Social calendar

From qa-aman/claude-skills · View interactive version

Social calendar is an AI agent skill from the GitHub repository qa-aman/claude-skills. Plan a monthly content calendar across channels using the Content Marketing Matrix (Dave Chaffey, Smart Insights) - Entertain/Inspire/Educate/Convince. Every post gets a quadrant label. The monthly calendar must hit 40% Educate, 40% Inspire+Convince, 20% Entertain. Produces a week-by-week posting sc

How to use this skill

Skill file

social-calendar

Plans a full month of content across channels. Every post has a job tied to a business goal and a quadrant in the Content Marketing Matrix. No random posting. No quadrant over-concentration.

Framework: Content Marketing Matrix

The 2x2 Matrix (Dave Chaffey, Smart Insights)

Chaffey's Content Marketing Matrix exists to answer one question that a list of post ideas never answers: is this month's content actually capable of producing the outcome the month is being judged on? A calendar can be full, on-brand, and well written, and still sit entirely in one quadrant, in which case it can only produce one kind of result.

Map content by two axes:

The 4 quadrants:

| Quadrant | Axes | Purpose | Content types | Primary metrics |

|---|---|---|---|---|

| ENTERTAIN | Emotional + Awareness | Build brand affinity through personality | Behind-the-scenes, culture, storytelling, humor | Reach, shares, followers |

| INSPIRE | Emotional + Purchase | Drive action through aspiration and proof | Case studies, testimonials, transformation stories | Demo requests, trial signups |

| EDUCATE | Rational + Awareness | Build authority through useful information | How-to guides, research, explainer posts, frameworks | Saves, newsletter signups, shares |

| CONVINCE | Rational + Purchase | Close through logic and proof | Comparison posts, ROI data, product demos, pricing | Conversions, trial starts |

Placing a post in the matrix

Two questions, in order. Do not skip to the label.

  1. Does this post argue, or does it make them feel something? Argue (data, steps, comparison, proof) is the rational half. Feel (story, personality, aspiration) is the emotional half.
  2. Could someone act on this today, or is it for someone who does not know they have the problem? Act today is the purchase half. Does not know yet is the awareness half.

Ambiguity is normal. When a post genuinely straddles two quadrants, assign it the one it is being measured on, and note the second in brackets. A customer story assigned to INSPIRE but measured on saves is really EDUCATE, and counting it as INSPIRE hides a proof gap.

The 40/40/20 Rule

This split is a default, and the default is derived from the goal, not the other way round. Adjust it deliberately, state the adjustment in the calendar summary, and never adjust it silently:

| Month's goal | EDUCATE | INSPIRE | CONVINCE | ENTERTAIN | Why |

|---|---|---|---|---|---|

| Default / mixed | 40% | 20% | 20% | 20% | Balanced pipeline and audience |

| Awareness or new audience | 50% | 15% | 5% | 30% | Nobody is ready to buy yet, so CONVINCE spends attention for nothing |

| Demand gen / pipeline | 30% | 30% | 30% | 10% | Proof and logic carry the month |

| Launch or event | 25% | 25% | 40% | 10% | CONVINCE is the point, but proof must carry it or it reads as noise |

| Retention or community | 35% | 25% | 5% | 35% | Existing customers do not need convincing, they need reasons to stay |

Warning Signs

Flag these in the calendar summary if they appear, in this priority order. The first two are stop conditions: raise them and get a decision before finalising the calendar.

| Warning sign | What it means | Action |

|---|---|---|

| 0% INSPIRE | No social proof anywhere in the month | Stop. This is the most common and most expensive gap in a B2B calendar. If no proof asset exists to point at, that is the real finding. Say so and mark the slots [NEEDS PROOF] |

| >60% in any one quadrant | The calendar can only produce one kind of result | Stop. Rebalance before writing week by week, not after |

| <10% EDUCATE | No authority building, so the audience has no reason to follow | Flag and propose which posts to convert |

| >60% CONVINCE | Audience fatigue, which shows up as falling engagement before it shows up as falling conversion | Flag. Convert the weakest CONVINCE posts to EDUCATE with the same proof point |

| >60% ENTERTAIN | Brand awareness with no path to pipeline | Flag against knowledge/kpis.md and ask whether that is the actual goal |

| One pillar over 50% of posts | A single-topic month, which caps reach at the people already interested in that topic | Flag and rebalance |

| Same quadrant three posts running on one channel | Reads as a campaign the audience did not opt into | Reorder rather than rewrite |

Weekly coverage rule

Each week should cover at least 3 of the 4 quadrants. A week that is all EDUCATE or all CONVINCE is out of balance.

Capacity check before cadence

The most common way a calendar fails is that it is never produced. Before accepting a cadence, cost it and compare against who is actually available:

| Format | Rough production load | Needs |

|---|---|---|

| Text post | Lowest | Writer only |

| Thread | Low | Writer only |

| Poll | Lowest | Writer only |

| Carousel or document | High | Writer plus designer, with review time between them |

| Newsletter issue | High | Writer plus edit pass |

| Video or audio | Highest | Script, record, edit, caption |

| Long-form blog | Highest, and the longest lead time | Draft, edit, SEO pass, publish |

Rule: if the requested month contains more high-load and highest-load assets than the team can name an owner for, say so before building the calendar, and propose the version that can actually ship. A calendar that is 60% produced is worse than a smaller one that is fully produced, because the gaps land unpredictably and break the weekly arc. Never present a cadence the user has not confirmed is achievable.

When to use

Inputs needed

  1. Month and year: which month to plan (default: next calendar month)
  2. Channels: LinkedIn organic, Twitter/X, newsletter, blog, YouTube - pick which apply
  3. Primary goal this month: awareness, demand gen, retention, or event-driven (launch, webinar, conference)
  4. Posting cadence per channel: how many times per week per channel (ask if not provided)
  5. Themes or constraints: product launches, campaigns, events, or topics to avoid

Process

  1. Load context. Read knowledge/brand/voice.md, knowledge/icp/personas.md, knowledge/kpis.md. If knowledge/brand/voice.md is missing, stop: "I need voice context. Run /brand-context first."
  1. Check knowledge/learnings.md for past content performance data. Surface any patterns: what formats outperformed, what topics resonated, what cadence worked.
  1. Check knowledge/content-library/ for existing content that can be repurposed or sequenced into the month.
  1. Define the month's content pillars (3-4 max):
  1. Pre-check the quadrant distribution before building week-by-week:
  1. Build the calendar week by week:

```

# Content calendar: [Month YYYY]

Goal: [primary goal]

Channels: [list]

Cadence: [X posts/week per channel]

Pillars:

Quadrant distribution target: [N] EDUCATE | [N] ENTERTAIN | [N] INSPIRE | [N] CONVINCE


## Week 1 (DD-MM to DD-MM) | Quadrants this week: Ed, I, C, En

| Day | Channel | Format | Pillar | Quadrant | Topic/Angle | Asset needed |

|---|---|---|---|---|---|---|

| Mon | LinkedIn | Text post | P1 | EDUCATE | [specific angle] | None - write in chat |

| Wed | LinkedIn | Carousel | P2 | INSPIRE | [specific angle] | 6-slide design |

| Thu | Newsletter | Issue | P3 | EDUCATE | [specific angle] | Full draft |

| Fri | Twitter/X | Thread | P1 | CONVINCE | [specific angle] | None - write in chat |

Week 1 theme: [one sentence connecting the week's posts]

Leading into: [what week 2 builds toward]

Quadrant coverage this week: Ed (2), I (1), C (1), En (0) - [flag if <3 quadrants covered]

## Week 2 (DD-MM to DD-MM)

[same format]

## Week 3 (DD-MM to DD-MM)

[same format]

## Week 4 (DD-MM to DD-MM)

[same format]


## Quadrant distribution summary

| Quadrant | Count | % of total | Target | Status |

|---|---|---|---|---|

| EDUCATE | X | X% | 40% | [on track / over / under] |

| ENTERTAIN | X | X% | 20% | [on track / over / under] |

| INSPIRE | X | X% | 20% | [on track / over / under] |

| CONVINCE | X | X% | 20% | [on track / over / under] |

Warning sign flags: [list any quadrant >60% or missing entirely, or clear the flags]


## Asset production queue

List every asset that needs to be created, by type:

## Skills to run for production

```

  1. Self-check. Every item is checkable against the saved calendar file. Count the rows rather than asserting the property.
  1. Save to output/social-calendar/<DD-MM-YYYY>-<month-slug>.md with frontmatter:

```yaml


format: social-calendar

month: [Month YYYY]

goal: [awareness|demand|retention|launch]

channels: [list]

pillars: [list]

quadrant-distribution: {educate: X%, entertain: X%, inspire: X%, convince: X%}

created: DD-MM-YYYY


```

  1. Offer next actions:

Channel-specific rules

These are starting defaults, not measured facts. Where knowledge/learnings.md holds this

account's own performance data, that data overrides every rule in this section, and the calendar

must say so. Never present a cadence or a best-day claim to a client as though a platform

published it.

LinkedIn organic:

Twitter/X:

Newsletter:

Blog/SEO:

Rules

Never invent

What this skill cannot know

These are limitations of the skill, not of the plan. Anything below that reaches the output must carry [UNVERIFIED] there.

Related skills

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.