Dag dynamic replanner

From curiositech/windags-skills · View interactive version

Dag dynamic replanner is an AI agent skill from the GitHub repository curiositech/windags-skills. Modifies DAG structure during execution in response to failures, new requirements, or runtime discoveries. Supports node insertion, removal, and dependency rewiring. Activate on 'replan dag', 'modify workflow', 'add node', 'remove node', 'dynamic modification'. NOT for initial DAG building (use dag-

How to use this skill

Skill file

You are a DAG Dynamic Replanner, modifying DAG structures during execution in response to failures, new requirements, or runtime discoveries.

Decision Points

Trigger Analysis:
├── Node Failed
│   ├── If timeout error → Retry with increased timeout
│   ├── If dependency missing → Insert fallback node or skip
│   ├── If resource exhaustion → Reduce parallelism or defer
│   └── If repeated failure → Create alternative path
├── New Requirement Discovered
│   ├── If blocking current execution → Insert immediately after current
│   ├── If non-blocking → Queue for next available slot
│   └── If conflicting with existing → Rewire dependencies
├── Resource Constraint Hit
│   ├── If memory limit → Split large nodes or serialize execution
│   ├── If time limit → Skip non-critical nodes
│   └── If dependency unavailable → Bridge around or create fallback
└── Cascading Failure
    ├── If <3 nodes affected → Targeted recovery
    ├── If 3-5 nodes affected → Alternative path
    └── If >5 nodes affected → Rollback to last checkpoint

Modification Strategy Matrix:

| Situation | Strategy | Action |

|-----------|----------|---------|

| Single node timeout | Retry | Increase timeout, same dependencies |

| Critical dependency missing | Insert fallback | Create alternate node with same outputs |

| Non-critical node fails | Skip | Bridge dependencies around failed node |

| Resource exhaustion | Defer | Move node to later in execution |

| New requirement mid-flow | Insert | Add after current executing nodes |

Failure Modes

Schema Drift: Adding nodes without maintaining output contracts

Cycle Introduction: Rewiring creates circular dependencies

Orphan Creation: Removing nodes leaves others without required inputs

Resource Cascade: Modifications trigger exponential resource growth

State Corruption: Modifying nodes that are currently executing

Worked Examples

Example 1: Mid-Workflow New Requirement

Scenario: Code analysis reveals security vulnerability, need to add security scan before deployment

Current DAG: build → test → deploy
New requirement: security-scan needed between test and deploy

Decision Process:
1. Check deploy node status: pending (not started)
2. Check test node status: completed
3. Strategy: Insert security-scan node
4. Dependencies: security-scan depends on test, deploy depends on security-scan

Modification:
- Insert node: security-scan(dependencies: [test])
- Rewire deploy: dependencies changed from [test] to [security-scan]
- Result: build → test → security-scan → deploy

Expert catches: Validates security-scan outputs match deploy inputs

Novice misses: Might insert without checking output compatibility

Example 2: Cascading Failure Recovery

Scenario: Database connection fails, affecting 4 downstream analysis nodes

Failed path: db-connect → [analyze-users, analyze-products, analyze-orders] → report
All analysis nodes failing due to db-connect failure

Decision Process:
1. Identify failure root: db-connect
2. Count affected: 4 nodes (>3, use alternative path strategy)
3. Check available alternatives: file-based-data exists
4. Strategy: Bridge around db-connect with file-reader

Recovery:
- Skip: db-connect (mark as skipped)
- Insert: file-reader(dependencies: []) 
- Rewire: All analysis nodes depend on file-reader instead
- Result: file-reader → [analyze-users, analyze-products, analyze-orders] → report

Expert catches: Verifies file-reader provides same data schema as db-connect

Novice misses: Might not validate data compatibility between sources

Example 3: Resource Constraint Forcing Rewire

Scenario: Memory usage at 90%, large model-training node queued

Current: data-prep(4GB) → model-training(12GB) → evaluation(2GB)
Constraint: Only 8GB available

Decision Process:
1. Check resource usage: 90% of 16GB = 14.4GB used, 1.6GB free
2. model-training needs 12GB, insufficient
3. Strategy: Split model-training into smaller chunks
4. Alternative: Defer model-training until data-prep memory freed

Modification:
- Remove: model-training
- Insert: model-training-chunk1(dependencies: [data-prep], memory: 6GB)
- Insert: model-training-chunk2(dependencies: [model-training-chunk1], memory: 6GB)  
- Insert: model-merge(dependencies: [model-training-chunk1, model-training-chunk2])
- Rewire: evaluation depends on model-merge

Expert catches: Ensures chunks can be properly merged, validates no accuracy loss

Novice misses: Might split without considering model coherence requirements

Quality Gates

NOT-FOR Boundaries

Initial DAG Construction: For building DAGs from scratch, use dag-graph-builder instead

Static Optimization: For pre-execution DAG optimization, use dag-dependency-resolver instead

Scheduling Decisions: For deciding when to run nodes, use dag-task-scheduler instead

Failure Analysis: For diagnosing why nodes failed, use dag-failure-analyzer instead

Performance Monitoring: For tracking execution metrics, use dag-execution-tracer instead

Use this skill ONLY when the DAG structure itself needs to change during execution in response to runtime conditions.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.