Masterplan design is an AI agent skill from the GitHub repository Abhinavbwj/Urban-Design-Skills-Claude. Generate complete urban masterplans with spatial structure, land use distribution, street network, block layout, density strategy, phasing plan, and implementation framework. Use when the user asks to design a masterplan, create an urban layout, develop a neighborhood plan, design a district, plan a

How to use this skill

Skill file

Masterplan Design Skill

Generate complete urban masterplans from site understanding through spatial

structure, land use distribution, street network, block layout, density

strategy, phasing plan, and implementation framework. This skill orchestrates

multiple specialized sub-skills into a coherent design process that produces

a fully resolved masterplan at any scale from a single city block to an

entire new district or town extension.


1. Masterplan Design Process

The masterplan design process follows eight sequential phases. Each phase

builds upon the outputs of the previous phase. Do not skip phases; mark any

phase "Deferred" with justification if the user has not provided sufficient

input. Cross-skill invocations are indicated with the --> symbol.

Phase Checklist

Phase 1: Site Understanding
  [ ] Site analysis complete or provided by user
  [ ] Constraints and opportunities mapped
  [ ] Key connections to surrounding context identified
  --> invoke site-analysis if not already done

Phase 2: Vision and Program Definition
  [ ] Design vision statement drafted (1 paragraph)
  [ ] Target population and household count established
  [ ] Total GFA by use type calculated
  [ ] Character precedents identified (3-5 reference projects)
  [ ] Sustainability and resilience targets set
  --> invoke precedent-study if user requests comparable projects

Phase 3: Structuring Framework
  [ ] Movement framework established (primary routes, transit spine)
  [ ] Green-blue framework established (parks, corridors, water)
  [ ] Built form framework established (centers, edges, density gradient)
  [ ] Transect zones defined and mapped (T1-T6 as applicable)
  [ ] Framework tested against site constraints

Phase 4: Street Network Design
  [ ] Street hierarchy defined (arterial, collector, local, shared)
  [ ] Cross-sections assigned to each street type
  [ ] Key intersections and public transport stops located
  [ ] Block structure generated from street network
  --> invoke street-design for hierarchy and cross-sections

Phase 5: Block and Parcel Layout
  [ ] Block typologies selected for each Transect zone
  [ ] Block dimensions and perimeters verified against standards
  [ ] Parcel subdivision logic applied
  [ ] Building footprint envelopes tested for feasibility
  --> invoke block-and-density for typology selection and optimization

Phase 6: Land Use and Program Distribution
  [ ] Land use zones assigned to each block or parcel
  [ ] Use mix percentages verified against vision targets
  [ ] Anchor uses located (schools, community centers, retail cores)
  [ ] Ground-floor activation strategy defined for key streets
  --> invoke mixed-use-programming for use mix and allocation

Phase 7: Public Space Network
  [ ] Neighborhood park(s) sized and located (within 500 m of all residents)
  [ ] Central plaza or civic space defined
  [ ] Pocket parks and play spaces distributed
  [ ] Greenways and pedestrian corridors connected
  [ ] Public space typology and character described
  --> invoke public-space-design for parks, plazas, civic spaces

Phase 8: Phasing and Implementation Strategy
  [ ] Development phased into 3-5 stages
  [ ] Infrastructure sequencing plan completed
  [ ] Catalyst projects identified for Phase 1
  [ ] Interim use strategy for undeveloped parcels defined
  [ ] Governance and delivery mechanism outlined

2. Structuring Framework Methodology

The structuring framework is the spatial DNA of the masterplan. It establishes

the primary organizing systems before any building is placed. Three overlapping

frameworks -- movement, green-blue, and built form -- are developed in parallel

and then overlaid to create the composite spatial structure.

Movement Framework

Establish the hierarchy of movement from regional connections down to the

individual street.

  1. Regional connections: identify all points where the site connects to the

surrounding road network, transit system, and cycling/pedestrian paths. These

are the fixed anchors of the movement framework.

  1. Primary routes: draw the main streets that connect the anchor points

across the site. These carry the highest traffic volumes, public transit

lines, and utility trunk infrastructure. Typical right-of-way: 24-36 m.

Align with topography to minimize grading. Avoid routing through sensitive

ecological areas.

  1. Transit spine: if the site warrants transit (population >5,000 or area

>20 ha), designate a transit corridor. Locate stops at 400-600 m intervals

(5-minute walk catchment). Orient the highest density and mixed-use

development toward transit stops.

  1. Secondary routes (collectors): connect primary routes, creating the block

structure. Typical right-of-way: 18-24 m. Distribute traffic across multiple

routes to avoid bottlenecks.

  1. Local streets: provide direct frontage access to buildings. Typical

right-of-way: 12-18 m. Design for low speeds (30 km/h or less). Consider

shared surfaces in residential areas.

  1. Pedestrian priority zones: designate areas where pedestrians have primacy

over vehicles -- the town center, market streets, school zones, waterfront

promenades. These may be fully pedestrianized or designed as woonerven.

  1. Cycling network: provide a connected cycling network that links to the

citywide system. Protected cycling facilities on primary and secondary routes.

Shared lanes acceptable only on local streets with speeds below 30 km/h.

Green-Blue Framework

Establish the network of open spaces, ecological corridors, and water

management systems.

  1. Natural features: map all existing natural features -- waterways, wetlands,

significant tree stands, ridgelines, steep slopes (>15%). These are the

non-negotiable anchors of the green-blue framework. Protect them with

appropriate buffers (minimum 15 m from waterways, 10 m from significant

trees).

  1. Stormwater management: design the stormwater system as a visible amenity,

not buried infrastructure. Use the natural drainage direction to locate

bioswales along streets, rain gardens in blocks, and detention basins as

park features. Target: detain the first 25 mm of rainfall on site.

  1. Park hierarchy: apply a three-tier system:

fields, playgrounds, passive recreation, community gardens.

500 m walk of all dwellings. Playground, seating, lawn, shade trees.

200 m walk. Seating, planting, public art, play elements.

  1. Green corridors: connect parks and natural areas with linear green spaces

at least 10 m wide. These serve as ecological corridors, pedestrian and

cycling routes, and stormwater conveyance. Align with street tree planting

to create a continuous urban canopy.

  1. Urban ecology: target 30% tree canopy cover at maturity. Specify native

species for at least 70% of plantings. Create habitat diversity: meadow,

woodland, wetland, hedgerow.

Built Form Framework

Establish the three-dimensional organization of buildings and spaces.

  1. Centers and edges: identify the center(s) of the masterplan -- the point(s)

of highest intensity, typically at the intersection of primary routes or at

transit stops. Define the edges -- the boundaries where the development meets

its surroundings. Edge treatment must mediate between the new and existing.

  1. Density gradient: density should peak at the center and decrease toward

the edges. This creates a legible spatial hierarchy and concentrates activity

where accessibility is highest. Apply a smooth gradient, not abrupt steps.

  1. Building height strategy: height reinforces the density gradient. Tallest

buildings at the center, stepping down toward edges and sensitive adjacencies.

Define maximum height zones. Ensure that tall buildings do not overshadow

public spaces for more than 50% of daylight hours at equinox.

  1. Special sites: identify locations for landmark buildings (civic, cultural,

religious), gateway buildings (marking entry points), and terminated vista

buildings (closing axial views). These sites receive special design attention

and may have different height or setback rules.

  1. Street wall and setback: define the default building line for each street

type. Primary streets: build-to line at the property boundary to create a

continuous street wall. Local residential streets: may have a 3-5 m setback

for front gardens. Parks and waterfronts: buildings face the open space with

active ground floors.

The Transect as Organizing Principle

The Transect provides a gradient of human habitat from rural to urban core.

Apply the following zones, selecting those appropriate to the project scale

and context.

| Zone | Character | Density (DU/ha) | Height | Street Type | Use Mix |

|------|-----------|-----------------|--------|-------------|---------|

| T1 Natural | Preserved nature, parks | 0 | N/A | Trails only | None |

| T2 Rural Edge | Agricultural, estate lots | 1-5 | 1-2 stories | Rural roads | Residential |

| T3 Suburban | Detached houses, gardens | 10-25 | 1-3 stories | Local streets | Residential + convenience |

| T4 General Urban | Attached houses, walk-ups | 25-60 | 2-4 stories | Urban streets | Mixed residential + retail |

| T5 Urban Center | Mid-rise mixed-use | 60-150 | 4-8 stories | Boulevards, avenues | Full mix |

| T6 Urban Core | High-rise towers | 150-400+ | 8-40+ stories | Ceremonial streets | Commercial + residential |

How to apply the Transect:

  1. Identify the center(s) of the masterplan -- these are T5 or T6.
  2. Define zones radiating outward from the center, transitioning smoothly through

T4, T3, and (if applicable) T2 and T1.

  1. Each zone receives the appropriate density, height, street types, use mix,

and building typologies from the zone specification.

  1. Transitions between zones should occur at natural boundaries -- parks, streams,

major streets -- not in the middle of a block face.


3. Design Parameter Ranges

The following table provides context-sensitive parameter ranges for key design

metrics. Select the appropriate row based on the site's intended character and

position in the urban hierarchy. All ranges are indicative; local codes and

market conditions may require adjustment.

Primary Parameter Matrix

| Context | Net Density (DU/ha) | FAR | Height (stories) | Coverage (%) | Green Space (%) | Block Perimeter (m) | Street Area (%) |

|---------|-------------------|-----|------------------|-------------|----------------|--------------------|----|

| Rural edge | 5-15 | 0.1-0.3 | 1-2 | 20-35 | 40-60 | 600-1000 | 15-20 |

| Suburban edge | 15-30 | 0.3-0.8 | 1-3 | 40-50 | 30-40 | 400-600 | 25 |

| Urban neighborhood | 40-80 | 1.0-2.5 | 3-6 | 50-65 | 20-30 | 300-500 | 28 |

| Urban center | 80-150 | 2.0-5.0 | 4-12 | 60-75 | 15-25 | 280-450 | 30 |

| High-density core | 150-400+ | 4.0-10.0 | 8-40+ | 65-80 | 10-20 | 250-400 | 32 |

Secondary Parameters

| Context | Parking (spaces/DU) | Street Width (m ROW) | Min Block Length (m) | Max Block Length (m) | Population per ha |

|---------|---------------------|---------------------|---------------------|---------------------|-------------------|

| Rural edge | 2.0-3.0 | 10-14 | 100 | 300 | 10-35 |

| Suburban edge | 1.5-2.0 | 14-20 | 80 | 200 | 35-70 |

| Urban neighborhood | 0.8-1.5 | 16-24 | 60 | 150 | 90-180 |

| Urban center | 0.3-0.8 | 20-30 | 50 | 120 | 180-350 |

| High-density core | 0.1-0.5 | 24-36 | 40 | 100 | 350-1000 |

Use Mix Targets by Context

| Context | Residential (%) | Commercial (%) | Civic/Institutional (%) | Open Space (%) | Streets/Infrastructure (%) |

|---------|----------------|----------------|------------------------|---------------|---------------------------|

| Suburban edge | 60-75 | 5-10 | 5-8 | 10-15 | 15-20 |

| Urban neighborhood | 45-60 | 10-20 | 8-12 | 8-12 | 20-25 |

| Urban center | 30-45 | 25-40 | 8-12 | 5-10 | 22-28 |

| High-density core | 20-35 | 35-50 | 5-10 | 5-8 | 25-30 |


4. Design Generation Logic

When generating a masterplan, follow these twelve steps in order. Each step

has a defined input, process, and output. Do not proceed to the next step

until the current step is resolved.

Step 1: Map Constraints

Input: Site boundary, topographic data, existing infrastructure, regulatory

information, environmental data from Phase 1 site analysis.

Process: Create a composite constraint map by overlaying:

infrastructure only; no habitable structures below base flood elevation

ecological habitats, archaeological sites

easements (typically 15-30 m)

Output: A constraint map showing buildable area, partially constrained area

(buildable with mitigation), and unbuildable area. Calculate net developable

area = gross site area minus unbuildable area.

Step 2: Identify Connections

Input: Constraint map, surrounding street network, transit routes, existing

pedestrian and cycling paths, adjacent land uses.

Process: Mark every point where the site can connect to the surrounding

context:

Output: A connection map showing all mandatory and optional connection

points, classified by mode (vehicular, pedestrian, cycling, transit, visual).

Step 3: Establish Primary Movement Structure

Input: Connection map, constraint map, target population (from Phase 2).

Process: Draw the primary streets that connect the most important connection

points across the site. These are the bones of the masterplan.

with the surrounding fabric (avoid cul-de-sac plans unless topography demands)

Output: Primary movement structure showing 2-8 main routes with approximate

alignments and connection points.

Step 4: Define Centers

Input: Primary movement structure, transit stop locations, site analysis

(views, solar orientation, existing features).

Process: Locate the center(s) of the masterplan -- the point(s) of highest

density, activity, and urban intensity.

or near a transit stop

topographic barriers, best connections to surroundings)

amenity (waterfront, major park, existing high street)

residents; 2-5 ha for 5,000-15,000; 5-10 ha for 15,000-40,000

Output: Center locations with approximate extent, intended character, and

relationship to primary movement structure.

Step 5: Lay Out Secondary Street Network

Input: Primary movement structure, center locations, block size targets

from the parameter matrix (Section 3).

Process: Draw secondary streets (collectors) that connect primary routes

and create the block structure.

center (250-350 m), longer blocks at edges (400-600 m)

streets create south-facing building frontage; north-south streets create

morning and afternoon sun

(they slow traffic and create terminated vistas for landmark buildings)

index target: at least 1.4, meaning 40% more links than nodes)

Output: Complete street network with block structure. All blocks should be

labeled or numbered for reference.

Step 6: Establish Density Gradient

Input: Street network, center locations, Transect zone definitions

(Section 2), parameter matrix (Section 3).

Process: Assign a Transect zone (T3-T6) to each block based on its

distance from the center and its adjacency conditions.

mixed-use)

transitioning to residential)

responding to adjacent character)

neighbors): T3 maximum to ensure transition

Output: Density plan showing Transect zone assigned to each block, with

corresponding FAR, height, and coverage parameters.

Step 7: Size and Locate Blocks

Input: Density plan, block typology catalog from block-and-density skill.

Process: Assign a specific block typology to each block.

blocks need minimum 50 m face-to-face width for adequate courtyard)

streets have more flexibility than primary routes)

that are independently developable

Output: Block plan with typology assigned to each block, block dimensions

verified, and parcelization logic indicated.

Step 8: Distribute Land Uses

Input: Block plan with typologies, program brief (from Phase 2), use mix

targets (Section 3).

Process: Assign land uses to blocks and parcels.

located in T5-T6 blocks

with convenience retail at key corners

clinics based on population thresholds (one primary school per 3,000-5,000

residents, one community center per 5,000-10,000 residents)

space, cluster it near transit and at the center

beverage, community uses) on all streets classified as "active frontage"

(typically primary streets and the central area)

Output: Land use plan showing use assigned to each block/parcel with GFA

per use. Verify totals against the program brief from Phase 2.

Step 9: Size and Locate Public Spaces

Input: Green-blue framework (Section 2), park hierarchy, population

distribution from density plan.

Process: Size and locate public spaces to meet the service radius standards.

least 0.5 ha in size

public plaza

center, adjacent to the main civic or commercial buildings

building heights (width-to-height ratio of 2:1 to 4:1 for comfortable

enclosure)

bioswales, rain gardens) to minimize separate infrastructure

Output: Public space plan showing all parks, plazas, and greenways with

dimensions, areas, and character descriptions.

Step 10: Apply Climate-Responsive Orientation

Input: Climate data from site analysis, building orientation from block plan.

Process: Review and adjust the masterplan for climate performance.

of direct sun at winter solstice. Adjust building heights or positions to

eliminate critical overshadowing

prevailing cold-season winds. Use buildings as windbreaks; avoid creating

wind tunnels between tall buildings

capture prevailing breezes. Ensure building depths allow cross-ventilation

(maximum 14 m depth for naturally ventilated buildings)

colored paving and roofs. Ensure shade on at least 50% of pedestrian routes

Output: Climate overlay map showing shadow analysis results, wind comfort

zones, ventilation corridors, and urban heat island mitigation measures.

Step 11: Verify Against Quantitative Standards

Input: Complete masterplan with all layers resolved.

Process: Calculate and verify all quantitative metrics.

Output: Metrics summary table. Flag any metric that falls outside the

acceptable range and propose adjustments.

Step 12: Define Character Areas

Input: Complete masterplan, Transect zones, land use plan, precedent

references.

Process: Divide the masterplan into 3-8 named character areas, each with

a distinct identity.

walk through this area?)

and key public spaces

character

facade articulation, ground-floor requirements)

Output: Character area map with descriptions, typology specifications, and

precedent references for each area.


5. Phasing Strategy Framework

Phasing Principles

  1. Infrastructure leads development: streets, utilities, and stormwater

systems must be in place before buildings can be occupied. Phase

infrastructure construction to serve each development phase.

  1. Build the center first: the center establishes the identity and

desirability of the entire masterplan. Phase 1 should include the central

public space, the first mixed-use buildings, and any civic anchors.

  1. Create critical mass early: Phase 1 must achieve enough density and

mix to feel like a functioning place, not a construction site. Target

30-40% of the total residential program and 20-30% of the commercial

program in Phase 1.

  1. Flexibility for market response: design blocks and infrastructure to

accommodate multiple building types. If market conditions shift, a block

planned for offices can accommodate residential, or vice versa.

  1. Interim uses activate undeveloped land: parcels not yet developed should

host temporary uses (markets, community gardens, sports facilities, events)

that bring people to the site and build community.

Typical Phasing Timeline

| Phase | Timeline | Scope | Population Target |

|-------|----------|-------|-------------------|

| Phase 0: Enabling | Years 0-2 | Site remediation, trunk infrastructure, primary roads, first park | 0 |

| Phase 1: Catalyst | Years 2-5 | Center mixed-use, first residential neighborhoods, central plaza, primary school | 30-40% of total |

| Phase 2: Growth | Years 5-10 | Expanded residential, secondary commercial, community center, secondary streets | 60-70% of total |

| Phase 3: Maturation | Years 10-15 | Remaining parcels, refinement, infill, adaptive reuse of interim uses | 85-95% of total |

| Phase 4: Completion | Years 15-20 | Final parcels, long-term civic investments, legacy projects | 100% |

Population Triggers for Facilities

| Facility | Population Trigger | Typical Size |

|----------|--------------------|-------------|

| Convenience store / cafe | 500 residents | 100-200 m2 |

| Playground | 500 residents | 400-800 m2 |

| Primary school | 3,000-5,000 residents | 1.0-1.5 ha |

| Community center | 5,000-10,000 residents | 800-2,000 m2 |

| Health clinic | 5,000-10,000 residents | 500-1,500 m2 |

| Secondary school | 10,000-20,000 residents | 2.0-4.0 ha |

| Library branch | 10,000-20,000 residents | 500-2,000 m2 |

| Sports center | 15,000-25,000 residents | 2,000-5,000 m2 |

| Supermarket | 3,000-5,000 residents | 1,500-3,000 m2 |


6. Output Template Reference

The masterplan report should follow the standardized template located at:

templates/masterplan-report.md

The template provides a complete report structure covering:

When generating a masterplan report, populate every section with project-

specific data. Use quantitative metrics wherever possible. Include specific

numbers, dimensions, areas, densities, and ratios rather than vague

qualitative statements. Reference cross-skill outputs where applicable.


7. Reference Links

Design Process Methodology

Detailed phase-by-phase methodology for masterplan design, including vision-

to-form translation, charrette facilitation, and design decision frameworks:

references/design-process.md

Neighborhood Typologies

Comprehensive catalog of ten neighborhood typologies with full specifications,

design rules, metrics, and precedent projects:

references/typologies.md

Phasing Strategies

Detailed phasing models, infrastructure sequencing logic, financial viability

frameworks, and interim use strategies:

references/phasing-strategies.md

Cross-Skill References

This skill orchestrates outputs from multiple specialized skills. Consult

each as needed during the masterplan design process:

How to Use References

  1. Before beginning a masterplan, ensure Phase 1 site analysis is complete.

Consult references/design-process.md for the full Phase 1 checklist.

  1. For each Transect zone, consult references/typologies.md to select the

appropriate neighborhood typology and design parameters.

  1. When developing the phasing strategy, consult references/phasing-strategies.md

for infrastructure sequencing logic and financial viability guidance.

  1. Use templates/masterplan-report.md to structure the final deliverable.
  2. Cross-reference between phases -- the strongest masterplans are those where

the movement framework, green-blue framework, density gradient, and land

use distribution reinforce one another as a coherent whole.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.