Enablement metrics and instrumentation
Define a small set of reproducible measures that helps an owner decide whether to continue, adjust, or stop an enablement initiative.
Label what each measure represents: adoption, execution, productivity, or commercial outcome. Completion measures adoption; observed job behaviour measures execution. Include the links relevant to the initiative, and mark unmeasured links rather than inventing metrics to fill the tree.
Fails. "If 80% of AEs complete certification, win rate will rise 8 points this quarter."
Passes. "Adoption: eligible sellers completing certification. Readiness signal: first-attempt pass rate. Execution: observed discovery quality on eligible calls. Commercial: win rate for the defined opportunity cohort. Participation and assessment results alone cannot establish a commercial effect."
If the user wants the leadership narrative of results already in hand, use enablement-impact-story.
Inputs
Reuse supplied context first. If a missing company fact would change the result, check the relevant sections of .enablement/context.md when available. Preserve source dates and approval limits.
Ask only for the inputs that change the tree:
- The initiative and the question the measure must inform
- Eligible population, exclusions, and time window
- Systems, events, and join keys that actually exist
- Who reviews the numbers, and how often they decide
If a baseline, formula, join, or owner is unknown, leave it unknown. Do not invent win rates, usage, or ROI.
Supporting material
Read references/kpi-tree-framework.md for the four tiers, metric contract, and claim limits. Read references/kpi-tree-examples.md when the initiative is onboarding or a product launch and you need a worked tree.
Procedure
- Name the question.
Establish what the owner needs to know or decide. For one metric, define its purpose and limits. For a programme measurement plan, identify the intended business outcome and the measures needed to assess progress. Done when each requested measure has a clear use; an operational question need not become a full commercial KPI tree.
- Tier the tree.
Explain how the work is expected to change behaviour and contribute to the outcome. Select a leading behaviour measure and the downstream measures the decision needs. Completion and usage may explain exposure, but cannot establish effectiveness alone.
- Write the contract.
Formula, grain, population, filters, time window, source fields, and stable keys. Done when a second analyst could reproduce the number from the contract alone. Otherwise label it not yet reproducible.
- Instrument the missing events.
Durable state changes, not clicks. Name the trigger, keys, timestamp, owner, and latency. Prefer certification_passed over button_clicked.
- Fix joins before combining systems.
Native grain first. Aggregate one-to-many sources before the join. Use event time, not today's owner or stage, unless that rewrite is the stated definition.
- Set the evidence design.
Descriptive, contribution, or causal. Record eligibility, exposure, comparison, lag, confounders, and what would invalidate the claim. A pre/post line is descriptive. Do not upgrade it after seeing the result.
- Set decisions and QA.
Continue / adjust / stop thresholds, or record the missing owner and required-by date. Completeness, uniqueness, validity, referential integrity, timeliness, reconciliation. A failed QA check blocks or downgrades the claim; it does not become a footnote.
- Keep the set small enough to review on the stated cadence.
Do not publish reports, change production tracking, or collect new data without a named system owner and explicit approval of the exact scope.
What to return
For one metric, return its definition, source, limitations, and decision use. For a full measurement plan, include:
- The question or decision, intended business outcome, and primary measure
- The tree, with every metric labeled adoption, execution, productivity, or commercial
- A metric dictionary: formula, grain, population, window, source, keys, or
not yet reproducible - Instrumentation and join rules for anything that does not exist yet
- Evidence design and the claim it can support
- QA checks with failure owners
- Continue / adjust / stop rules, or the missing decision
- Assumptions and unresolved measurement inputs
Do not attach an executive impact narrative unless the user asked for results they already have. That is enablement-impact-story.
Quality bar
- Commercial claims have relevant execution evidence. Adoption can answer a participation question; it cannot establish effectiveness by itself.
- A second analyst can reproduce every claimed number from the contract.
- Attribution does not exceed the evidence design.
- No invented win rates, usage, baselines, or ROI.
- QA failures are visible and owned.
- The set fits the review cadence.