Campaign Protocol v1.0: Architect-Tier Orchestration
Absorb → Survey → Plan → Orchestrate → Dispatch ⇄ Reconcile → Close
This workflow defines the /campaign execution loop for architect-class
(expensive, long-horizon) walkers coordinating heterogeneous model tiers
across a multi-workstream goal. The council's primary output genre is
not code — it is boundary conditions for cheaper walks, and judgment
on the work that returns.
Philosophy
The Hourglass
Expensive tokens belong at the waist, not the edges:
wide: cheap tier + human — boundary refinement (/boundary → IBC*)
narrow: one council pass — exhaustive survey, planning, orchestration
wide: cheap tier — disciplined worker execution (/refine, /core)
deterministic evaluators between every layer
The council ingests an approved $\text{IBC}^*$ (manufactured by the
boundary loop), saturates its shared context through
an exhaustive multi-agent survey, and emits a graph of saturated worker
IBCs routed to the cheapest capable tier. Error-correction iterations run
in cheap space; the council re-enters only to judge and realign.
The Plan Is a DAG of Boundary Conditions
A campaign plan is not a task list. It is a **dependency graph of IBCs
whose premises reference world state that sibling executions mutate**.
When worker P3 lands an unexpected fix, the premises baked into pending
prompts P4–P9 may now describe a world that no longer exists. An open-loop
dependency graph drifts exactly like an open-loop token walk, only at a
coarser timescale. Hence two central invariants that are examined together
at every RECONCILE boundary:
Premise Freshness: before dispatching any pending node, re-verify
its IBC's premises (S1 tripwires) against current
HEAD. A stale
premise marks the node
INVALIDATED; its IBC is realigned before
dispatch.
Goal Supremacy / Mutable DAG: execution yields exponentially more
context than planning — the higher-level goal reigns over the
pre-specified DAG skeleton, not the reverse. At every
RECONCILE
boundary the composer runs the cheap DAG-vs-goal check; the moment it
suggests the graph no longer serves the goal, the architect seat is
convened (this, not routine per-node review, is what summons it). DAG
amendments — adding, editing, or removing nodes — are the
norm, not a deviation; staying faithful to an arbitrary initial
structure while overlooking what execution revealed is the failure mode
this guards against. Each amendment routes to the architect seat and is
TIERED by the contract (§Amendment tiers under RECONCILE): a MECHANICAL
amendment proceeds on the architect's recorded single assent; a
LOAD-BEARING amendment is ratified by the head before any affected
node is re-dispatched.
Both checks are mechanical and cheap — they SHOULD themselves run on a cheap tier.
The Council as Final Judge
Workers execute under their assigned discipline workflows, but
no worker self-certifies. Every landed changeset returns to the
council's RECONCILE state, which judges it with
git-review semantics against the worker's own
IBC: acceptance evaluators re-run, coherence checklist applied, commit
hygiene verified. The council is constantly judging whether the campaign
has proceeded correctly — that judgment, not code emission, is what the
expensive tokens buy.
Readiness Is Measurable
Campaign failure is almost never the worker model failing to write code;
it is the context the code was written against — thin doctrine at the
point of work, prose seams two workers read differently, identity-bearing
surfaces with no machine gate, premises that drifted. All of that is
preparable, and preparation quality is gaugeable before dispatch:
- Evaluator coverage — of the acceptance criteria on the DAG's
path, what fraction carries a pre-built machine evaluator (a
violation fixture, golden vector, lint, or law test) rather than an
agent-check? Target ~100%; every agent-check residue is justified in
the routing table.
- Comprehension-probe score — every worker IBC passes the
zero-context probe (boundary §Comprehension Probe):
unanswered questions ~0, plan-vs-intent divergence resolved, canary
traps not bitten.
- Seam-type completeness — every DAG edge between nodes crosses a
committed, compiling contract (type, trait, schema, fixture),
never prose. Two workers meeting in the middle of a sentence is a
defect class; count the edges.
- Red-test / golden-vector inventory — nodes whose acceptance
tests exist-and-fail before dispatch; serialization and identity
surfaces with byte-exact golden vectors (where wrong is silent,
vectors make it loud).
The counterweight is the **anti-over-preparation rule: prepare
evaluators and seams, never solutions.** Pre-written implementation code
goes stale and becomes premise-drift liability; the metrics above gauge
walls and rails, not pre-walked paths. The end-state test: every failure
available to a worker is either caught by a machine gate inside its own
loop, or is a genuine design discovery worth escalating — the metrics
exist to squeeze out the third category, the anticipatable stupidity.
Working Set vs Flight Recorder
The campaign maintains two stores with different mutability and durability:
| Store | Role | Git status |
| :--- | :--- | :--- |
| .scratch/<topic>/ | Controller's live state — the current boundary conditions, mutable and realigned as the campaign evolves | Ignored, never committed |
| .ledger/log/ | Flight recorder — the trace from which the trajectory is reconstructed | Committed in the .ledger/ subrepo |
.scratch/<topic>/
├── REVIEW.md # Survey report (evidence-grounded findings)
├── PLAN.md # Mitigation plan: the campaign DAG, living
├── ORCHESTRATION.md # Routing table: node → tier → discipline
└── prompts/
├── P1-<slug>.md # Worker IBCs per templates/IBC.md
└── ...
Checkpoint Durability Invariant: at every
RECONCILEboundary the
sketch records a checkpoint sufficient to regenerate the scratch state —
which nodes dispatched/accepted/invalidated, what realignments occurred
and why. A crash mid-campaign may cost working files, never the
campaign: resume MUST derive from sketch + git alone.
Scope
[!IMPORTANT]
/campaignis for multi-workstream initiatives where survey, routing,
and reconciliation across model tiers pay for themselves. A single
well-scoped change goes straight to
/core; a single-artifact polish
goes to
/refine. Do not stand up a campaign for work one disciplined
walker can finish — the orchestration overhead is itself a token cost.
Grammar
The controller's session state — the live topic, phase, and context:
# METADATA
TOPIC: "topic-slug"
STATUS: [ABSORB | CLARIFY | SURVEY | PLAN | ORCHESTRATE | DISPATCH | RECONCILE | CLOSE | HALT]
# CONTEXT
CTX:
IBC_PATH: "path/to/approved/campaign/IBC" # The boundary this campaign launches from
GOAL: "Verbatim objective from the IBC"
MODE: [INTERACTIVE | AUTONOMOUS]
SCRATCH_PATH: ".scratch/<topic>"
The persistent campaign artifacts — the findings ledger, the campaign DAG, the
reconcile log, and the live context map — are not redefined here. Their
schemas are the locked Nickel contracts under