Deployment philosophy

From paulpas/agent-skill-router · View interactive version

Deployment philosophy is an AI agent skill from the GitHub repository paulpas/agent-skill-router. Architects multi-stage deployment strategies that balance speed, safety, and reliability through systematic risk assessment and controlled change delivery.

How to use this skill

Skill file

Cloud Deployment Philosophy

Mental model for designing safe, reliable, and fast deployment systems. Treats every deployment as a risk management exercise: minimize blast radius, maximize feedback velocity, and maintain irreversible safety nets at every stage.

TL;DR Checklist


When to Use

Use this skill when:


When NOT to Use

Avoid this skill for:


Core Workflow

1. Assess Change Risk Profile

Classify the change by its potential impact on users, data, and system stability.

Checkpoint: You can articulate the maximum possible user impact of this change.

2. Define Acceptable Blast Radius

Determine how much harm the system can tolerate during a failed deployment. This depends on the change type, user base size, and business criticality.

Checkpoint: You have a numeric or qualitative statement of acceptable damage (e.g., "no data loss for more than 5% of users").

3. Select Deployment Strategy

Match the strategy to the blast radius:

| Blast Radius | Strategy | Rationale |

|---|---|---|

| Small (config change, no schema) | Rolling update | Fast, low risk, minimal overhead |

| Medium (new endpoints, backward-compatible) | Canary deployment | Gradual exposure with automated rollback |

| Large (schema change, data migration) | Blue-green | Instant rollback, full validation before switchover |

| Critical (payment, identity, data integrity) | Blue-green + manual gate | Human approval + instant rollback |

Checkpoint: Your chosen strategy directly limits blast radius to the acceptable level defined in Step 2.

4. Design Feedback Loops

Define what signals you'll watch during deployment and the thresholds that trigger rollback.

Checkpoint: Every deployment has at least three health signals (error rate, latency, business metric) with defined rollback thresholds.

5. Verify Rollback Path

Ensure you can reverse the deployment within the acceptable recovery time objective (RTO).

Checkpoint: You have tested the rollback path within the last 30 days. Untested rollback is not a rollback path.

6. Execute with Observability

Deploy while watching the feedback loops. Move at the pace of understanding, not the pace of automation.

Checkpoint: You can see the impact of the deployment in real-time before proceeding to the next stage.


Implementation Patterns

Pattern 1: Blast Radius Assessment

Before choosing any deployment strategy, explicitly calculate the blast radius. This is the set of users, data, and services affected by a single failed deployment.

❌ BAD — Implicit, Unassessed Blast Radius
# ❌ BAD: No risk assessment before deployment — just push and hope
# No assessment of who gets hit by failure
# No rollback plan
# No feedback loops defined
kubectl set image deployment/app app=app:v2.0.0
kubectl rollout restart deployment/app
echo "Deployed v2.0.0"

What's wrong:

✅ GOOD — Explicit Blast Radius Assessment
# ✅ GOOD: Assess blast radius before deployment
# Classifies change risk and determines acceptable impact boundaries

# --- Configuration ---
CHANGE_FILE="/tmp/deployment-change.json"

# Input JSON describing the change:
# {
#   "affected_user_percentage": 0.05,
#   "has_schema_change": false,
#   "has_data_migration": false
# }

# --- Risk Classification ---
classify_risk() {
  local affected_pct schema_change data_migration risk
  affected_pct=$(jq -r '.affected_user_percentage' "$CHANGE_FILE")
  schema_change=$(jq -r '.has_schema_change' "$CHANGE_FILE")
  data_migration=$(jq -r '.has_data_migration' "$CHANGE_FILE")

  if [[ "$schema_change" == "true" || "$data_migration" == "true" ]]; then
    risk="CRITICAL"
  elif [[ "$(echo "$affected_pct > 0.5" | bc -l)" -eq 1 ]]; then
    risk="MEDIUM"
  else
    risk="LOW"
  fi

  echo "$risk"
}

# --- Blast Radius Calculator ---
assess_blast_radius() {
  local risk affected_pct
  risk=$(classify_risk)
  affected_pct=$(jq -r '.affected_user_percentage' "$CHANGE_FILE")

  case "$risk" in
    CRITICAL)
      echo "Risk: CRITICAL"
      echo "Max affected users: 1%"
      echo "Max data loss: 0 rows"
      echo "Max recovery: 5 minutes"
      echo "Manual gate: REQUIRED"
      # For critical changes, restrict canary to 1%
      jq '.canary_weight = 0.01 | .requires_manual_gate = true' "$CHANGE_FILE" \
        > "${CHANGE_FILE}.assessed"
      ;;
    MEDIUM)
      echo "Risk: MEDIUM"
      echo "Max affected users: 25%"
      echo "Max recovery: 30 minutes"
      echo "Manual gate: optional"
      jq '.canary_weight = 0.25 | .requires_manual_gate = false' "$CHANGE_FILE" \
        > "${CHANGE_FILE}.assessed"
      ;;
    *)
      echo "Risk: LOW"
      echo "Max affected users: ${affected_pct} (full impact)"
      echo "Max recovery: 60 minutes"
      echo "Manual gate: not required"
      jq '.canary_weight = 0.05 | .requires_manual_gate = false' "$CHANGE_FILE" \
        > "${CHANGE_FILE}.assessed"
      ;;
  esac
}

# --- Execute Assessment (must run before deployment) ---
assess_blast_radius

# --- Pre-deployment validation ---
DEPLOY_CHANGE=$(jq '.has_schema_change' "$CHANGE_FILE")
if [[ "$DEPLOY_CHANGE" == "true" ]]; then
  echo "ERROR: Schema change detected. Ensure rollback path is tested."
  echo "Run: ./scripts/test-rollback.sh --schema-change"
  exit 1
fi

Pattern 2: Progressive Rollout Gates

Implement staged deployment gates that progressively increase exposure while monitoring health signals.

✅ GOOD — Progressive Rollout with Gates
# ✅ GOOD: Progressive rollout with automated health-gated stages
# Each stage increases traffic exposure only if health signals pass

# --- Configuration ---
APP_NAME="my-service"
ROLLOUT_STATE="/tmp/rollout-$(basename $APP_NAME).state"
HEALTH_ENDPOINT="http://localhost:9090/metrics"

# Define rollout stages (bash array of "stage:traffic_pct:observation_min")
STAGES=(
  "canary:0.05:10"
  "early_adopters:0.25:15"
  "half_traffic:0.50:30"
  "full_traffic:1.0:0"
)

# --- State management ---
get_current_stage() {
  if [[ -f "$ROLLOUT_STATE" ]]; then
    jq -r '.current_stage_index' "$ROLLOUT_STATE" 2>/dev/null || echo "-1"
  else
    echo "-1"
  fi
}

save_state() {
  local stage_index=$1
  jq -n --argjson idx "$stage_index" \
    '{current_stage_index: $idx, app: "'$APP_NAME'", updated_at: now}' \
    > "$ROLLOUT_STATE"
}

# --- Health check function ---
check_health() {
  local stage=$1
  local success_rate p99_latency

  # Query metrics endpoint (Prometheus-style or app-specific)
  success_rate=$(curl -s "$HEALTH_ENDPOINT" \
    | jq -r --arg s "$stage" '.metrics[] | select(.name == "http_success_rate" and .stage == $s) | .value')
  p99_latency=$(curl -s "$HEALTH_ENDPOINT" \
    | jq -r --arg s "$stage" '.metrics[] | select(.name == "p99_latency_ms" and .stage == $s) | .value')

  # Gate thresholds per stage
  case "$stage" in
    canary)
      # Strictest: 99.9% success, 500ms latency
      [[ "$(echo "${success_rate:-0} >= 0.999" | bc -l)" -eq 1 ]] && \
      [[ "$(echo "${p99_latency:-9999} < 500" | bc -l)" -eq 1 ]]
      ;;
    early_adopters)
      # Slightly relaxed: 99.5% success, 800ms latency
      [[ "$(echo "${success_rate:-0} >= 0.995" | bc -l)" -eq 1 ]] && \
      [[ "$(echo "${p99_latency:-9999} < 800" | bc -l)" -eq 1 ]]
      ;;
    half_traffic)
      # Relaxed: 99% success, 1000ms latency
      [[ "$(echo "${success_rate:-0} >= 0.99" | bc -l)" -eq 1 ]] && \
      [[ "$(echo "${p99_latency:-9999} < 1000" | bc -l)" -eq 1 ]]
      ;;
    *)
      # Full traffic: 99% success
      [[ "$(echo "${success_rate:-0} >= 0.99" | bc -l)" -eq 1 ]]
      ;;
  esac
}

# --- Advance to next stage ---
advance_stage() {
  local current_idx next_idx next_stage next_traffic next_obs
  current_idx=$(get_current_stage)
  next_idx=$((current_idx + 1))

  # Already at full rollout?
  if [[ $next_idx -ge ${#STAGES[@]} ]]; then
    echo "Already at full rollout (100% traffic)"
    return 0
  fi

  IFS=':' read -r next_stage next_traffic next_obs <<< "${STAGES[$next_idx]}"

  echo "Checking health gate for stage: $next_stage (traffic: $((next_traffic * 100))%)"

  if check_health "$next_stage"; then
    echo "Health gate PASSED for $next_stage"
    save_state "$next_idx"

    # Apply new traffic weight to canary
    kubectl patch deployment "$APP_NAME" -p \
      "{\"spec\":{\"template\":{\"metadata\":{\"labels\":{\"canary-weight\":\"$next_idx\"}}}}}"

    if [[ $next_obs -gt 0 ]]; then
      echo "Observation period: ${next_obs} minutes. Waiting..."
      sleep $((next_obs * 60))
    fi

    return 0
  else
    echo "Health gate FAILED for $next_stage — rolling back"
    rollback
    return 1
  fi
}

# --- Rollback helper ---
rollback() {
  echo "Rolling back to previous stage..."
  local prev_idx
  prev_idx=$(get_current_stage)
  prev_idx=$((prev_idx > 0 ? prev_idx - 1 : 0))
  IFS=':' read -r stage traffic obs <<< "${STAGES[$prev_idx]}"
  kubectl patch deployment "$APP_NAME" \
    --type='json' -p="[{'op':'replace','path':'/spec/template/metadata/labels/canary-weight','value':'$prev_idx'}]"
  echo "Rolled back to $stage ($((traffic * 100))% traffic)"
}

# --- Main rollout loop ---
echo "Starting progressive rollout for $APP_NAME"
echo "Stages: ${STAGES[*]}"

while advance_stage; do
  current_idx=$(get_current_stage)
  if [[ $current_idx -ge $((${#STAGES[@]} - 1)) ]]; then
    echo "Rollout COMPLETE — all traffic on new version"
    break
  fi
  echo "Stage $current_idx complete. Advancing..."
  sleep 5  # Short delay between stage checks
done

Pattern 3: Deployment Decision Matrix

A systematic decision framework for selecting deployment strategies based on change characteristics.

✅ GOOD — Deployment Decision Matrix
# ✅ GOOD: Systematic deployment strategy selection based on change characteristics
# Matches strategy to risk, not to tooling preference or convenience

# --- Decision function ---
# Usage: select_strategy --schema-change --data-migration --user-facing --rollback-tested
#        select_strategy --user-facing --no-canary-infra
#        select_strategy --internal-change

select_deployment_strategy() {
  local has_schema=false has_data_migration=false user_facing=false
  local rollback_tested=false has_canary=false

  while [[ $# -gt 0 ]]; do
    case "$1" in
      --schema-change)    has_schema=true; shift ;;
      --data-migration)   has_data_migration=true; shift ;;
      --user-facing)      user_facing=true; shift ;;
      --rollback-tested)  rollback_tested=true; shift ;;
      --canary-infra)     has_canary=true; shift ;;
      --internal-change)  user_facing=false; has_schema=false; shift ;;
      *) shift ;;
    esac
  done

  # Critical path: data integrity requires instant rollback capability
  if [[ "$has_schema" == true && "$has_data_migration" == true ]]; then
    if [[ "$rollback_tested" != true ]]; then
      echo "Strategy: blue-green"
      echo "Rationale: Data migration without tested rollback — blue-green ensures instant revert"
      echo "Manual gate: yes"
      echo "Estimated rollback: 30s"
      return
    fi
  fi

  # High-risk changes with canary infrastructure
  if [[ "$has_schema" == true && "$has_canary" == true ]]; then
    echo "Strategy: canary"
    echo "Rationale: Schema change with canary support — gradual exposure with automated rollback"
    echo "Manual gate: yes"
    echo "Estimated rollback: 120s"
    return
  fi

  # User-facing changes without canary infra
  if [[ "$user_facing" == true && "$has_canary" != true ]]; then
    echo "Strategy: blue-green"
    echo "Rationale: User-facing deployment without canary infrastructure — parallel environments for safe switching"
    echo "Manual gate: $([ "$rollback_tested" != true ] && echo 'yes' || echo 'no')"
    echo "Estimated rollback: 60s"
    return
  fi

  # Low-risk internal changes
  if [[ "$user_facing" != true && "$has_schema" != true ]]; then
    echo "Strategy: rolling"
    echo "Rationale: Low-risk internal change — rolling update minimizes deployment time"
    echo "Manual gate: no"
    echo "Estimated rollback: 300s"
    return
  fi

  # Default: conservative approach
  echo "Strategy: canary"
  echo "Rationale: Defaulting to canary — gradual exposure balances speed and safety"
  echo "Manual gate: $([ "$rollback_tested" != true ] && echo 'yes' || echo 'no')"
  echo "Estimated rollback: 120s"
}

# --- Example invocations ---
echo "=== Schema + data migration, untested rollback ==="
select_deployment_strategy --schema-change --data-migration --user-facing

echo ""
echo "=== User-facing, no canary infra, rollback tested ==="
select_deployment_strategy --user-facing --rollback-tested

echo ""
echo "=== Low-risk internal config change ==="
select_deployment_strategy --internal-change --rollback-tested

echo ""
echo "=== Schema change with canary infrastructure ==="
select_deployment_strategy --schema-change --user-facing --canary-infra --rollback-tested

Constraints

MUST DO

MUST NOT DO


Philosophy Alignment

This skill aligns with the 5 Laws of Elegant Defense by treating deployment as a layered defense system:

Early Exit

Parse Don't Validate

Atomic Predictability

Fail Fast

Intentional Naming


Related Skills

| Skill Name | When to Use | Relationship |

|------------|------------|--------------|

| blue-green-deployment | Use after this skill when choosing blue-green for your risk profile | Tactical: implements the blue-green strategy |

| canary-deployment | Use after this skill when choosing canary for your risk profile | Tactical: implements canary strategy with traffic splitting |

| deployment-orchestration | Use after this skill for multi-service deployment sequencing | Tactical: coordinates deployments across service boundaries |

| state-management | Use alongside for deployments involving schema or data changes | Complementary: handles the data consistency aspect |

| rollback-strategy | Use before this skill to define your rollback architecture | Prerequisite: your rollback capability constrains strategy choice |


Output Template

When applying this skill, your output should contain:

  1. Change Classification — Risk level (LOW/MEDIUM/HIGH/CRITICAL) with rationale
  2. Blast Radius — Maximum acceptable impact, derived from change characteristics
  3. Strategy Recommendation — Chosen deployment strategy with justification
  4. Health Gates — Required signals and thresholds for each deployment stage
  5. Rollback Plan — Verified rollback path with estimated recovery time

Example:

## Deployment Strategy Recommendation

**Change Classification:** HIGH (new endpoint + database index)
**Blast Radius:** 5% of users (canary stage), 100% (full rollout)
**Strategy:** Canary with progressive gates
**Health Gates:** success_rate > 99.9%, p99_latency < 500ms
**Rollback Plan:** Automated — traffic shifts back to v1.2.3 in < 30s

Skill Version: 1.0.0

Created: 2026-05-15

Maturity: stable

Completeness: 95%

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.