Change management

From Happy-Technologies-LLC/happy-platform-skills · View interactive version

Change management is an AI agent skill from the GitHub repository Happy-Technologies-LLC/happy-platform-skills. Complete change lifecycle management including RFC creation, CAB preparation, approval workflows, implementation coordination, and post-implementation review

How to use this skill

Skill file

Change Management Lifecycle

Overview

This skill provides end-to-end guidance for managing changes in ServiceNow following ITIL best practices. It covers the complete lifecycle from Request for Change (RFC) creation through Post-Implementation Review (PIR).

Change Management Goals:

Change Types Covered:

Prerequisites

Procedure

Phase 1: RFC Creation

Step 1.1: Create Normal Change Request

Using MCP:

Tool: SN-Create-Record
Parameters:
  table_name: change_request
  data:
    short_description: "[Action] [CI/Service] - [Brief purpose]"
    description: |
      CHANGE OVERVIEW:
      [Detailed description of what will be changed]

      BUSINESS JUSTIFICATION:
      [Why this change is needed]

      SCOPE:
      - In Scope: [What is included]
      - Out of Scope: [What is explicitly excluded]

      AFFECTED SERVICES/CIS:
      - [Service/CI 1]
      - [Service/CI 2]

      DEPENDENCIES:
      - [Dependency 1]
      - [Dependency 2]
    type: normal
    category: [Hardware/Software/Network/Other]
    priority: 3
    risk: moderate
    impact: 2
    assignment_group: [implementation_team_sys_id]
    cmdb_ci: [affected_ci_sys_id]
    requested_by: [requester_sys_id]
    start_date: [planned_start]
    end_date: [planned_end]

Using REST API:

POST /api/now/table/change_request
Content-Type: application/json

{
  "short_description": "Upgrade Database Server - Production CRM",
  "description": "CHANGE OVERVIEW:\nUpgrade Oracle database from 19c to 21c...",
  "type": "normal",
  "category": "Software",
  "priority": "3",
  "risk": "moderate",
  "impact": "2",
  "assignment_group": "group_sys_id",
  "cmdb_ci": "ci_sys_id",
  "start_date": "2024-02-15 22:00:00",
  "end_date": "2024-02-16 02:00:00"
}
Step 1.2: Create Standard Change Request

First, find approved standard change template:

Tool: SN-Query-Table
Parameters:
  table_name: std_change_catalog
  query: active=true^namLIKE[keyword]
  fields: sys_id,name,short_description,template
  limit: 10

Create from template:

Tool: SN-Create-Record
Parameters:
  table_name: change_request
  data:
    short_description: "[Standard change description]"
    description: |
      STANDARD CHANGE EXECUTION:
      Template: [Template name]

      SPECIFIC DETAILS FOR THIS INSTANCE:
      - Target System: [system]
      - Scheduled Date: [date]
      - Requestor: [name]
    type: standard
    std_change_producer_version: [template_sys_id]
    category: [from template]
    assignment_group: [implementation_team]
    cmdb_ci: [target_ci]
    start_date: [planned_start]
    end_date: [planned_end]
Step 1.3: Create Emergency Change Request

Emergency changes bypass normal CAB but still require documentation:

Tool: SN-Create-Record
Parameters:
  table_name: change_request
  data:
    short_description: "[EMERGENCY] [Brief description of urgent fix]"
    description: |
      === EMERGENCY CHANGE REQUEST ===

      EMERGENCY JUSTIFICATION:
      [Why this cannot wait for normal change process]

      INCIDENT REFERENCE:
      [Related incident number if applicable]

      IMMEDIATE RISK IF NOT IMPLEMENTED:
      - [Risk 1]
      - [Risk 2]

      PROPOSED CHANGE:
      [What will be done]

      MINIMAL TESTING PERFORMED:
      [Testing done given time constraints]

      VERBAL APPROVAL:
      - Approved by: [name]
      - Time: [timestamp]
      - Method: [phone/in-person]
    type: emergency
    category: [category]
    priority: 1
    risk: high
    impact: 1
    assignment_group: [implementation_team]
    cmdb_ci: [affected_ci]
    reason: |
      EMERGENCY REASON:
      [Detailed reason for emergency classification]
    start_date: [immediate]
    end_date: [expected_completion]

Phase 2: Change Documentation

Step 2.1: Implementation Plan

Add detailed implementation plan:

Tool: SN-Update-Record
Parameters:
  table_name: change_request
  sys_id: [change_sys_id]
  data:
    implementation_plan: |
      === IMPLEMENTATION PLAN ===

      PRE-IMPLEMENTATION:
      Time: [start] - [time]

      1. [ ] Notify stakeholders of maintenance window
         Responsible: [name]

      2. [ ] Verify backup completion
         Responsible: [name]

      3. [ ] Confirm rollback resources available
         Responsible: [name]

      4. [ ] Place system in maintenance mode
         Responsible: [name]

      IMPLEMENTATION:
      Time: [time] - [time]

      5. [ ] [Step 5 description]
         Command/Action: [specific command or action]
         Expected Duration: [X minutes]
         Success Criteria: [how to verify]

      6. [ ] [Step 6 description]
         Command/Action: [specific command or action]
         Expected Duration: [X minutes]
         Success Criteria: [how to verify]

      7. [ ] [Step 7 description]
         Command/Action: [specific command or action]
         Expected Duration: [X minutes]
         Success Criteria: [how to verify]

      VERIFICATION:
      Time: [time] - [time]

      8. [ ] Run verification tests
         Test Script: [location]
         Expected Results: [description]

      9. [ ] Confirm user access
         Test Users: [list]

      10. [ ] Monitor system for 30 minutes
          Metrics to watch: [list]

      POST-IMPLEMENTATION:
      Time: [time] - [end]

      11. [ ] Remove maintenance mode

      12. [ ] Send completion notification

      13. [ ] Update documentation
Step 2.2: Backout/Rollback Plan
Tool: SN-Update-Record
Parameters:
  table_name: change_request
  sys_id: [change_sys_id]
  data:
    backout_plan: |
      === BACKOUT/ROLLBACK PLAN ===

      ROLLBACK DECISION CRITERIA:
      Initiate rollback if ANY of the following occur:
      - [ ] Implementation step fails and cannot be resolved in [X] minutes
      - [ ] Verification tests fail
      - [ ] Service degradation exceeds [threshold]
      - [ ] Unexpected errors in logs
      - [ ] [Other criteria]

      ROLLBACK POINT OF NO RETURN:
      After step [X], rollback becomes significantly more complex.
      Decision to proceed or rollback must be made by: [time]

      ROLLBACK PROCEDURE:
      Estimated Duration: [X minutes]

      1. [ ] Stop current implementation
         Action: [specific action]

      2. [ ] Restore from backup
         Backup Location: [location]
         Restore Command: [command]
         Expected Duration: [X minutes]

      3. [ ] Verify service restoration
         Test: [test procedure]

      4. [ ] Remove maintenance mode

      5. [ ] Notify stakeholders of rollback
         Communication: [template/channel]

      ROLLBACK VERIFICATION:
      - [ ] Service accessible
      - [ ] User authentication working
      - [ ] Core functions verified
      - [ ] No data loss confirmed

      POST-ROLLBACK:
      - Document reason for rollback
      - Create problem ticket if root cause unknown
      - Schedule re-attempt after analysis
Step 2.3: Test Plan
Tool: SN-Update-Record
Parameters:
  table_name: change_request
  sys_id: [change_sys_id]
  data:
    test_plan: |
      === TEST PLAN ===

      PRE-CHANGE BASELINE:
      Capture current state for comparison
      - [ ] System performance metrics: [specific metrics]
      - [ ] Current version info: [how to capture]
      - [ ] User count/active sessions: [query/tool]

      SMOKE TESTS:
      Quick tests to verify basic functionality

      | Test | Action | Expected Result | Pass/Fail |
      |------|--------|-----------------|-----------|
      | Login | Admin login | Dashboard loads | |
      | Core Function | [action] | [expected] | |
      | API | [endpoint] | 200 OK | |
      | Database | [query] | [expected] | |

      FUNCTIONAL TESTS:
      Detailed functionality verification

      | Test ID | Test Case | Steps | Expected | Actual | Pass/Fail |
      |---------|-----------|-------|----------|--------|-----------|
      | FT-001 | [name] | [steps] | [expected] | | |
      | FT-002 | [name] | [steps] | [expected] | | |
      | FT-003 | [name] | [steps] | [expected] | | |

      PERFORMANCE TESTS:
      Compare against baseline

      | Metric | Baseline | Post-Change | Threshold | Pass/Fail |
      |--------|----------|-------------|-----------|-----------|
      | Response Time | [X]ms | | <[Y]ms | |
      | CPU Usage | [X]% | | <[Y]% | |
      | Memory | [X]GB | | <[Y]GB | |

      USER ACCEPTANCE:
      - Test User: [name]
      - Test Scenario: [description]
      - Sign-off Required: Yes/No

Phase 3: CAB Preparation and Scheduling

Step 3.1: Schedule for CAB Review

Update change for CAB:

Tool: SN-Update-Record
Parameters:
  table_name: change_request
  sys_id: [change_sys_id]
  data:
    state: -4  # Assess
    cab_required: true
    cab_date: [cab_meeting_date]
    work_notes: |
      === CAB SUBMISSION ===

      Submitted for CAB Review: [date]
      Target CAB Meeting: [date/time]

      CAB Preparation Checklist:
      - [x] Implementation plan complete
      - [x] Backout plan complete
      - [x] Test plan complete
      - [x] Risk assessment complete
      - [x] Stakeholders identified
      - [x] Communication plan ready

      Additional Materials:
      - [Link to supporting documentation]
      - [Architecture diagram reference]
Step 3.2: Create CAB Presentation Summary
Tool: SN-Add-Work-Notes
Parameters:
  sys_id: [change_sys_id]
  work_notes: |
    === CAB PRESENTATION SUMMARY ===

    CHANGE: [CHG#]
    TITLE: [Short description]
    REQUESTOR: [Name/Team]

    WHAT:
    [One paragraph summary of the change]

    WHY:
    [Business justification in 2-3 sentences]

    WHEN:
    - Proposed Start: [date/time]
    - Proposed End: [date/time]
    - Duration: [X hours]
    - Maintenance Window: [Yes/No - description]

    WHO IS AFFECTED:
    - Users: [groups/count]
    - Services: [list]
    - Regions: [if applicable]

    RISK ASSESSMENT:
    - Risk Level: [Low/Moderate/High]
    - Impact if Fails: [description]
    - Likelihood of Failure: [Low/Medium/High]

    MITIGATION:
    - [Key mitigation 1]
    - [Key mitigation 2]

    ROLLBACK:
    - Rollback possible: [Yes/No]
    - Rollback time: [X minutes/hours]
    - Point of no return: [time/step]

    DEPENDENCIES:
    - [Other changes/freezes/events]

    APPROVAL REQUESTED:
    [Standard/Expedited approval request]
Step 3.3: Query Scheduled CAB Changes

Find all changes scheduled for CAB:

Tool: SN-Query-Table
Parameters:
  table_name: change_request
  query: cab_required=true^cab_date>=javascript:gs.beginningOfToday()^cab_dateONThis week@javascript:gs.beginningOfThisWeek()@javascript:gs.endOfThisWeek()^state=-4
  fields: number,short_description,cab_date,requested_by,assignment_group,risk,priority
  order_by: cab_date

Phase 4: Change Approval

Step 4.1: Check Approval Status
Tool: SN-Query-Table
Parameters:
  table_name: sysapproval_approver
  query: document_id=[change_sys_id]
  fields: sys_id,approver,state,comments,sys_updated_on
Step 4.2: Approve Change (as Approver)

Using MCP:

Tool: SN-Approve-Change
Parameters:
  sys_id: [change_sys_id]
  approval_state: approved
  comments: |
    Approved based on:
    - Risk assessment reviewed and acceptable
    - Implementation plan verified complete
    - Rollback plan adequate
    - Testing plan comprehensive
    - Change window appropriate

    Conditions:
    - [Any conditions for approval]

Using REST API:

PATCH /api/now/table/sysapproval_approver/{approver_sys_id}
Content-Type: application/json

{
  "state": "approved",
  "comments": "Approved based on:\n- Risk assessment reviewed..."
}

Reject Change:

Tool: SN-Approve-Change
Parameters:
  sys_id: [change_sys_id]
  approval_state: rejected
  comments: |
    Change rejected for the following reasons:

    1. [Reason 1]
    2. [Reason 2]

    Required remediation before resubmission:
    - [Action 1]
    - [Action 2]

    Please address these concerns and resubmit.
Step 4.3: Move to Scheduled State

After approval:

Tool: SN-Update-Record
Parameters:
  table_name: change_request
  sys_id: [change_sys_id]
  data:
    state: -1  # Scheduled
    work_notes: |
      === CHANGE APPROVED AND SCHEDULED ===

      Approval Received: [date]
      Approved By: [names]

      Implementation Window:
      Start: [date/time]
      End: [date/time]

      Pre-Implementation Meeting: [date/time if scheduled]

      Go/No-Go Decision Time: [time before start]

Phase 5: Implementation

Step 5.1: Create Implementation Tasks

Using MCP:

Tool: SN-Create-Record
Parameters:
  table_name: change_task
  data:
    parent: [change_sys_id]
    change_task_type: planning
    short_description: "Pre-Implementation: [Task description]"
    description: |
      PRE-IMPLEMENTATION TASK

      Objective: [What needs to be done]

      Steps:
      1. [Step 1]
      2. [Step 2]

      Deliverables:
      - [Deliverable 1]

      Completion Criteria:
      - [How to know it's done]
    assignment_group: [team]
    assigned_to: [person]
    planned_start_date: [start]
    planned_end_date: [end]

Standard task types:

Step 5.2: Begin Implementation

Update change to Implementation state:

Tool: SN-Update-Record
Parameters:
  table_name: change_request
  sys_id: [change_sys_id]
  data:
    state: -2  # Implement
    work_notes: |
      === IMPLEMENTATION STARTED ===

      Time: [timestamp]
      Implementation Lead: [name]

      Go Decision Made By: [name]
      Go Criteria Met:
      - [x] Backup verified
      - [x] Rollback team on standby
      - [x] Stakeholders notified
      - [x] Maintenance mode active

      Starting implementation step 1...
Step 5.3: Document Implementation Progress
Tool: SN-Add-Work-Notes
Parameters:
  sys_id: [change_sys_id]
  work_notes: |
    === IMPLEMENTATION LOG ===

    [HH:MM] - Step [X]: [Description]
    Status: COMPLETE
    Notes: [Any observations]

    [HH:MM] - Step [X+1]: [Description]
    Status: IN PROGRESS

    Current Overall Status: ON TRACK / DELAYED / AT RISK

    Issues Encountered:
    - [Issue if any, or "None"]

    Next Milestone: [Description] at [time]
Step 5.4: Complete Implementation
Tool: SN-Update-Record
Parameters:
  table_name: change_request
  sys_id: [change_sys_id]
  data:
    state: 0  # Review
    work_notes: |
      === IMPLEMENTATION COMPLETE ===

      Completion Time: [timestamp]

      IMPLEMENTATION SUMMARY:
      - All steps executed successfully: [Yes/No]
      - Deviations from plan: [None/Description]
      - Issues encountered: [None/Description]

      VERIFICATION RESULTS:
      - Smoke tests: PASS/FAIL
      - Functional tests: PASS/FAIL
      - Performance tests: PASS/FAIL

      POST-IMPLEMENTATION STATUS:
      - Service operational: Yes
      - Users notified: Yes
      - Monitoring active: Yes

      Ready for PIR: Yes

Phase 6: Post-Implementation Review (PIR)

Step 6.1: Schedule PIR
Tool: SN-Create-Record
Parameters:
  table_name: change_task
  data:
    parent: [change_sys_id]
    change_task_type: review
    short_description: "Post-Implementation Review - [CHG#]"
    description: |
      POST-IMPLEMENTATION REVIEW

      Meeting Details:
      Date: [date]
      Time: [time]
      Location/Call: [details]

      Required Attendees:
      - Change Owner
      - Implementation Team
      - Technical Approvers
      - Service Owner (optional)

      Agenda:
      1. Change summary (5 min)
      2. Implementation review (10 min)
      3. What went well (10 min)
      4. What could improve (10 min)
      5. Action items (10 min)
      6. Lessons learned (5 min)
    assigned_to: [change_owner]
    planned_start_date: [pir_date]
Step 6.2: Document PIR Results
Tool: SN-Add-Work-Notes
Parameters:
  sys_id: [change_sys_id]
  work_notes: |
    === POST-IMPLEMENTATION REVIEW ===

    PIR Date: [date]
    Attendees: [list]

    CHANGE OUTCOME: [Successful/Successful with Issues/Partial/Failed/Rolled Back]

    METRICS:
    - Planned Duration: [X hours]
    - Actual Duration: [Y hours]
    - Variance: [+/- Z hours]
    - User Impact: [None/Minimal/Moderate/Significant]

    WHAT WENT WELL:
    1. [Positive outcome 1]
    2. [Positive outcome 2]
    3. [Positive outcome 3]

    WHAT COULD BE IMPROVED:
    1. [Improvement area 1]
    2. [Improvement area 2]
    3. [Improvement area 3]

    DEVIATIONS FROM PLAN:
    - [Deviation 1 and why]
    - [Deviation 2 and why]

    ACTION ITEMS:
    1. [Action] - Owner: [name] - Due: [date]
    2. [Action] - Owner: [name] - Due: [date]

    LESSONS LEARNED:
    - [Lesson that should be shared]
    - [Process improvement suggestion]

    PIR STATUS: Complete
Step 6.3: Close Change Request
Tool: SN-Update-Record
Parameters:
  table_name: change_request
  sys_id: [change_sys_id]
  data:
    state: 3  # Closed
    close_code: successful
    close_notes: |
      CHANGE CLOSURE SUMMARY

      Change: [CHG#]
      Title: [Short description]

      Result: SUCCESSFUL

      Implementation Date: [date]
      Implementation Duration: [X hours]

      Benefits Realized:
      - [Benefit 1]
      - [Benefit 2]

      Documentation Updated:
      - [ ] CMDB updated
      - [ ] Knowledge base updated
      - [ ] Runbooks updated

      PIR Complete: Yes
      PIR Date: [date]

      No outstanding issues.

Close Code Options:

Change State Flow

┌────────────┐    ┌──────────┐    ┌───────────┐    ┌───────────┐
│    New     │───►│  Assess  │───►│ Authorize │───►│ Scheduled │
│   (-5)     │    │   (-4)   │    │   (-3)    │    │   (-1)    │
└────────────┘    └──────────┘    └───────────┘    └─────┬─────┘
                                                         │
┌────────────┐    ┌──────────┐    ┌───────────┐         │
│   Closed   │◄───│  Review  │◄───│ Implement │◄────────┘
│    (3)     │    │   (0)    │    │   (-2)    │
└────────────┘    └──────────┘    └───────────┘
                        │
                        └───────► Canceled (4)

Risk Assessment Matrix

| Risk Level | Impact | Probability | Approval | Testing |

|------------|--------|-------------|----------|---------|

| Low | Minor | Unlikely | Auto/Manager | Minimal |

| Moderate | Significant | Possible | CAB | Standard |

| High | Major | Likely | CAB + Executive | Extensive |

| Critical | Severe | Probable | Board Level | Full regression |

Tool Usage Summary

MCP Tools

| Tool | Purpose | Phase |

|------|---------|-------|

| SN-List-ChangeRequests | List changes by criteria | All |

| SN-Create-Record | Create change, tasks | 1, 5, 6 |

| SN-Update-Record | Update change status, plans | 2-6 |

| SN-Add-Work-Notes | Document all activities | All |

| SN-Add-Change-Comment | Stakeholder communication | 3, 5 |

| SN-Assign-Change | Assign to teams/individuals | 1, 5 |

| SN-Approve-Change | Approve/reject changes | 4 |

| SN-Query-Table | Query approvals, tasks | All |

REST API Endpoints

| Endpoint | Method | Purpose |

|----------|--------|---------|

| /api/now/table/change_request | GET | List changes |

| /api/now/table/change_request | POST | Create change |

| /api/now/table/change_request/{sys_id} | PATCH | Update change |

| /api/now/table/change_task | POST | Create tasks |

| /api/now/table/sysapproval_approver | GET | Check approvals |

| /api/now/table/sysapproval_approver/{sys_id} | PATCH | Approve/reject |

| /api/now/table/std_change_catalog | GET | List standard changes |

Best Practices

Troubleshooting

"Change stuck in Assess"

Cause: Missing required fields or documentation

Solution: Verify all mandatory fields completed; check for validation rules

"Approval taking too long"

Cause: Approver unavailable or notification not received

Solution: Contact approver directly; check notification logs; use delegation

"CAB rejected change"

Cause: Insufficient documentation, risk concerns, or timing conflict

Solution: Address CAB feedback; resubmit with improvements

"Implementation failed"

Cause: Various - insufficient testing, unexpected conditions

Solution: Execute rollback plan; document failure; create problem ticket; reschedule

"Cannot close change"

Cause: Open tasks, missing PIR, or missing closure fields

Solution: Complete all tasks; document PIR; fill required closure fields

Change Templates

Normal Change Quick Reference

Type: Normal
CAB Required: Yes (typically)
Lead Time: 5-10 business days
Approval: CAB + Manager
Testing: Full cycle

Standard Change Quick Reference

Type: Standard
CAB Required: No (pre-approved)
Lead Time: 1-3 business days
Approval: Automatic
Testing: As per template

Emergency Change Quick Reference

Type: Emergency
CAB Required: Yes (post-implementation ECAB)
Lead Time: Immediate
Approval: Emergency approver (verbal OK, documented later)
Testing: Minimal (risk accepted)

Related Skills

References