Physical Device Readiness
Required: user request, target context, delivery or status expectation, known missing evidence. Output: physical_device_readiness_card/v1, device_safety_envelope/v1, hazard_and_actuator_inventory/v1, sensor_camera_gate_policy/v1, operator_approval_policy/v1, dry_run_and_simulation_policy/v1, emergency_stop_and_rollback_plan/v1, device_trial_manifest/v1 when observed, next action, prepared-vs-observed boundary.
Why This Exists
physical-device-readiness exists because a robot, heater, or relay acts on the physical world, where a wrong command can hurt someone or damage property: it fixes the safety envelope, sensor and camera gates, dry runs, operator approval, and emergency stop before any trial, and turns the commands the agent must never run into a proposed deny list the user applies.
Contract: references/full-contract.md (examples, sibling boundaries, full artifact details).
Workflow Lane
- Current lane: Automation and status - schedules, status, health, and ops review.
- If intent belongs to another lane, hand back to
omh-routingor name the adjacent workflow. - Shared product, routing, compatibility, and evidence rules:
skill_view(name='omh-routing', file_path='references/skill-common-rail.md').
When to Use
Use before preparing or adopting a workflow that could move, heat, print, actuate, unlock, or otherwise affect physical devices so safety envelope, sensor/camera gates, dry-run policy, operator approval, emergency stop, and observation requirements are explicit.
Strong routing signals: physical-device-readiness, physical device readiness, device safety readiness, physical device safety, hardware safety gate, 3d printer readiness, 3D printer safety, snapmaker printer safety, snapmaker readiness, moonraker klipper safety, camera-gated print start, camera gate, heat command approval, iot relay safety, sensor relay safety, robotics safety, robot control readiness, vla robot readiness, mushroom cultivation relay safety, raspberry pi relay safety, 물리 장비 안전, 하드웨어 안전, 3d 프린터 안전, 프린터 안전, 로봇 제어 준비, iot 릴레이 안전, 센서 릴레이 안전
Catalog Metadata
Category: operations
Phase: device-readiness
Hermes role: operator
Quality tier: workflow-surface-gated
Reasoning demand: light
Quality bar:
- Name the user-facing workflow objective, required context, next action, and stop condition.
- Separate prepared guidance from observed platform, runtime, connector, file, memory, or delivery evidence.
- Expose missing tools, credentials, targets, or observations as user-visible gaps.
Handoff policy:
Keep this as Hermes-facing orchestration guidance first. Prepare executor, connector, gateway, or host-runtime handoff only when the user accepts that next step and observed evidence can be recorded.
Safety rules:
- A physical device readiness card is not device discovery, network pairing, credential validation, slicer output, G-code safety, camera inspection, sensor reading, relay actuation, robot movement, heat command, print start, emergency stop test, or successful hardware trial evidence unless observed device-trial evidence records it.
- Do not claim connector, gateway, runtime, file generation, memory mutation, or host automation evidence from prepared guidance.
Completion Checklist
- Device scope, actuator and hazard classes, sensor/camera gates, operator approval, dry-run policy, emergency stop, and stop condition are explicit.
- Physical actions, heat commands, relay toggles, robot movement, print starts, camera inspections, and telemetry readings are marked observed, missing, risky, or not_observed.
- Route external APIs or provider setup to
omh-external-connector-readiness, terminal commands toomh-terminal, safety concerns toomh-security-safety-review, visual/camera checks toomh-visual-qa, and missing tools toomh-toolbelt-readiness. - Do not claim device movement, heat, print, relay, robot, camera, sensor, or emergency-stop success without observed device-trial evidence.
Recovery Notes
- If the device, workspace, actuator, or authority is unclear, keep readiness blocked until the missing safety context is named.
- If the user asks to execute commands, move hardware, heat a bed/nozzle, flip a relay, or start a print, route to
omh-terminaloromh-appsand require observed operator approval before any execution claim. - If camera or telemetry evidence is required but unavailable, route to
omh-visual-qaoromh-toolbelt-readinessand keep the physical device readiness card prepared_not_observed.
Runtime Evidence
Preferred harness for this skill: physical-device-readiness.
omh runtime record --skill physical-device-readiness --harness physical-device-readiness --status started
Record observed delegation results; otherwise return not_available or not_observed.
Prepared OMH routing is not execution, review, CI, merge-readiness, or merge evidence.
- Treat wrapper memory/context summaries as advisory local context, not proof of opaque Hermes memory reads or changes.
Preserve workflow intent and stop conditions; verify before claiming completion.
Reply in the user's own words and the host's own voice: its SOUL.md persona owns reply language, tone, speech level, and sentence endings, progress updates included (where it sets no language, use the one the user wrote in), and OMH shapes structure and content only. When the requested output is delivered, put any open points inside the result and end with no question or offer; only when the person asked to choose or decide and that choice is still theirs, end with one specific question about it, not a list, a generic offer, or a footer; the shared rail's Reply Language And Host Voice and Turn Ending sections hold the full rule.
Use Hermes-native subagent/delegation features when available: native subagents -> Hermes delegation when available, otherwise sequential lanes.
Shared product, compatibility, topology, memory, harness, and execution rules: skill_view(name='omh-routing', file_path='references/skill-common-rail.md'). Load it when applicable; otherwise name an unavailable capability.