero surface from the first draft, not just at the final audit. Planning rows and creative-brief
pointers are customer-facing-adjacent surfaces.
- Honesty on gates. A red gate stays red until its owner reports it unblocked. A gate that cannot
be probed is NEEDS-CONFIRMATION with a named confirmer, never a guessed state, and never quietly
softened at handoff.
- No volume targets. No channel quotas, no row counts as goals. Deliverables are versioned
forward, never overwritten; prior plan epochs are read-only [L4] archive.
- Artifacts land where the run said they land. Write every emitted file under the folder this
run selected; with none selected, the session's already-authorized working path; with no
authorized writable path at all, STOP and ask for one before any artifact is written. The
harness enforces that boundary either way, the ask is what turns a refusal into a decision.
Inputs
| Input | Required | What it is |
|---|---|---|
| the goal | yes | the outcome the plan serves plus its period, stated with its metric link, how the goal moves the cycle's north-star or leading metric |
| channels in scope | yes | an explicit list, or propose. Every channel beyond the confirmed set is NEEDS-CONFIRMATION, not an assumption |
| budget posture | yes | direction-only (default) · capped (the owner names the number) · none |
| decision shape | yes | solo · domains · squads, decides who executes and which register the handoff uses |
| prior-plan pointer / pack | no | overrides where the chain starts; default is pack-resolved |
| scope filter | no | a subset of channels, personas or phases for a partial refresh |
Flow
0. SNAPSHOT resolve the chain, then take the FRESH gate-state snapshot
1. LOCK the contract: goal + metric link · channels · posture · decision shape · pack ·
│ plan version proposal · the unsupportable-claims list · the right-sized method stack
├─ GATE 1 contract echo + snapshot audit
2. BUILD the plan, phase by phase: intro shell → research → strategy → rollout
3. NARRATE the campaign architecture: per channel · per persona · gate-aware
4. ROWS channel rows + tracking rows, CONFIG-ONLY
├─ GATE 2 plan + narrative + rows draft
5. PACKAGE assemble + internal passes
6. HANDOFF to the owner and marketing operations; technical work leaves as routed candidates
├─ GATE 3 finalisation: ADOPT / ADOPT-WITH-EDITS / PARK
7. RETRO close-out
Three human gates; everything else is an internal pass. No auto-proceed, no auto-retry. A thin
refresh may propose folding gate 2 into gate 3 at gate 1, only an explicit yes folds it, and gates
never multiply silently in the other direction either.
0, snapshot
Resolve the chain (newest update document → attested canonical → [L4] archive), then probe every hard
gate, channel state and tracking asset by probe class:
- M, measurable: a read-only analytics read. Name the environment explicitly on every read, and
budget quota-limited queries before spending the first one.
- C, asset state from a dated scan: cite the scan and its date. A live re-scan of a tag container
is engineering work, not a self-serve probe.
- O, operational or ruling gates: elicited from the owner at gate 1 and recorded
[L0].
Output: gate-state-snapshot.md, one row per gate, the state the plan assumed · the state now · the
receipt · the verdict. Unprobeable means NEEDS-CONFIRMATION.
1, lock, and gate 1
Build the working set (never compiled into the deliverable): canonical constants including the budget
posture, the source-authority map holding the resolved chain, the unsupportable-claims list with its
named locale reviewers, and the private-information exclusions. Declare the audience, ranked. Lock the
contract paragraph and propose the plan version, the owner confirms the number at gate 1.
Right-size the method stack: open ../gtm-domain-library/SKILL.md and take in only the frameworks this
plan actually needs, sharpening the customer profile until it excludes someone, the interview method,
the differentiation questions, launch anatomy, the value-metric pricing tree, the deal test, stage
metrics. It is a menu, not a mandate, and every exclusion carries a one-line reason.
Gate 1 input: the locked paragraph · the snapshot table · the right-sized stack with its drops ·
the claim manifest · a 200–300 word brief. The owner confirms the contract, rules the snapshot's open
items, and confirms the version.
2, build
The spine, right-sized at lock: a progressive intro shell built from the constants that fills at each
phase close and locks at gate 3 → research (competitive grounding through the locked stack) → strategy,
where the pillars emerge from the completed chain and are never stated up front → rollout.
Each phase carries the same kit: the shape skeleton · one anchored sample · named milestones · the
five-question stress test. Each phase runs the internal two-pass build-then-conflict cycle. Keep the
open-items register always; add an event-typed changelog and a sign-off ledger only for multi-day or
flagship builds.
3, narrate
The campaign architecture: the core posture carried from strategy → per-channel specifications, each
citing its market evidence → per-persona variants → creative-brief pointers → **gate-aware spend
posture**, its language bound verbatim to the snapshot states (a red gate's channel gets ramp
conditions, never spend) → campaign quality-assurance and operations notes → the acquisition-funnel
sequence per persona → a closing section: open items · what this plan is not · the handoff.
4, rows, and gate 2
Two row sets, both config-only:
- Channel rows, channel · objective · persona track · creative-brief pointer · tracking
requirement · gate precondition · owner · state.
- Tracking rows, platform · asset · exists-today (per a dated scan, or NEEDS-CONFIRMATION) ·
configuration target · verification method · state: CONFIG-PLANNED · what blocks it.
Grounding rules: analytics identifiers resolve from configuration, never retyped into a row; a row that
needs a container or code change is flagged tech-work and routed at step 6.
5, package and internal passes
Floor pass (every claim tagged and cited; every row complete; **every gate quote matches the snapshot
verbatim**) · conflict pass (constants, naming, timeline, gate-state drift) · artifact manifest ·
claim-safety audit over every customer-facing surface, with each partial named · honesty audit (no
softened red, no invented spend, no stale-state citation).
6, handoff, and gate 3
The handoff record: the package · the register the decision shape calls for (solo → an executive
register with per-spend approval hooks; squads → the full case with owner columns) · the routed
technical-candidate list, each row pre-classified and never auto-inserted into anybody's backlog ·
and the optional deck lane, on request only and only when the pack declares a design kit.
Gate 3, cross-document consistency · HYPOTHESIS strip · open-items closure with
scripts/inference-gate.sh <package-dir> exiting 0. Note the seam boundary here: that gate reads a
package directory this verb owns, which is fine, but **never mint a design-gate.json just to satisfy
a tool**, this verb does not emit one. Package integrity rests on the step-5 passes and the
never-overwrite discipline. The owner rules ADOPT / ADOPT-WITH-EDITS / PARK and confirms the routed
candidates.
Retro
Append what generalises to <package-dir>/retro.md; a run that learned nothing appends one dated line
saying exactly that. One line to the local event log when the operator enabled it. Nothing leaves the
machine.
References
| File | Load when |
|---|---|
| ../gtm-domain-library/SKILL.md (+ its references/) | at lock, the framework menu this verb executes |
| ../pm-requirements-v1/references/evidence-tags.md | tagging · the L-axis · the open-items lifecycle |
| ../../packs/README.md | pack selection · whether a design kit exists for the deck lane |
Gotchas
- The acronym collision. A request to "change GTM" that means the tag-manager container is
engineering work. Route it. Never let the homonym drag container work into a planning verb.
- The stale-canonical trap is the number-one failure mode. An attested plan document stays the
canonical structure, but every state it embeds is frozen to its own date. Cite it for structure and
constants; never for a current gate, channel or baseline claim.
- An update note is not an executed plan. A document describing a rebuild that never ran is a
working delta, not history. Re-confirm its status at gate 1 until the owner settles it.
- Asset state is scan-dated. The newest read-only scan is the ground truth; anything time-sensitive
is NEEDS-CONFIRMATION or a routed re-scan, never "probably still true".
- Hero copy leaks early. Planning rows and creative-brief pointers are customer-facing-adjacent, so
the claim-safety list binds from the first draft.
- The first run has no history. A missing learnings trail is expected on run one. Consult the
framework library alone and seed the trail at close-out; never create a ledger at lock to make a
consult step look satisfied.