Plan
Split decided work into vertical slices that each deliver working behavior, end to end, in one pull request and one fresh agent session. Split by result, never by layer: "add a task and see it after a restart" is one slice covering input, storage, and output, not three.
Steps
- Read the spec, the repository instructions, and the code it touches. If a decision that changes behavior is missing, return to spec.
- Design slice 1 as a thin tracer bullet: the smallest end-to-end path through every layer that proves the plumbing and unlocks parallel follow-up slices.
- Write each task with the template below. Keep shared contracts in one task, and put refactoring in its own task when it would hide a behavior change.
- Order tasks by dependency and show which slices can run in parallel. Group into milestones only when a milestone is itself a usable result.
- Return the plan in chat. Do not write a plan file or start building unless asked.
- If the user asks to create tracker tickets (GitHub Issues, Linear, Jira, or local Markdown), first preview the slice titles, one-line outcomes, and
Blocked bydependencies for approval. Once approved, check for existing tickets to avoid duplicates, then create tickets in dependency order so real issue IDs (#42,ENG-104,PROJ-88) wire into native blocking or parent/sub-issue links.
Template
## <Action and result, in plain words>
### What are we building?
<1–3 sentences: what is missing today and what works after this task.>
### Why?
<1–2 sentences on the value to a user or developer.>
### Done when
- <3–7 results a person could check in the running app or with a command. Keep AC-n, J-n, and REQ-n IDs when present.>
### How to check
<Exact commands, and any manual or browser check.>
### Agent notes
- Blocked by: <issue IDs or task titles, or None>
- Source: <link to the spec or section>
- Starting pointers: <existing modules, symbols, or patterns to follow>
- <Key decisions, invariants, and failure rules specific to this task. Repeat critical constraints concisely when publishing to an external tracker.>
### Out of scope
- <Nearby work this task must not absorb.>
Rules
- Write in plain, simplified technical English. Keep every ticket short, concrete, and free of filler.
- A human should understand the task from the title and first two sections alone. Keep IDs and implementation detail out of them.
- Say what happens, not jargon: "sending the same event twice creates one reply", not "prove idempotency".
- Each Done when line names an action and what you see. "Moving a reel to a new status moves it to that column, and it stays there after a refresh" belongs. "Looks better" does not.
- Aim for 250 to 500 words per task. If a task needs more, split it.
- A task is ready when a fresh agent can finish it without asking a product or design question.
Return
The ordered tasks, their dependency map (Blocked by and parallelizable slices), any created ticket links, and any decision that still blocks building.