Internal Comms
Org comms have house formats. Match the format and the update reads as routine and trustworthy; freelance it and people stop reading.
Quick Reference
| Comms type | Format | Surface | Length |
|---|---|---|---|
| 3P update | Progress / Plans / Problems, 1-3 sentences each | Teams channel post, Outlook | 30-60 sec read |
| Newsletter | ~20-25 linked bullets, clustered by theme | Viva Engage, Outlook | Skim in 2 min |
| FAQ roundup | Question / Answer pairs, org-wide concerns | SharePoint page, Teams | 1-2 sentences each |
| Leadership update | Headline, context, decision, what it means for you | Outlook, Viva Engage | 1 screen |
| Incident update | What happened / impact / status / next update time | Teams, Outlook | Tight, factual |
When to Use
- A recurring update is due: weekly team 3P, monthly newsletter, leadership note.
- Many people are asking the same questions and need one authoritative answer.
- An incident or project needs a structured status the whole org can follow.
- Use status-update instead for a single-audience status; this skill is for org-wide or multi-team formats.
How to Use
- Name the type and the audience. 3P for a team, newsletter for the org, FAQ for shared confusion. Confirm the team name and the period covered (usually the past week for Progress/Problems, the next week for Plans).
- Gather grounded source material. Pull from high-signal places: Teams channels with heavy reactions, Viva Engage announcements, widely-replied Outlook threads, SharePoint docs with many views, calendar items for all-hands or reviews. Cite or link what you use.
- Draft to the house format below. Keep each item to 1-3 sentences, data-driven, matter-of-fact. Lead with impact, not narrative.
- Cut to the read-time budget. A 3P is read in under a minute. A newsletter is skimmed. If it does not fit, cut the least company-wide item.
- Verify every name, number, link, and owner against the source before posting.
3P format
[Team Name] (dates covered)
Progress: what shipped / milestones hit, with metrics
Plans: top priorities for the next period
Problems: blockers, gaps, risks slowing the team
Newsletter format
Cluster ~20-25 bullets into 3-5 themed sections (for example Announcements, Progress on Priorities, Leadership, Social). Each bullet is 1-2 sentences in the "we" voice, with a link to the source post or doc.
Examples
| Don't: Freelanced | Do: House format |
|---|---|
| "Lots of progress this week, team crushed it." | "Progress: shipped onboarding v2 (adoption +18% w/w); closed 3 of 5 launch blockers." |
| Newsletter bullet with no link | "We launched the FY26 planning hub - details in the [link] all-hands recap." |
| FAQ that answers one team's niche question | "Q: When does the new expense tool go live? A: Nov 17 org-wide; old tool read-only after." |
| Vague problem ("things are slow") | "Problems: hiring freeze leaves 2 roles open; design review is the critical-path bottleneck." |
Critical Rules
- Match the house format exactly. Consistency is what makes recurring comms scannable.
- Be specific and data-driven. Metrics over adjectives in every section.
- Link to authoritative sources. A newsletter bullet without a link is a rumor.
- Right altitude for the audience. Bigger audience, less granular detail. Org news, not task logs.
- Verify owners, numbers, and links before posting. Comms errors travel fast.
Common Pitfalls
- Pasting raw notes instead of formatting to 3P / newsletter / FAQ structure.
- Writing for your team when the audience is the whole org (or vice versa).
- Newsletters that read like one team's status instead of company-wide signal.
- Burying the announcement under throat-clearing preamble.
- FAQs that invent answers instead of flagging "needs an official response."
Anti-Patterns
- Prose-heavy updates nobody finishes - the format exists to be skimmed.
- Inventing metrics to fill a section. Say "no change" or "blocked" honestly.
- Recycling last week's bullets without checking they still hold.
- Mixing personal commentary into factual status lines.
Verify Before Posting
- [ ] Correct type and audience confirmed (team vs org).
- [ ] House format followed; each item 1-3 sentences.
- [ ] Every claim is data-driven and sourced.
- [ ] All links resolve; owners and numbers verified.
- [ ] Reads inside its time budget (3P under a minute).
- [ ] No sensitive info that breaches protect-sensitive-info.
Related
- status-update - single-audience status (this skill is org-wide formats)
- meeting-recap, decision-memo
- teams-connector, outlook-connector
- cite-your-sources, verify-before-send