Change verification

From LeoYeAI/openclaw-master-skills · View interactive version

Change verification is an AI agent skill from the GitHub repository LeoYeAI/openclaw-master-skills. Pre/post change verification with baseline capture, diff analysis, and rollback decision guidance across Cisco IOS-XE/NX-OS, Juniper JunOS, and Arista EOS. Structured around a single change event lifecycle — before, during, and after — with impact classification and rollback criteria.

How to use this skill

Skill file

Change Verification

Event-driven change verification skill for structured change windows. Guides

baseline capture before a change, provides change execution safety patterns,

performs post-change diff analysis, and supports rollback decision-making when

unexpected deviations are detected.

This skill covers a single change event lifecycle (before → during →

after). For ongoing configuration drift detection and compliance auditing, use

the config-management skill instead.

Commands are labeled [Cisco], [JunOS], or [EOS] where syntax

diverges. Unlabeled statements apply to all three vendors.

Safety Note — Read-Write Operations: This skill includes procedures that

modify device state during change execution and rollback phases. Steps that

write to devices are marked with ⚠️ WRITE. Always confirm authorization,

change ticket approval, and maintenance window status before executing write

operations. Baseline capture and post-change verification steps are read-only

and safe to run at any time.

When to Use

Prerequisites

baselines; enable/configure privilege for change execution and rollback)

plan including timing criteria

will bounce, which adjacencies will flap

archival

Procedure

Follow these steps sequentially for each change event. Steps 1–2 are

always read-only. Steps 3–4 include write operations. Steps 5–6 are

analytical and drive the rollback decision.

Step 1: Pre-Change Baseline Capture

Capture device state snapshots before any changes. Store outputs with

timestamps for post-change comparison.

Routing state:

[Cisco]

show ip route summary
show ip bgp summary
show ip ospf neighbor

[JunOS]

show route summary
show bgp summary
show ospf neighbor

[EOS]

show ip route summary
show ip bgp summary
show ip ospf neighbor

Interface and adjacency state:

All vendors — capture interface status, error counters, and neighbor tables:

[Cisco]

show interfaces summary
show cdp neighbors
show ip arp

[JunOS]

show interfaces terse
show lldp neighbors
show arp no-resolve

[EOS]

show interfaces status
show lldp neighbors
show ip arp

Configuration and hardware:

[Cisco]

show running-config
show environment all
show inventory

[JunOS]

show configuration
show chassis environment
show chassis hardware

[EOS]

show running-config
show environment all
show inventory

⚠️ WRITE — Archive baseline config to persistent storage:

[Cisco] copy running-config flash:pre-change-[ticket]-[date].cfg

[JunOS] request system configuration save /var/tmp/pre-change-[ticket].conf

[EOS] copy running-config flash:pre-change-[ticket]-[date].cfg

Record baseline metrics for comparison: total route count, BGP peer count

(Established), OSPF neighbor count (Full), interface error counters, and

hardware sensor readings.

Step 2: Change Scope Documentation

Before executing any changes, document:

  1. Change description — what configuration lines are being added, modified,

or removed

  1. Expected impact — which peers will flap, which routes will shift, which

interfaces will bounce, expected duration of disruption

  1. Rollback trigger criteria — specific thresholds that mandate rollback

(see Threshold Tables below)

  1. Rollback procedure — exact commands to revert (see

references/cli-reference.md for vendor-specific rollback commands)

  1. Success criteria — what "done" looks like: all baselines restored,

intended changes visible, no unexpected deviations

  1. Soak period — how long to monitor after change before declaring success

Step 3: Change Execution

⚠️ WRITE — Apply changes using commit-confirm patterns when available.

[Cisco] — No native commit-confirm. Apply changes in config mode and

immediately verify. For bulk changes, use configure replace with a prepared

config file.

[JunOS] — Use commit confirmed [minutes] to auto-rollback if not

confirmed within the timer window. Confirm with commit after verification.

configure
# ... apply changes ...
commit confirmed 5
# ... verify ...
commit

[EOS] — Use configure session for atomic staged changes. Review before

committing.

configure session change-[ticket]
# ... apply changes ...
show session-config
commit

Staged rollout for multi-device changes: Apply to one device first, verify

post-change state (Step 4), then proceed to remaining devices only after the

first device passes all checks.

Step 4: Post-Change Verification

Re-capture all baseline metrics from Step 1 using identical commands. Perform

a structured diff against pre-change baselines.

Key comparisons:

| Metric | Compare Against | Expected Outcome |

|--------|----------------|------------------|

| Route count | Pre-change summary | Within deviation threshold |

| BGP peers Established | Pre-change peer list | All peers restored (or changed per plan) |

| OSPF neighbors Full | Pre-change neighbor list | All adjacencies restored |

| Interface errors | Pre-change counters | No new sustained errors |

| Config diff | Archived pre-change config | Only intended lines changed |

Config diff verification:

[Cisco]

show archive config differences flash:pre-change-[ticket]-[date].cfg system:running-config

[JunOS]

show | compare rollback 1

[EOS]

diff running-config flash:pre-change-[ticket]-[date].cfg

Review every line in the diff output. Classify each changed line as expected

(directly part of the change plan) or unexpected (not in the change scope).

Step 5: Impact Assessment

Classify all deviations from baseline into categories:

  1. Expected — Intended: Changes that are the direct goal of the change

window (e.g., new BGP peer appearing, old ACL removed). No action needed.

  1. Expected — Side Effect: Changes caused by the intended change but not

the primary goal (e.g., route count increase because a new peer is now

advertising). Verify they are benign.

  1. Unexpected — Minor: Deviations not related to the change scope but low

severity (e.g., a single interface counter increment). Investigate but do

not necessarily roll back.

  1. Unexpected — Critical: Deviations indicating collateral damage (e.g.,

adjacency loss on an unrelated interface, route withdrawal not in change

scope). Evaluate rollback immediately.

If any deviation is classified as Unexpected — Critical, proceed directly

to Step 6 rollback evaluation.

Step 6: Rollback Decision

Evaluate whether to accept the change or roll back using the criteria below.

Rollback if ANY of these conditions are true:

the change plan

baseline

not met)

Accept if ALL of these conditions are true:

⚠️ WRITE — If rolling back:

[Cisco] configure replace flash:pre-change-[ticket]-[date].cfg force

[JunOS] rollback 1 then commit

[EOS] configure replace flash:pre-change-[ticket]-[date].cfg

After rollback, re-run Step 4 post-change verification to confirm the device

has returned to its pre-change state.

Threshold Tables

Acceptable Deviation Thresholds

| Metric | Normal Deviation | Warning | Rollback Trigger |

|--------|-----------------|---------|------------------|

| IPv4 route count | ±2% of baseline | ±5% of baseline | >10% or unplanned loss |

| IPv6 route count | ±2% of baseline | ±5% of baseline | >10% or unplanned loss |

| BGP Established peers | 0 lost (unless planned) | 1 lost (if in scope) | ≥1 lost outside scope |

| OSPF Full adjacencies | 0 lost (unless planned) | Flap then recover <2 min | Lost >2 min |

| Interface errors (new) | 0 new CRC/input errors | <10 in first 5 min | Sustained >10/min |

| Interface flaps | 0 (unless planned bounce) | 1 flap on in-scope intf | Any flap outside scope |

Rollback Timing Thresholds

| Phase | Maximum Duration | Action if Exceeded |

|-------|-----------------|-------------------|

| Change execution | Per change ticket | Pause and escalate |

| Post-change convergence | 5 minutes | Begin rollback assessment |

| Adjacency re-establishment | 2 minutes per peer | Escalate if critical peer |

| Route table stabilization | 3 minutes | Check for route oscillation |

| Soak period (minor change) | 15 minutes | Declare success or investigate |

| Soak period (major change) | 60 minutes | Declare success or investigate |

| Rollback execution | 5 minutes | Escalate to senior engineer |

Decision Trees

Post-Change Diff Contains Unexpected Lines

Config diff shows unexpected changes
├── Lines are in sections RELATED to change scope
│   ├── Side effect of intended change (e.g., auto-generated route-map sequence)
│   │   └── Classify as Expected — Side Effect → Document and accept
│   └── Unintended consequence (e.g., wrong interface affected)
│       └── Classify as Unexpected — Critical → Evaluate rollback
└── Lines are in sections UNRELATED to change scope
    ├── Timestamps, counters, or cosmetic changes (e.g., "Last configuration change")
    │   └── Classify as Expected — Side Effect → Ignore
    └── Substantive config changes (e.g., ACL modified, route-map added)
        └── Classify as Unexpected — Critical → Immediate rollback

Adjacency Loss Detected Post-Change

Neighbor/peer no longer in expected state
├── Device IS in the change scope
│   ├── Interface was intentionally bounced per change plan
│   │   ├── Adjacency recovers within timing threshold
│   │   │   └── Expected — document recovery time
│   │   └── Adjacency does NOT recover within threshold
│   │       └── Investigate → Check interface state, cable, peer config
│   └── Interface was NOT intentionally bounced
│       └── Unexpected — Critical → Check for config error → Rollback if unresolved
└── Device is NOT in the change scope
    ├── Peer is on a device that IS in scope (far-end impact)
    │   └── Expected side effect → Verify peer recovers within threshold
    └── Peer is on a device NOT in scope (unrelated)
        └── Unexpected — Critical → Unrelated failure, separate investigation

Route Count Deviation Outside Normal Threshold

Route count differs from baseline beyond ±2%
├── Change plan includes prefix addition or removal
│   ├── Deviation direction matches plan (added routes = count increase)
│   │   └── Expected — verify exact prefix matches plan
│   └── Deviation direction opposes plan (planned addition but count decreased)
│       └── Unexpected — Critical → Check BGP/OSPF process, peer state
├── Change plan does NOT include routing changes
│   ├── Deviation is <5% and routes are from in-scope device peers
│   │   └── Warning — likely convergence artifact → Monitor for 3 min
│   └── Deviation is >5% OR routes from out-of-scope sources
│       └── Unexpected — Critical → Evaluate rollback
└── Route oscillation detected (count fluctuating)
    └── Unexpected — Critical → Routing loop or flapping → Immediate rollback

Report Template

# Change Verification Report — [Ticket ID]

## Change Summary
- **Ticket:** [ID]
- **Date/Time:** [Start] — [End]
- **Devices:** [list]
- **Change Type:** [routing | switching | security | upgrade | other]
- **Executed By:** [name/team]

## Pre-Change Baseline
- Route count (IPv4/IPv6): [count]
- BGP peers Established: [count]
- OSPF adjacencies Full: [count]
- Interface errors (notable): [any]
- Config archived to: [location]

## Change Execution
- Method: [manual | commit-confirm | session | replace]
- Duration: [minutes]
- Issues during execution: [none | description]

## Post-Change Verification
- Route count (IPv4/IPv6): [count] (Δ [change])
- BGP peers Established: [count] (Δ [change])
- OSPF adjacencies Full: [count] (Δ [change])
- Interface errors (new): [count]
- Config diff lines: [expected: N, unexpected: N]

## Impact Assessment
- Expected — Intended: [list]
- Expected — Side Effect: [list]
- Unexpected — Minor: [list or none]
- Unexpected — Critical: [list or none]

## Decision
- **Result:** [ACCEPTED | ROLLED BACK | ESCALATED]
- **Rationale:** [reason]
- **Soak period:** [duration, outcome]

## Action Items
- [ ] [any follow-up tasks]

Troubleshooting

Baseline capture commands fail or return incomplete output

terminal buffer limits. Use terminal length 0 [Cisco/EOS] or

set cli screen-length 0 [JunOS] before capture.

[Cisco] / show system processes extensive [JunOS] /

show processes top [EOS] to verify.

note the location for later retrieval.

Config diff shows excessive noise

(e.g., ! Last configuration change at ...).

[Cisco], show archive config differences may include line-order

differences that are not real changes — focus on substantive config lines.

change-relevant sections rather than full config comparison.

Adjacency does not recover after expected bounce

up/down to distinguish physical vs protocol issues.

both sides of a link (e.g., mismatched OSPF area, BGP ASN) will prevent

adjacency formation.

hold time is 180s. Wait at least one full timer cycle before escalating.

Rollback command fails or produces unexpected state

enabled. If unavailable, manually reverse the config changes line by line.

the device has rebooted since the baseline commit. Use

show system commit to verify available rollback points.

config, not a partial fragment. Verify the archived file is a full

show running-config capture.

confirm the device has returned to its pre-change state.

Change window time exceeded before verification completes

first, defer detailed config diff analysis to after the window if services

are healthy.

and schedule a follow-up verification at the next opportunity.

do not delay rollback due to window constraints if there is active service

degradation.