Incident lifecycle

From Happy-Technologies-LLC/happy-platform-skills · View interactive version

Incident lifecycle is an AI agent skill from the GitHub repository Happy-Technologies-LLC/happy-platform-skills. Complete incident lifecycle management from creation through resolution and closure

How to use this skill

Skill file

Incident Lifecycle Management

Overview

This skill covers the complete lifecycle of an incident in ServiceNow, following ITIL best practices:

  1. Creation - Log the incident with proper details
  2. Categorization - Classify by type and service
  3. Prioritization - Set impact, urgency, and priority
  4. Assignment - Route to appropriate team
  5. Investigation - Diagnose the issue
  6. Resolution - Fix the issue and document
  7. Closure - Verify and close the incident

Prerequisites

Procedure

Phase 1: Incident Creation

Create a well-documented incident with all required information.

Using MCP:

Tool: SN-Create-Incident
Parameters:
  short_description: "Brief summary of the issue"
  description: "Detailed description including:
    - What happened
    - When it started
    - Who is affected
    - What has been tried"
  caller_id: [user_sys_id or username]
  category: software
  subcategory: application
  impact: 2
  urgency: 2
  assignment_group: Service Desk

Using REST API:

POST /api/now/table/incident
Content-Type: application/json

{
  "short_description": "Brief summary",
  "description": "Detailed description...",
  "caller_id": "user_sys_id",
  "category": "software",
  "impact": "2",
  "urgency": "2",
  "assignment_group": "group_sys_id"
}

Best Practices for Creation:

Phase 2: Categorization & Prioritization

Ensure the incident is properly classified.

Category Hierarchy:

Hardware
├── Computer
├── Monitor
├── Printer
└── Mobile Device

Software
├── Operating System
├── Application
├── Email
└── Database

Network
├── Connectivity
├── VPN
└── WiFi

Request
├── Access
├── Installation
└── Information

Priority Matrix:

| Impact ↓ / Urgency → | 1-High | 2-Medium | 3-Low |

|----------------------|--------|----------|-------|

| 1-High | P1 | P2 | P3 |

| 2-Medium | P2 | P3 | P4 |

| 3-Low | P3 | P4 | P5 |

Phase 3: Assignment

Route to the appropriate resolution team.

Using MCP:

Tool: SN-Assign-Incident
Parameters:
  sys_id: [incident_sys_id]
  assignment_group: Desktop Support
  assigned_to: john.smith  # Optional: specific person
  work_notes: "Assigned based on hardware category"

Phase 4: Investigation & Diagnosis

Document all investigation steps.

Add Work Notes (Internal):

Tool: SN-Add-Work-Notes
Parameters:
  sys_id: [incident_sys_id]
  work_notes: |
    Investigation Steps:
    1. Verified user credentials - OK
    2. Checked network connectivity - OK
    3. Reviewed application logs - Found error
    4. Identified root cause: Corrupted cache

    Next: Clear application cache and test

Add Comments (Customer-visible):

Tool: SN-Add-Comment
Parameters:
  sys_id: [incident_sys_id]
  comment: "We are investigating your issue and have identified a potential cause. We will update you shortly with a solution."

State Transitions During Work:

New (1) → In Progress (2) → On Hold (3) → In Progress (2) → Resolved (6)

Update State:

Tool: SN-Update-Record
Parameters:
  table_name: incident
  sys_id: [incident_sys_id]
  data:
    state: 2  # In Progress
    work_notes: "Starting investigation"

Phase 5: Resolution

Document the fix and resolve the incident.

Using MCP:

Tool: SN-Resolve-Incident
Parameters:
  sys_id: [incident_sys_id]
  resolution_code: Solved (Permanently)
  resolution_notes: |
    Root Cause: Application cache was corrupted after update

    Resolution:
    1. Cleared application cache folder
    2. Restarted application service
    3. Verified user can now access the application

    Prevention: Scheduled cache cleanup added to maintenance window

Resolution Codes:

Phase 6: Closure

Verify with user and close the incident.

Add Customer Comment for Verification:

Tool: SN-Add-Comment
Parameters:
  sys_id: [incident_sys_id]
  comment: "Your incident has been resolved. Please confirm the issue is fixed. If you don't respond within 3 business days, this incident will be automatically closed."

Close the Incident:

Tool: SN-Close-Incident
Parameters:
  sys_id: [incident_sys_id]
  close_code: Solved (Permanently)
  close_notes: "User confirmed resolution. Closing incident."

State Flow Diagram

┌─────────┐    ┌────────────┐    ┌─────────┐
│   New   │───►│ In Progress│───►│ On Hold │
│   (1)   │    │    (2)     │◄───│   (3)   │
└────┬────┘    └─────┬──────┘    └─────────┘
     │               │
     │               ▼
     │         ┌──────────┐    ┌─────────┐
     └────────►│ Resolved │───►│ Closed  │
               │   (6)    │    │   (7)   │
               └──────────┘    └─────────┘

Tool Usage Summary

| Phase | MCP Tools | REST Endpoints |

|-------|-----------|----------------|

| Create | SN-Create-Incident | POST /incident |

| Update | SN-Update-Record | PATCH /incident/{id} |

| Assign | SN-Assign-Incident | PATCH /incident/{id} |

| Notes | SN-Add-Work-Notes, SN-Add-Comment | POST /sys_journal_field |

| Resolve | SN-Resolve-Incident | PATCH /incident/{id} |

| Close | SN-Close-Incident | PATCH /incident/{id} |

Best Practices

Troubleshooting

Cannot change state

Cause: State transition not allowed or missing required fields

Solution: Check state transition rules; ensure resolution fields are set before resolving

Work notes not appearing

Cause: Journal field permissions or wrong field name

Solution: Verify role permissions; use work_notes not comments for internal notes

Incident auto-reopened

Cause: User replied to notification email

Solution: Check inbound email actions; update work notes to acknowledge

Related Skills

References

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.