Hsts planning scheduling

From curiositech/windags-skills · View interactive version

Hsts planning scheduling is an AI agent skill from the GitHub repository curiositech/windags-skills. Heuristic search-based temporal planning and scheduling for complex multi-constraint environments

How to use this skill

Skill file

SKILL.md: HSTS — Integrated Planning & Scheduling

Wisdom from Muscettola's HSTS framework for building intelligent systems that unify planning (what to do) and scheduling (when/how to do it). Activates when designing constraint-based agents, solving resource allocation problems, building robust execution systems, or reasoning about commitment under uncertainty.

DECISION POINTS

Decision 1: Unified vs. Separated Planning/Scheduling

IF domain has resources with time-varying availability
   AND causal goals interact with resource constraints
   AND execution environment is uncertain
   → Use unified state variable approach
   → Model as evolving constraint network

IF problem is purely causal (no resource contention)
   → Classical planning may suffice

IF problem has fixed task structure with only temporal constraints
   → Classical scheduling may suffice

IF you see "planner feeds into scheduler" architecture
   → QUESTION: Is the seam creating coordination debt?

Decision 2: Commitment Level Selection

FOR each variable binding decision:
  IF decision is reversible AND more information is coming
    → Post ordering constraint only
    → Example: "A before B" instead of "A at 10:00, B at 11:30"
  
  IF decision resolves high-contention bottleneck (measured via simulation)
    → Commit to specific value now
    → Example: Assign spacecraft antenna to high-priority download
  
  IF tempted to fix exact times early in search
    → STOP: Can ordering relation achieve same progress?
    → Preserve temporal flexibility for executor

Decision 3: Search Focus Priority

BEFORE resolving any disjunction:
  1. Run stochastic simulation on current partial solution
  2. Sample 100+ paths without resolving open choices
  3. Count conflicts per resource-time pair
  4. Focus next decision on highest-contention resource

IF search is thrashing (many backtracks, little progress)
  → You're attacking non-bottleneck variables first
  → Re-estimate contention distribution
  → Switch to highest-conflict resource

Decision 4: Domain Modeling Approach

IF domain has objects with internal state evolving over time
  → Model each as state variable with transition graph
  → Example: Satellite antenna {idle, tracking, downloading, slewing}

IF domain has shared resources (consumable/reusable)
  → Model resource levels as state variables
  → Track availability windows, not just capacity numbers

IF expert rules exist ("X and Y can't overlap during Z")
  → Encode as compatibility constraints
  → NOT as search pruning hacks

FAILURE MODES

Anti-Pattern 1: "Nominal Trajectory Planning"

Detection Rule: If schedule output is sequence of exact times/actions with no flexibility

Root Cause: Confusing schedule with execution plan; over-committing temporal decisions

Symptom: Any runtime deviation requires full replanning

Fix: Output behavioral envelopes (constraint networks) not nominal sequences

Timeline: Becomes critical when execution uncertainty > 5% of plan duration

Anti-Pattern 2: "Premature Value Commitment"

Detection Rule: If binding variables to specific values before constraints force it

Root Cause: Not distinguishing between progress and commitment

Symptom: Search space artificially shrunk; solutions exist but aren't found

Fix: Post weakest constraint that enables progress; commit only when forced

Timeline: Shows up immediately in search statistics (solution quality drops)

Anti-Pattern 3: "Bottleneck Ignorance"

Detection Rule: If resolving disjunctions without measuring which matter most

Root Cause: Treating all constraints as equally important

Symptom: Search thrashing on easy variables while hard constraints fester

Fix: Use stochastic simulation to estimate conflict probability before each decision

Timeline: Becomes exponentially worse as problem size grows

Anti-Pattern 4: "Constraint Network Bloat"

Detection Rule: If propagation time grows quadratically with problem size

Root Cause: Not respecting module boundaries; monolithic constraint posting

Symptom: Solver becomes unusably slow on realistic problems

Fix: Decompose into state variable modules; make interaction topology explicit

Timeline: Hits performance wall around 50-100 activities

Anti-Pattern 5: "Expert Knowledge as Hardcoded Heuristics"

Detection Rule: If domain knowledge exists as ad-hoc search pruning rules

Root Cause: Encoding constraints implicitly instead of declaratively

Symptom: Knowledge invisible to debugging; doesn't compose across modules

Fix: Express expert rules as formal compatibility constraints with causal semantics

Timeline: Maintenance nightmare emerges when domain complexity grows

WORKED EXAMPLES

Example 1: Satellite Mission Planning

Scenario: Mars orbiter with 2 instruments (camera, spectrometer), 1 antenna, 4 GB storage. Plan 8-hour observation session with data downlink.

Novice Approach:

  1. Plan observation sequence first
  2. Schedule exact start times
  3. Add downlink at end

Fails when storage constraint discovered late

Expert HSTS Approach:

  1. Model state variables: storage_level, antenna_state, instrument_states
  2. Run stochastic simulation: storage fills to 95% probability by hour 3
  3. Decision: Storage is bottleneck, not antenna time
  4. Commit to downlink at hour 3 (value commitment for bottleneck)
  5. Leave observation ordering flexible (constraint posting for non-bottleneck)
  6. Output: behavioral envelope with storage invariant + flexible observation sequence

Alternative Path Shown: If simulation revealed antenna conflicts instead of storage, would commit to antenna schedule first, leave storage management flexible.

Example 2: Manufacturing Job Shop

Scenario: 5 jobs, 3 machines, delivery deadlines. Machine M2 has 50% uptime, others 90%.

Novice Approach: Schedule assuming all machines available; handle breakdowns reactively.

Expert HSTS Approach:

  1. Model machine_availability as time-varying state variable
  2. Stochastic simulation: M2 unavailable 40% of time slots
  3. Trade-off Analysis:
  1. Decision: Critical path jobs avoid M2; non-critical use M2 with ordering constraints only
  2. Output: schedule robust to M2 failures without pessimistic assumption about availability

What Expert Catches: M2 unreliability creates secondary bottleneck at other machines when jobs reroute. Plans for cascade effects.

QUALITY GATES

Schedule is valid and complete when:

Automated Validation Signals:

NOT-FOR BOUNDARIES

This skill should NOT be used for:

Delegation Rules:

Boundary Signals: If you're spending more effort encoding the domain than solving instances, consider whether classical OR methods might suffice for your use case.