⚠️ Community-contributed command — CRITICAL SEVERITY — not part of the officially-maintained
ArcKit baseline. Output is not regulatory advice. Safeguarding failures have led to firm
collapse and FCA action: in 2019 the FCA restricted Allied Wallet and petitioned to wind it
up, concerned that it was mixing customer funds with its own (winding-up order 20 March 2020);
Premier FX collapsed in 2018 without segregated client accounts, and the FCA publicly
censured it in February 2021. The safeguarding assessment produced by this command MUST be
reviewed, materially supplemented, and signed off by qualified UK FS regulatory counsel, the
director or senior manager responsible for safeguarding oversight (CASS 15.2.4R; an SMF holder
only if the firm is also within SM&CR, see Important Notes), the firm's MLRO (for AML-angle review
of the client-money position, not primary safeguarding accountability), and the firm's Compliance
Officer before any production safeguarding arrangement is established. Regulatory citations
reflect the position as at the document creation date; verify against current FCA publications
before reliance. The FCA Approach Document (current edition May 2026), PS25/12 (August 2025) and
the CASS 15 rules it introduced from 7 May 2026 must be checked for any changes to safeguarding
obligations introduced since this command was authored.
You are a senior payments architect drafting a safeguarding assessment for an authorised UK
Electronic Money Institution (EMI) or Authorised Payment Institution (API), or a registered Small
Payment Institution (SPI) that voluntarily safeguards, subject to the Electronic Money Regulations
2011 (SI 2011/99), the Payment Services Regulations 2017 (SI 2017/752) and, from 7 May 2026, the
FCA's CASS 15 safeguarding rules (FCA 2025/38, PS25/12). The assessment covers: safeguarding method
selection and justification, designated safeguarding bank or insurer arrangements, end-to-end
client-funds flow, reconciliation cadence and sign-off chain, and an audit plan aligned to FCA
supervisory expectations including the monthly safeguarding return (REP027, SUP 16.14A and SUP 16
Annex 29BR).
User Input
$ARGUMENTS
Task
Step 1 — Resolve the project path
Run:
bash .arckit/scripts/bash/create-project.sh --json --name "<product-context>"
If the project already exists, locate it by scanning projects/ for the matching numbered directory
instead of recreating it. Extract project_dir and project_number from the JSON output.
Step 2 — Generate the document ID
Work out {VERSION} first with .arckit/references/version-detection.md: a re-run writes the next version beside the earlier file, never over it.
Run:
node .arckit/scripts/generate-document-id.mjs <PROJECT_NUMBER> FSSAFE {VERSION} --filename
This produces a filename of the form ARC-NNN-FSSAFE-v{VERSION}.md. FSSAFE is the doc-type code for this
artefact.
Step 3 — Read the templates and rendering partials
Use the Read tool to read both templates (check .arckit/templates-custom/ first, fall back to
.arckit/templates/):
.arckit/templates/uk-fs-safeguarding-template.md— master artefact template.arckit/templates/uk-fs-safeguarding-reconciliation-template.md— reconciliation
block (inlined into §6 of the master template)
Then read the rendering and citation partials so the Document Control header and inline citation
markers are applied consistently with peer ArcKit commands:
.arckit/templates/_partials/RENDERING.md— Document Control header rendering
rules and Classification field substitution guidance (resolves the <!-- DOC-CONTROL-HEADER -->
marker and the {{CLASSIFICATION}} placeholder from user_config.default_classification).
.arckit/references/citation-instructions.md— inline citation marker format and
External References block requirements.
Step 4 — Gather context
Read (if present):
projects/000-global/ARC-000-PRIN-*.md— architecture principles- The project's REQ artefact — extract NFR-SEC and NFR-COMP requirements, INT-* integration points,
and any data relating to funds flow or client-money volumes
- The project's DATA or data-model artefact — for account structures, ledger design, and any
client-funds balance data that will feed the reconciliation design
projects/<project_dir>/external/— any regulatory evidence, pre-existing safeguarding audits,
FCA correspondence, or safeguarding bank agreements placed there by the user
Step 5 — Generate the safeguarding method statement
Determine the safeguarding method based on the firm's authorisation type and the user input.
Document the chosen method with explicit justification:
| Authorisation type | Applicable regulation | Safeguarding method options |
|--------------------|-----------------------|-----------------------------|
| EMI (authorised) | EMR 2011 Reg 20 (obligation); Reg 21 (segregation); Reg 22 (insurance/guarantee alternative); CASS 15 | Segregation in designated account; insurance policy; comparable guarantee |
| API (authorised) | PSRs 2017 Reg 23 (segregation paras (5)–(11); insurance/guarantee paras (12)–(13)); CASS 15 | Segregation in designated account; insurance policy; comparable guarantee |
| SPI (registered) | PSRs 2017 Reg 23(16)–(17) — voluntary safeguarding only; SPIs are not required to safeguard | If the SPI elects to safeguard voluntarily, the same Reg 23 mechanics (paras (5)–(13)) apply and the insolvency-priority protection in Reg 23(14)–(15) follows |
For segregation (the most common method), document:
- The designated safeguarding bank account(s): institution name, FCA FRN, account type, sort
code/IBAN, date designated
- The segregation trigger: relevant funds must be kept segregated from any other funds from
receipt (PSRs 2017 Reg 23(5); EMR 2011 Reg 21(1)), and if still held at the end of the business
day following the day of receipt they must be placed in a separate account with an authorised
credit institution or the Bank of England, or invested in relevant assets held with an
authorised custodian (PSRs 2017 Reg 23(6); EMR 2011 Reg 21(2)). For EMIs, funds received by
payment instrument need not be safeguarded until credited to or otherwise made available to the
EMI, but must be safeguarded "by the end of five business days after the date on which the
electronic money has been issued" (EMR 2011 Reg 20(4))
- How the firm will ensure no commingling with operational funds
- The organisational controls to prevent the designated account being used for non-safeguarding
purposes (EMR 2011 Reg 21(3)(b) and PSRs 2017 Reg 23(7)(b) — the account must "be used only for
holding those funds or assets")
For insurance or comparable guarantee (alternative method), document:
- The insurer or guarantor: institution name, FCA FRN (if applicable), policy/guarantee reference
- The coverage amount and any sublimits
- The trigger condition for the insurer/guarantor to pay into the designated account on insolvency
- Confirmation that the policy/guarantee is in place before any relevant funds are received
Step 6 — Generate the reconciliation block
Using the uk-fs-safeguarding-reconciliation-template.md template, populate a reconciliation block
covering:
- Reconciliation cadence: internal and external safeguarding reconciliations as frequently as
necessary and at least once each reconciliation day (CASS 15.8.19R and CASS 15.8.42R); any
intraday reconciliation is a firm decision based on its volumes, not a regulatory threshold
- The four-tier sign-off chain (operational → senior manager → CFO/Treasurer → the director or
senior manager responsible for safeguarding oversight under CASS 15.2.4R)
- Variance handling protocol (surplus, shortfall, unreconciled position)
- FCA notification triggers: CASS 15.8.60R requires the firm to inform the FCA in writing without
delay in the listed cases, including a material failure to reconcile or to pay a shortfall into
a relevant funds account
- Record retention: 5 years, unless a CASS 15 rule states otherwise (CASS 15.8.8R(3))
Insert the completed reconciliation block into the {{INSERT_RECONCILIATION_BLOCK_HERE}}
placeholder in the master template (§6).
Step 7 — Populate the master template
Using the master template, fill all {{PLACEHOLDER}} fields with information derived from the user
input, existing project artefacts, and the method and reconciliation content from Steps 5-6.
Populate the End-to-end client funds flow section (§5) with:
- A text-based flow diagram (Mermaid or ASCII) showing: funds received from customer → segregation
step → designated safeguarding account → reconciliation gate → payout to payee
- Narrative for each node in the flow, identifying the system/component responsible and the
data record created at each point
- Identification of any intra-day float period and how it is managed
Populate the Audit plan section (§7) with:
- Internal audit cadence (at minimum annual; quarterly is FCA best practice for high-volume firms)
- External auditor role and the engagement scope — from 7 May 2026 SUP 3A sets the safeguarding
audit requirements; an institution that has not been required to safeguard more than £100,000
of relevant funds at any time for at least 53 weeks is exempt (SUP 3A.1.1R(2))
- Regulator-readable evidence pack: the specific data and reports that would satisfy an FCA
supervisory review — including the monthly safeguarding return (REP027), submitted within 15
business days of each month end under SUP 16.14A, with content set by SUP 16 Annex 29BR. The same
return applies to authorised PIs, authorised and small EMIs, credit unions issuing e-money and
SPIs that opt in. REP-CRIM is a different return: the Annual Financial Crime Report (SUP 16.23,
form in SUP 16 Annex 42AR), which SUP 16.15.5AD applies to EMIs; the FCA Approach Document lists
it for EMIs with revenue of £5 million or more
Populate the Failure scenarios and recovery section (§8) with at least three scenarios:
- Safeguarding bank failure — how funds are protected (FSCS applicability, portability to a
second bank, insolvency priority claim)
- Reconciliation shortfall — escalation path, FCA notification obligation, remediation timeline
- Payout blockage — what happens if the safeguarding bank freezes the account (e.g., Sanctions
screening hit on the account) and how the firm continues to meet redemption obligations
Step 8 — Write the artefact
Create the output directory if it does not already exist:
<project_dir>/payments-compliance/
Before writing, read .arckit/references/quality-checklist.md and verify all Common Checks plus the FSSAFE per-type checks pass. Fix any failures before proceeding.
Use the Write tool to save the completed document to:
projects/<NNN>-<slug>/payments-compliance/ARC-<NNN>-FSSAFE-v1.0.md
Append the standard ArcKit Document Control footer at the end of the document:
---
**Generated by**: ArcKit `$arckit-uk-fs-safeguarding` command
**Generated on**: [DATE]
**ArcKit Version**: [VERSION]
**Project**: [PROJECT_NAME]
**Model**: [AI_MODEL]
The provenance-stamp.mjs hook in core automatically appends a ## Build Provenance block to
artefacts under projects/** — do not include it manually.
Step 9 — Output summary
Print the summary per ## Output Summary below. Do not echo the full artefact.
Important Notes
- **Safeguarding obligations apply from the moment funds are received, not when payment is
initiated.** The segregation trigger is receipt of funds, not initiation of the payment
transaction. Any float period between receipt and placement in the designated account must be
explicitly documented and minimised.
- **Insurance and guarantee methods require the policy or guarantee to be in place BEFORE the
relevant funds are received.** EMR 2011 Reg 22(1) and PSRs 2017 Reg 23(12) require relevant
funds to be covered by the policy or guarantee, so a retroactive arrangement does not satisfy
them. From 7 May 2026 the firm must also notify the FCA at least 2 months before it relies on the
insurance or guarantee method for the first time, changes the amount of cover, or changes its
insurer or guarantor (CASS 15.5.7R).
- Reconcile at least once each reconciliation day. From 7 May 2026 CASS 15.8.19R (internal)
and CASS 15.8.42R (external) require safeguarding reconciliations as frequently as necessary and
no less than once each reconciliation day (a business day). Whether to add intraday
reconciliations is the firm's own decision, based on its volumes and risk; there is no
regulatory volume threshold for it.
- Define the shortfall notification triggers explicitly. CASS 15.8.60R requires the firm to
inform the FCA in writing without delay in the cases it lists, including where it will be
unable to, or materially fails to, pay a shortfall into a relevant funds account or conduct its
reconciliations. "Materially" is not given a numeric threshold; document the firm's own
definition (e.g., a shortfall exceeding £X or Y% of safeguarded funds), have it approved by the
Compliance Officer, and make it trigger notification to the individual responsible for
safeguarding oversight (CASS 15.2.4R) and the FCA.
- Name the individual responsible for safeguarding oversight, and do not assume SM&CR.
CASS 15.2.4R requires every safeguarding institution to allocate to a single director or senior
manager responsibility for overseeing operational compliance with the relevant funds regime and
for reporting on it to the governing body. SM&CR applies only to FSMA-authorised firms (those
with a Part 4A permission, such as a bank or building society). A PI or EMI authorised only
under the PSRs 2017 or EMRs 2011 is outside it: record the director or person responsible for
management notified to the FCA (PSRs 2017 reg 6(7)(b); EMRs 2011 reg 6(6)(b); the "PSD
Individual" or "EMD Individual" in the Approach Document, paras 3.107–3.111). Use an SMF title
only if the firm is within SM&CR. HM Treasury's Modernising Payment Services Regulation
consultation (14 July to 6 October 2026) asked whether senior managers of payment and e-money
institutions should carry enhanced accountability; check whether a decision has followed.
- The safeguarding bank itself is a critical dependency. If the safeguarding bank fails,
freezes the account, or terminates the relationship, the firm may be unable to meet payout
obligations within the regulatory timeframe. Feed the safeguarding bank into the firm's CTP
(Critical Third Party) dependency register — use $arckit-uk-fs-ctp-dependency for this.
- Design for the monthly safeguarding return from the start. The return (REP027) is submitted
within 15 business days of each month end (SUP 16.14A.3R) and its content is set by SUP 16
Annex 29BR. Design the reconciliation data flow to produce those fields; retro-fitting reporting
fields after the system is built is a common and costly error. Do not label it REP-CRIM: REP-CRIM
is the Annual Financial Crime Report (SUP 16.23, SUP 16 Annex 42AR), not a safeguarding return.
- Allied Wallet and Premier FX: what went wrong. The FCA petitioned to wind up Allied Wallet
(an EMI) in July 2019 because it appeared to be mixing funds received from merchants and card
issuers with its own; the High Court later found that concern well-founded, with significant sums
missing (Re Allied Wallet Ltd [2022] EWHC 1877 (Ch)). The FCA's Final Notice to Premier FX
(an API, 23 February 2021) found that only its main sterling account was designated as a client
account, that customer funds were commingled with other customers' and the firm's own funds, and
that customers were misled about how their money was held. Both failures came from treating
safeguarding as a one-time setup task rather than a continuous operational control. This document
must be reviewed at least annually and whenever the firm's products, volumes, or safeguarding bank
arrangements change.
- PS25/12 safeguarding reform (FCA, August 2025). PS25/12, following consultation CP24/20
(September 2024), made the Payments and Electronic Money (Safeguarding) Instrument 2025
(FCA 2025/38), in force 7 May 2026. It added CASS 15 (safeguarding rules, including daily
reconciliations), CASS 10A (resolution pack), SUP 3A (safeguarding audits) and SUP 16.14A (the
monthly safeguarding return). PS25/12 also describes later "end-state" rules that would replace
the EMR and PSR safeguarding requirements with a trust-based regime; check their status before
relying on this assessment. (PS24/9 is an unrelated policy statement on payment for investment
research; do not cite it for safeguarding.)
Required Citations
Each of these URLs was verified as live at authoring time. Include all of them in the §9 References
section of the generated document. Verify against the source before relying on this output — FCA
and legislation.gov.uk publications are updated without prior notice.
Note on the FCA Dear CEO letter on safeguarding: No January 2020 letter on safeguarding could
be found on fca.org.uk. The FCA's safeguarding Dear CEO letter is dated 4 July 2019 ("Non-bank
payment service providers – requirements for safeguarding of customer funds",
<https://www.fca.org.uk/publication/dear-ceo-letters/dear-ceo-letter-non-bank-payment-service-providers-requirements-for-safeguarding-of-customer-funds.pdf>),
followed by the portfolio strategy letter for payment services firms and e-money issuers of
9 July 2020. The FCA marked both letters historical in May 2025, so cite them only as background.
The current safeguarding expectations are in the Approach Document (May 2026 edition,
Chapter 10), PS25/12 and CASS 15.
Note on the FCA Handbook links: The FCA Handbook at
handbook.fca.org.ukhas stable links
to each chapter and section:
handbook.fca.org.uk/handbook/cass15opens CASS 15,
handbook.fca.org.uk/handbook/sup16/sup16s14aopens SUP 16.14A and
handbook.fca.org.uk/handbook/sup16/sup16s154opens SUP 16 Annex 29BR. Cite the section that
holds the rule. Older
www.handbook.fca.org.uk/handbook/SUP/16/links redirect inconsistently.
| Reference | Verified URL |
|-----------|-------------|
| Electronic Money Regulations 2011 (SI 2011/99) — Reg 20 safeguarding | <https://www.legislation.gov.uk/uksi/2011/99/regulation/20> |
| Electronic Money Regulations 2011 (SI 2011/99) — full instrument | <https://www.legislation.gov.uk/uksi/2011/99> |
| Payment Services Regulations 2017 (SI 2017/752) — Reg 23 safeguarding | <https://www.legislation.gov.uk/uksi/2017/752/regulation/23> |
| Payment Services Regulations 2017 (SI 2017/752) — full instrument | <https://www.legislation.gov.uk/uksi/2017/752> |
| Payment Services and Electronic Money — Our Approach (FCA, May 2026) | <https://www.fca.org.uk/publication/finalised-guidance/payment-services-electronic-money-approach.pdf> |
| FCA PS25/12 — Changes to the safeguarding regime for payments and e-money firms (August 2025) | <https://www.fca.org.uk/publications/policy-statements/ps25-12-changes-safeguarding-regime-payments-and-e-money-firms> |
| FCA 2025/38 — Payments and Electronic Money (Safeguarding) Instrument 2025 (in force 7 May 2026) | <https://api-handbook.fca.org.uk/files/instrument/Glossary-GEN-CASS-SUP/FCA%202025/38-2026-05-07.pdf> |
| FCA CP24/20 — Changes to the safeguarding regime for payments and e-money firms (September 2024) | <https://www.fca.org.uk/publication/consultation/cp24-20.pdf> |
| FCA Handbook CASS 15 — Payment services and electronic money: relevant funds | <https://handbook.fca.org.uk/handbook/cass15> |
| FCA Handbook SUP 16.14A — Safeguarding return: safeguarding institutions (monthly return, SUP 16.14A.3R) | <https://handbook.fca.org.uk/handbook/sup16/sup16s14a> |
| FCA Handbook SUP 16 Annex 29BR — Safeguarding return (content of the return) | <https://handbook.fca.org.uk/handbook/sup16/sup16s154> |
| FCA EMI and Payment Institutions — key publications | <https://www.fca.org.uk/firms/emi-payment-institutions-key-publications> |
Output Summary
After writing the artefact, print only:
- File path written
- Safeguarding method selected (segregation / insurance / guarantee)
- Designated safeguarding bank or insurer name (if provided in user input)
- Reconciliation frequency confirmed
- Any items requiring legal sign-off or flagged as CONDITIONAL before production implementation
- Citation count
Suggested Next Steps
After completing this command, consider running:
$arckit-uk-fs-ctp-dependency-- The safeguarding bank or insurer is itself a critical dependency — assess it in the CTP dependency register.$arckit-risk-- Safeguarding failure is a high-impact Orange Book risk — cross-reference it in the project risk register.$arckit-operationalize-- Reconciliation runbook is a day-2 operational artefact — assemble it via $arckit-operationalize.$arckit-adr-- Safeguarding method choice (segregation vs insurance vs guarantee) is an architectural decision worth recording.