Management Review Planner
Use this skill before drafting any formal literature review in management, entrepreneurship, innovation, organization theory, or strategy.
This skill sits between corpus-building and prose drafting.
Use it after:
openalex-ajg-insights- a curated paper list with real citations
- optional full-text Markdown converted from PDFs
Use it before:
management-review-writerreview-orchestratorwhen the project needs routing and approval handling
Core Goal
Create a persistent review framework that becomes the canonical outline for the project.
The framework must be stored in the workspace as 07_plan/review_plan.md, and every planning revision must create a timestamped archive snapshot under 07_plan/history/.
After the plan is approved:
- later literature additions should be integrated into the existing framework
- later revisions should stay inside the existing framework unless the user explicitly changes it
- the section logic and paragraph blueprint should remain stable during drafting
Non-Negotiable Planning Rules
- Start with topic decomposition and construct-definition tracing, not section drafting alone.
- Let the user topic determine which constructs, concepts, mechanisms, or relationships need review.
- Identify anchor sources for each construct or mechanism that matters to the review.
- Propose the section architecture and the paragraph blueprint, but do not freeze them until the user confirms them.
- Persist the framework in
review_plan.mdbefore any full prose drafting begins. - Archive every planning revision with a timestamp.
- Do not let the writing skill rewrite the section logic or paragraph blueprint unless the user explicitly changes the plan.
Workflow
- Inspect the evidence base.
- If the user gives a review workspace, use
scripts/build_review_plan.py. - If the user only gives a paper list, manually verify that the listed papers are real.
- Generate the first planning scaffold.
- Create
07_plan/review_plan.md. - Also create a timestamped snapshot in
07_plan/history/. - Include topic decomposition, definition decisions, section blueprint, paragraph blueprint, and open decisions.
- Interact with the user before freezing the plan.
- Ask for confirmation on constructs, relationships, conceptual boundaries, section logic, and paragraph logic.
- Revise the plan until the user is satisfied.
- Wait for explicit user approval.
- Ask whether the framework should be frozen.
- After the user says yes, let
review-orchestratorrun the approval command so the user does not edit the file manually.
- Freeze the framework.
- Treat it as the canonical execution blueprint for later drafting.
- Hand off to
management-review-writer.
- The writer must follow the approved section and paragraph blueprint and only enrich its content with evidence.
What The Plan Must Contain
Every approved review_plan.md should contain:
- the review topic and target output
- corpus snapshot and evidence level
- topic decomposition into constructs, concepts, mechanisms, and relationships
- anchor definition sources and boundary decisions
- the high-level section architecture
- the paragraph-level blueprint under each main section
- the main tensions, contradictions, and boundary conditions to watch
- user decisions already fixed versus still open
Platform-Agnostic Quick Start
Use these placeholders on any operating system:
<workflow-python>: the Python interpreter that can run the review scripts<review-gen-home>: the folder containing thereview-genpackage or its installed skills<review-workspace>: the target review workspace
python <review-gen-home>/skills/management-review-planner/scripts/build_review_plan.py \
--workspace <review-workspace> \
--topic "Entrepreneurial bricolage and innovation" \
--word-count 1800 \
--language en \
--top-papers-mode dynamic
如果不传 --language,脚本会在交互模式下先询问用户选择 zh 或 en。
选择 zh 时,脚本要求先把用户在知网按关键词导出的 .ris 文件放到 <review-workspace>/02_corpus/cnki_ris/(或通过 --cn-ris-dir 指定目录),再把这些 RIS 条目写入计划中的中文文献小节。
--top-papers-mode dynamic 会优先覆盖 title/abstract 阶段已纳入(included)的高质量文献,不会为了凑固定数量而默认回填未纳入文献。只有显式传 --allow-fallback 才会回填。
After generating the scaffold, refine it with the user. When the user explicitly approves the framework, let review-orchestrator update the plan status.
Handoff Rule
Do not start formal review drafting until the user has approved the plan.
If review_plan.md is missing or still clearly unapproved, stop the writing handoff and return to planning.
References
Read only what is needed:
references/planning-prompt-templates.mdreferences/planning-standards.md